高灘河 的英文怎麼說
中文拼音 [gāotānhé]
高灘河
英文
gaotan he-
The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage
錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。2, by detailed studying of sedimentary microfacies, guan 3 - 6 beds mainly belong to high crooked fluvial deposition system, and some parts of guan 5 - 6 show plait fluvial deposition system features : detailed divided them into edge beach, center beach and natural levee etc. 9 deposition microfacies and beach ridge and groove microficies
2 、通過沉積微相多層次逐級細分研究,認為館3 - 6砂層組主要屬于高彎曲度曲流河沉積體系,館5 6部分小層表現為辮狀河沉積體系;並細分出了邊灘、心灘以及天然堤等九種沉積微相,以及灘脊和凹槽等微微相。On the basis of remote sensing technique ' s good characteristic with large - area, multi - time, multi - photograph variety, manifold abundant spectral information and high ground resolution, the fault tectonics frame, river geomorphy ( such as terrace, floodplain, shoal, etc ) and suspended load, etc. were explained after analyzed the fault tectonics, river geomorphy, characteristic in the tm image by gray bar statistics, primary component analyses, tm741 image integration, line convolve enhancement and model recognition etc. especially 9 piece of fault tectonics were explained in this thesis, in succession, the impacts of the factors severally were analyzed
遙感技術具有大范圍、多時相、多片種、多層次、含有豐富的光譜信息及具有較高的地面解析度的特點。本文利用該技術,運用灰階統計特徵分析和主成分分析、 tm741多波段融合、線性卷積增強、模型提取等一系列遙感解譯分析方法,分析了斷裂構造、河流地貌(階地、漫灘、沙洲)及懸浮物等在tm遙感圖象上的影像特徵,解譯出了安徽南部斷裂構造格架、河流地貌和懸浮物的分佈,並新解譯出了9條近東西向的斷裂。The flood damage exposes the contradiction between people and flood, population explosion results in that people need more and more land for farming, a lot of flood - plain, flood - plain protection, retarding basin, and ever floodway are occupied by farmers for agricultural purpose. so that major or even middle and small flood can not be smoothly discharged in the river
這場洪災暴露了建國以來治淮工作中久而未決的一個問題,即局部地區為了解決人多地少的問題,大量侵佔河道行洪灘地,與洪水爭地,不給洪水出路,使得本已不堪重負的河道,即使是中、小洪水來臨,也處在高水位狀況下運行,加劇了中、下游地區的防洪風險。The field observation of the sediments of storm surge produced by no. 11 typhoon in 1997 shows that sedimentation rate of storm surge sediments are greater than that of normal astronomical tide sediments, and the grain size shows relative coarse with poor sorting. vertical sequences of the storm sediment show parallel bedding and overlapped by hummock bedding. these characteristics provide good basis for building the index of storm surge deposit
通過對梁垛河閘9711號臺風的現場觀測並結合目前已有的風暴潮沉積的研究,分析了風暴潮沉積在構造和結構上的特點,從而建立了正常潮灘沉積中風暴潮沉積的識別標志,同時在野外觀測中還發現即使在風暴潮期間,高潮灘上部仍存在只有淤積沒有侵蝕的地帶。My next care was for some ammunition and arms ; there were two very good fowling - pieces in the great cabbin, and two pistols, these i secur d first, with some powder - horns, and a small bag of shot, and two old rusty swords ; i knew there were three barrels of powder in the ship, but knew not where our gunner had stow d them, but with much search i found them, two of them dry and good, the third had taken water, those two i got to my raft, with the arms, and now i thought my self pretty well freighted, and began to think how i should get to shore with them, having neither sail, oar, or rudder, and the least cap full of wind would have overset all my navigation
