高瓦 的英文怎麼說

中文拼音 [gāo]
高瓦 英文
gua-dob
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 瓦動詞(蓋瓦) tile; put tiles on a roof; cover (a roof) with tiles
  1. Development on ventilation automatism changer in high gas excavation face

    高瓦斯掘進工作面通風方式自動交換器的研製
  2. Comprehensive control of gas at high gas coal face

    高瓦斯採煤工作面的斯綜合治理
  3. Mining high gas coal seam with enclosed mining method

    封閉式採煤法開采高瓦斯煤層
  4. Mining area tunnel arrangement in high gas coal seams

    高瓦斯煤層采區巷道布置
  5. Good, the squares formed by crossed lines are reined in gao waer

    好了,格勒高瓦
  6. The complex control technology of gas on full mechanized work face in the high gas coal well

    高瓦斯礦井綜放工作面斯綜合治理技術
  7. Methane drainage experimental research for the stress - relief roof stratum of working face of high gas coal seam

    高瓦斯綜采面頂板覆巖卸壓抽放斯試驗研究
  8. Gas prevention and control of high gassy districts in low gassy mines

    斯礦井中高瓦斯區的斯治理
  9. Methane comprehensive control for driving face in gassy coal mine

    高瓦斯礦井掘進工作面的斯綜合治理
  10. Comments on comprehensive gas control technology for high gassy mine

    淺析高瓦斯礦井的斯綜合治理技術
  11. Gas control and practice in high gassy coal face with blasting mining

    淺談高瓦斯礦井炮采工作面斯治理與實踐
  12. Probing into comprehensive gas control technique in high gassy working face

    高瓦斯工作面斯綜合治理技術探討
  13. In the process of construction, some special geological hazards will be met because of the great depth and long distance, such as high external waterpressure, watergushing, high geostress, rockburst, high geotemperature and nocuous gas and so on. these geological hazards become the main restricted factors of tunnel construction

    大埋深將使隧洞開挖施工時遭遇到如外水壓及壓涌水、地應力及巖爆、地溫、高瓦斯有害氣體等一系列地質災害問題,這成為制約深埋隧洞建設快速發展的主要因素。
  14. Establishing a perfect gas monitoring and measuring system to ensure safety operation of an air separation plant

    高瓦斯礦井安全監測監控系統的應用與改進措施
  15. I know the electrical appliances made in that country require high wattage.

    我知道那個國家製造的電器都是高瓦數。
  16. Supporting technology with meshing and bolting in high gas, inflammable, soft - broken coal seam

    高瓦斯易燃松軟破碎煤層錨網支護技術
  17. The geological conditions are very complicated in hejiazhai tunnel which is located in guizhou shuibo railway, this tunnel is named " mashed tunnel " with the most difficult geological conditions such as the high dense gas and developed karst and gushing water assembled together, the geological hazards like the gushing water and sand, the collapse of tunnel, surface subsidence and slide, cracking of tunnel lining were often happened during construction period

    摘要貴州水柏鐵路何家寨隧道,工程地質條件極其復雜,集「高瓦斯、強巖溶、大涌水」為一體,施工期間曾發生多次涌水涌砂、洞內坍方、地表塌陷與滑坡、支護襯砌開裂變形等地質災害,堪稱水柏鐵路施工難度最大的「爛洞子」 。
  18. Investigation of the tunnel layout way at high gas seam group mining area

    高瓦斯煤層群采區巷道布置方式的探討
  19. Gas comprehensive treatment of high gas and high - stress area in gaocheng coal mine

    告成礦高瓦應力區斯綜合治理技術
  20. According to the present state that corrugated rollers life - span in our country is far lower than that abroad, corrugated rollers material has been analyzed deeply in this paper. a lot of experiments have been done on nine kinds of steel materials. through the analyses of hardness and micrographs of these heat - treated materials, new materials of corrugated roller have been picked up, which can prolong corrugated rollers life - span remarkably

    針對目前國內楞輥工作壽命遠遠低於國外水平的現狀,從楞輥的材質入手,在分析楞輥常用材質的基礎上,對九種可供選擇的材質進行了大量的科學試驗,根據熱處理后硬度及顯微組織分析,從中優選出了楞輥的新材質,最終找到可大幅度提高瓦楞輥工作壽命的新途徑。
分享友人