高空實驗室 的英文怎麼說

中文拼音 [gāokōngshíyànshì]
高空實驗室 英文
high-altitude laboratory
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 空Ⅰ形容詞(不包含什麼; 裏面沒有東西或沒有內容; 不切實際的) empty; hollow; void Ⅱ名詞1 (天空) s...
  • : Ⅰ形容詞1 (內部完全填滿 沒有空隙) solid 2 (真實; 實在) true; real; honest Ⅱ名詞1 (實際; 事實...
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 高空 : high altitude; upper air; welkin高空病 airsickness; altitude sickness; aeroembolism; hypobaropath...
  1. Fundamental of laser 40ar / 39ar dating method : our laboratory has successfully set up the laser microprobe 40ar / 39ar geological dating method. our works include adjustment of the high - gain electron multiplier in mass spectrometer and correction of mass discrimination, adjustment of the laser, test for absorption ability of minerals to laser, designing and manufacturing high - vacuum sample chamber, sample preparation and irradiation, research on the variability of j values on the surface of rock chips, measuring atmospheric argon, determination and correction of blanks and ages, etc. the laser microprobe technique is particularly effective for some geological samples. it can be used, for example, for research of distribution of the components in extremely small samples that are very difficult to be separated and purified and those which contain excess argon

    本文首先從常規~ ( 40 ) ar ~ ( 39 ) ar階段升溫定年的改進入手,進而建立了激光~ ( 40 ) ar ~ ( 39 ) ar定年,利用這兩種先進同位素地質定年方法,結合其他手段,對青藏原腹地和北緣的阿爾金斷裂系多期地質事件進行了詳細的同位素年代學研究:一、參照國際先進的流程,對我們的常規~ ( 40 ) ar ~ ( 39 ) ar階段升溫在樣品的預處理、樣品的照射條件和系統白測量及校正等方面進行了改進,使之產出的同位素年代數據更可靠並為國際同行所承認。
  2. There are the production lines established of intermediate - frequency melting, silicasol shuck, precision casting and metal ceramic, and 250 universal devices suck asvacuum melting electric furnaces, high - temperature and intermediate - temperature heat treatment electric furnaces, digitai - control lathes, milling and drilling machines, coreless millers, spherical surface millers, standing milling machines and so on, lt has established the central measuring roomm physicallab, chemical lab, metallic phase lab, crack detection test lab, seat ring lab, rocker lab and ducgt trestle lab, our esported gas engine valve seat to america was rewarded the second prize in terms of sichuan high - quality product

    建有中頻熔煉真熔煉硅膠溶模精密鑄造粉末冶金生產線。有中頻電爐真熔練電爐中溫熱處理電爐數控車床鉆銑床無芯磨外園磨立磨等通用設備250臺套。有中心計量物理化學金相探傷檢測及座圈搖臂導管臺架
  3. For the circuit - breakers of rated voltage 252kv up, the synthetic test methods are introduced according now condition because of the limitation of the transformer short - circuit capacity. the correlative prescribes on switching line - charging current in gb / t1984 - 200x " alternating - current high - voltage circuit - breaker " are discussed according to the test results and theoretic analysis

    由於開合載架線路試對電源側的阻抗有明確的規定,這就要求試電源必須具有足夠大的短路容量,很難滿足要求,因此,一般對較電壓等級的斷路器採用合成試方法,本文介紹了利用現有條件,對252kv以上電壓等級的斷路器採用合成試時的試線路。
  4. The incident wave height h1 / 3 is in the range from 0. 1m to 0. 25m, and the peak period tp in the range from 1. 0s to 2. 0s. the ratio of s / h1 / 3, which refers to the subface level of wharf deck ( s ) to the incident wave height ( h1 / 3 ), is between - 0. 1 and 0. 7. three different shore connecting types : open - piled, permeable slope with armored 1ayer of dolosse b locks and impermeable slope with armored layer of concrete plate, are set in the experiment for the research on the effects of boundary condition with different shore connecting types on the wave impact