這時,我只好用槳作錨,把木排一邊固定在一片靠近河岸的平坦的沙灘上,以等待潮水漲高,漫過沙灘再說。后來,潮水果然繼續上漲,漫上沙灘,等水漲得夠高了,我就把木排撐過去,因為木排吃水有一尺多深。到了那兒,我用兩支斷槳插入沙灘里,前後各一支,把木排停泊好,單等潮水退去,就可把木排和貨物品平安安地留在岸上了。According to all the sediment peaks of 35 floods observed at each station on the downstream of xiaolangdi, it analyzes the characteristic of delayed sediment peak and establishes a regression equation between sediment peak lag time for each section of xiaolangdi, huayuankou, jiahetan, gaocun, sunkou, aishan and lijin and peak discharge, sediment concentration of the peak, flood propagation velocity and fall velocity of suspended load of the previous station, which can search, make up and extend sediment peak lag time and provide a basis for accurate forecasting on sediment peak travel time of each station on the lower yellow river
根據小浪底下游各站沙峰均滯後於洪峰的35場洪水,對沙峰滯後於洪峰的特性進行了剖析,建立了小浪底、花園口、夾河灘、高村、孫口、艾山、利津各河段沙峰滯后時間與上站洪峰流量、沙峰含沙量、洪水傳播速度、懸移質泥沙群體沉速之間的回歸方程,可以用來查補延長沙峰滯后時間,為下游各站沙峰傳播時間的準確預報提供依據。The curves of the consolidation settlement in soft clay base of flood land are gained, which compare the effect of sand drain. the settlement - time curves in different period are also gained, which increase the height of embankment to 8m, based on the test data of hang - yong highway. furthermore, the consolidation settlement characters of these entity engineering are analyzed, and, the variation rules of the rate of grade and degree of the curves in different period in the whole section, the maximal settlement and the liner regression relations between the rate of grade and degree are calculated
本文利用大變形固結有限元分析程序( lscfea )中的小變形平面固結分析單元( sse2 ) ,結合實體工程項目進行了地基固結沉降的有限元計算,分別得出河灘相軟土地基在考慮砂井和未考慮砂井作用下的固結沉降曲線及杭甬高速公路試驗段在高堆載情況下的固結沉降曲線;並對以上曲線特徵進行了分析,得出各時間段曲線斜率、角度在整個斷面的變化規律,以及沉降最大值與斜率、角度變化之間的線性回歸關系。By the analysis and study, it is showed that : 1 ) the lower weihe river main channel was at a balanceable state between aggradation and degradation and floodplain of the lower weihe river is a tiny aggradation state before the construction of the sanmenxia dam ; 2 ) the severe aggradation of the lower weihe river bed is mainly caused by the increasing riverbed elevation at tongguan after the construction of the sanmenxia dam ; 3 ) the main reason leading to the increasing riverbed elevation at tongguan is the unreasonable operation of the sanmenxia reservoir ; 4 ) the rate of the riverbed aggradation at tongguan reach and the lower weihe river reach are speeded by adverse condition of incoming water and sediment recently
然後以實測資料為基礎分析研究了三門峽建庫前後潼關高程的變化規律以及渭河下遊河道的沖淤演變規律,分析研究表明:建庫前渭河下游主槽處于動態沖淤平衡狀態,灘地處于微淤狀態;建庫后,渭河下遊河道發生嚴重淤積主要是由於潼關高程的抬升造成的;潼關高程的抬升主要是由於三門峽水庫的不合理運用造成的,近期不利的水沙條件加劇了潼關河床的抬升速度和渭河下游的淤積。Article 33 it is forbidden to pile or deposit solid wastes and other pollutants on beaches and bank slopes below the highest water level of rivers, lakes, canals, irrigation channels and reservoirs
第三十三條禁止在江河、湖泊、運河、渠道、水庫最高水位線以下的灘地和岸坡堆放、存貯固體廢棄物和其他污染物。From the model experiments, riffles in observed channel disappeared and were replaced by narrow depth channel with deeper stages