    本文的物理模型試在大連理工大學海岸和近海工程國家重點的大波流水槽中進行,試中選用的隨機波靶譜為改進的jonswap譜,入射波波h _ ( 1 / 3 )范圍為0 . 1m 0 . 25m ,譜峰周期t _ p范圍為1 . 0s 2 . 0s ,碼頭面板的相對凈(碼頭面板底面距離靜水面的距離s與入射波波h _ ( 1 / 3 )的比值)范圍為- 0 . 1 0 . 7 ,其中s / h _ ( 1 / 3 )為負值時表示碼頭面板底面位於靜水面以下。
  5. Electro - hydraulic servo loading system ( ehsls ) is an important simulation system in hard ware - in - loop flight simulation laboratory, which can simulate aerodynamic loads acting on flight vehicle, such as missiles, planes. its performance of test is important on the design of flight vehicle

    電液伺服負載模擬器是半物模擬試中模擬飛行器在飛行中舵面所受氣動力載荷的重要設備,它的試能力低對飛行器設計起著重要作用。
  6. The aerated behaviours in cavitation region of high velocity flow through the non - circulating water tunnel are investigated by using the advanced experimental facilities in the hydraulics laboratory at zhejiang university of technology

    摘要本文用先進的量測儀器在浙江工業大學水力學直流式水洞中分別對速水流化區、蝕區的摻氣特性進行了較為系統的試研究。
  7. He has written more than 40 peer - reviewed articles for technical publications, consults with major e - commerce vendors including visa and the federal reserve, and has served as principal investigator on grants from air force research labs, darpa, national science foundation, and nist s advanced technology program. he can be reached at

    他為技術刊物撰寫了40餘篇經過同行檢測的文章,擔任過主要的電子貿易供應商,包括visa和federal reserve的顧問職務,並在軍研究、 darpa 、國家科學基金會,以及nist的級技術項目贊助下擔任其首席調研員。
  8. Points out that supplying fresh air is not sufficient in decreasing indoor air pollution and good ventilation is the pivotal guarantee in improving indoor air quality

    通過分析和對比,指出新風量不能從根本上降低內污染物濃度,良好的通風換氣是提氣質量的有效保證。
  9. The research in this paper has been supported by the supercavitating hydro - mechanics theory on the super - velocity underwater weapon research program administered by the office of nation defense key lab fund ( contract 99js21

    本論文的選題來源於國防重點基金課題「超速水中兵器的超泡水動力原理研究」 ( 99js21
  10. The research in this paper has been supported by the super - cavitating hydro - mechanics theory on the super - velocity underwater weapon research program administered by the office of nation defense key lab fund ( contract 99js21. 1. hko302 ), and it is the important part of the program

    本論文的選題來源於國防重點基金課題「超速水中兵器的超泡水動力原理研究」 ( 99js21 . 1 . hko302 ) ,並是該課題研究內容的重要組成部分。
  11. Chaoli invested large amount of fund in establishment of automobile air - conditoner testing and evaluation centers, including the following labs and testing chambers

    超力科投巨資建立了汽車調試評價中心,包括下列已有的和現有的和試設備。
  12. And some useful rules are concluded from these experiments. the pd signals on different frequency scopes are surveyed, and the thesis explores anti - noise narrowband detection of partial discharge signals. for the first time the thesis brings forward the choosing - frequency detection of pd ground on the radio frequency communication

    同時,進行了局部放電不同頻段信號檢測,為窄帶抗干擾檢測技術奠定基礎,並首次提出基於射頻通訊原理的選頻檢測原理及檢測設想;在中進行了局部放電超頻信號的檢測,證了超頻法檢測局放信號時對間電暈干擾的抑制作用。
  13. Today the business we involve include designing and construction epoxy resin floor, epoxy resin fiberglass floor, epoxy mortar gravity flow flat floor, epoxy resin anti - electrostatic floor, pvc anti - electrostatic ( sheet, roll ) floor, full - steel anti - electrostatic raised floor various grade of indoor air cleaning works for precise electronic factory, hospitals, gmp pharmaceutical factories, bio - chemical labs, food factories, etc. as well as pu runways, acrylic courts, we are committed to offering you a dust - free, clean and beautiful workplace and office