在實驗過程中,河道之河灘地形相繼消失,取而代之是明顯的深槽,使水深相對的提高。It is a unique example of a complex of ecosystems, including tidal flats, floodplains, lowlands and plateaux, and provides a habitat for a wide range of rare or endemic species of plants and animals
該國家公園代表了一個復雜的生態系統,其中的潮灘、河漫灘、低地和高原為當地大量的珍稀動植物提供了優越的生存條件。The comparison of the component particles of baijiaziu profile and mafangtan profile with that of modern flood plain substance of weihe river indicates that the river impetus of weihe river has gradually been getting weaker, which reveals that it has gradually been getting dryer since the last 1300 years
西安高陵白家嘴河流沉積物粒度隨深度的變化及其與渭河現代河漫灘沉積物粒度特徵的對比表明,渭河近1 3ha來有流量減少,流速減慢,水深變淺的發展趨勢。The second stage of the uprating engineering works were implemented after the signing of the agreement in august 1979 endorsing the planning report for the second stage extension of the dongshen water supply system. the main works were to extend the pumping facilities at matan, tongxia, zhutang, shaling, shanpu and yantian, and to increase the height of the main dam of shenzhen reservoir by 1 metre. the new works included the construction of a new pumping station - the dongjiang pumping station at the intake point at the riverbank of dongjiang to increase the volume of supply
第二期工程於1979年8月簽訂《東江深圳供水工程第二期擴建規劃報告》協議后進行,主要是再擴大原工程在馬灘、塘廈、竹塘、沙嶺、上埔及雁田的抽水站,加高深圳水庫主壩1米,新建的工程則包括于新開河口興建東江抽水站,提高供水數量。Abstract : variations of flow pattern, flow velocity in deep poo l and side bar, mainstream thread, and water surface, caused by excavation project, are investigated by two - dimensional mathematical model in an orthogonal curvili near coordinate system. the change of bed - load transport rate, and redeposition r ate are predicted. the influences of the excavation project on navigation are ana lyzed. grid - type and flat - type excavation alternatives are proposed and discuss ed
文摘:採用正交曲線坐標系下的河道平面二維數學模型,研究了嘉陵江何家磧邊灘采砂后河道流勢、流態、灘槽流速、主流位置、水面高程及比降的變化規律,預測了采砂方案完成後卵石推移質輸沙率變化及其對航道的影響,並對格形開挖和平整開挖方案進行了比較分析The vessel was later intercepted by two fast police pursuit craft off lung kwu tan at about 1 am the following day, while attempting to leave hong kong
水警的高速追截船于翌日凌晨一時在龍鼓灘截停該艘正離開本港的貨船,並將貨船拖往屯門內河船碼頭作進一步調查。North berwick north berwick is a true links with commanding views of the sea, over great wide sandy beaches, across the dark rocky islets of the forth estuary to the green - hilled fife coast, the volcanic grey and white streaked hump of the bass rock and distant may island on the horizon
越過大面積寬闊的沙灘,穿過福斯灣河口的黑巖小島,去到遍布綠色山野的費弗海岸灰白相間的火山巖巴斯巖和遠在天邊的五月島,北貝里克郡是真正可以俯瞰海景的高爾夫球場。The instrument adopts the theory of ultrasonic echo for quickly scanning river bed topography under water and employs the principle of resistance for measuring river bed topography upon water and shallow beach topography, which increases the measuring speed effectively and decreases the disturbing influence on river bed
該儀器採用超聲測量原理實現了水下地形的無接觸快速掃描測量,採用阻抗原理實現了洲灘、邊灘、淺灘的地形測量,有效提高了測量速度,並減小了對河床的擾動影響。Woods, hill streams, mangroves, intertidal mudflats, sandy shores, rocky shores and coral communities and vivid photographic records of a rich array of flora and fauna in hong kong. glossary and game card hard and soft copies
11張全彩色,圖文並茂的展板,闡述香港自然環境的變化,內容包括介紹高地灌叢風水林河溪紅樹林潮澗帶泥灘沙灘巖岸及珊瑚群落等生態環境。分享友人