    本公司迄今為止,主要承接設計施工現代化廠房的環氧樹脂地板、環氧樹脂砂漿自流平地板、環氧樹脂防靜電地板、 pvc防靜電(片材、卷材)地板、全鋼防靜電架地板工程等和精密電子廠、醫院、 gmp藥廠、生化、食品廠內的各種級別氣凈化工程及pu跑道,亞克力球場工程,敬此為貴公司提供一個無塵、潔凈、亮麗的生產環境及辦公環境。
  14. High speed computing center in institute of space science ( iss / ncu ) provides high speed computing environment for students and faculty

    速計算提供速運算的軟硬體環境、大型影像輸出設備。
  15. Abstract : the method of using formaldehyde buffer solution a b sorption - hydrochloric pararosaniline spectrophotometry to determine sulfur diox ide in air has higher sensitivity and good selectivity, and prevents from adoptin g mercurial absorbent. but the conditions in lab are not well controlled, the v alue of reagent blank and standard curvilinear slope can ' t accord with the one s tipulated in “ methods for air and waste gas monitoring and analysis ”. some opra tional techniques for so2 determination in lab are introduced for reference

    文摘:以甲醛緩沖溶液吸收-鹽酸副玫瑰苯胺分光光度法測定氣中的二氧化硫,方法靈敏度,選擇性好,避免了使用含汞的吸收液,但如果條件控制不好,試劑白值及標準曲線的斜率就會不符合《氣和廢氣監測分析方法》中規定的值,本文著重從操作技巧方面對二氣化硫測定的質量控制進行分析,僅供參考。
  16. In this dissertation, firstly, characteristics of no - load overhead line and processes of switching no - load overhead line by circuit - breakers are analyzed, then, transient recovery voltage across circuit - breaker are calculated emphatically and the factors of affecting transient recovery voltage are analyzed

    這就要求斷路器具有良好的開合載架線路的能力。進行開合線路充電電流試是考核斷路器開合載架線路性能的重要手段,通過試可以優化斷路器的設計、提斷路器開合載架線路性能。
  17. 2. the model experiment aimed at the aerodynamic effect of large high - speed landslides has been accomplished in wind tunnel laboratory for the first time. on the base of testing research, the paper studies different factor which influence the aerodynaxnic effect of flying 1andslide, and numerically simulates the aerodynamic effect with the help of the hydrodynamics finite element

    ( 2 )首次在風洞進行了針對大型速滑坡凌飛行階段氣動力學效應的模型,研究了影響飛行滑坡巖體氣動力學效應的不同因素;應用流體力學有限單元法對飛行滑坡巖體的氣動力學效應進行了數值模擬。
  18. High quality sensor, unique stress isolated technology and flexible installation and debugging method has ensure the best ratio of performance price for wide plus ds series differential pressure transmitter make it suitable for use in wide industrial field or laboratory to measured and controlled the furnace pressure, air flue pressure and air pressure

    質量的傳感器獨特的應力隔離技術以及靈活的安裝調試方式保證了wideplus ds系列差壓變送器的最佳性能價格比。它可廣泛應用於工業領域或進行爐膛壓力風道壓力氣壓力等的測量和控制。
  19. It use a psc to replace the switch, and implement the csma / cd in the network interface card ( nic ). when the throughput grows and transfer speed is raised, csma / cd will lower the network ' s performance, but think about such truths below, the half - duplex gigabit optic ethernet will have some market space. first, there still exist large amount of small - size local network nowadays ; but they require high transmit speed, such as studio, lab etc, especially multimedia, graph and image processing, virtual reality and advertising

    但是,在目前情況下,出於以下幾個方面的考慮,使用csma cd方式的半雙工千兆位網路也有它的發展間:第一、在目前的情況下,有大量的小型局域網存在;但是又要求的傳輸速率,如工作等工作組級的網路,尤其是現在十分常見的多媒體應用、圖形圖像處理、虛擬現與廣告渲染等方面。
  20. The reason is very simple. the density in the stellar and interstellar environment is extremely low, lower than any vacuum conditions that we can create in the laboratory. such conditions are a far cry from the hot, dense environment in the great depths of the earth where diamonds are formed

    理由很簡單,恆星大氣和星際間環境的密度遠比任何能製造出來的真為低,這和地球深處又熱又密度的環境有著天淵之別,又怎可能製造出鉆石?
分享友人