點施 的英文怎麼說

中文拼音 [diǎnshī]
點施 英文
apply manure [fertilizer] in small holes near the plants
  • : Ⅰ名詞1 (液體的小滴) drop (of liquid) 2 (細小的痕跡) spot; dot; speck 3 (漢字的筆畫「、」)...
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  1. 1to complete shopping drawing accord the information and order from project management department, inc lay - out plan drawing adjust, detailed shopping drawing

    根據項目部提供現場資料進行深化設計,包括:平面布局調整、節點施工圖。
  2. If the direct pressure method cannot control bleeding, apply pressure over the arterial pressure points to facilitate blood coagulation. press for 5 to 10 minutes and never exceed 15 minutes

    如直接壓法仍未能止血,則可用動脈壓壓協助止血,壓時間為五至十分鐘,切勿超過十五分鐘。
  3. Selection and application of construction plan for crossing point of road and inclined shaft at same seam

    同一煤層平巷與斜巷交叉點施工方案的選擇應用
  4. He looked at her with a slight air of patronage

    他擺出一點施恩於人的神情看著她。
  5. Precision analysis and survey of additional spot in between two spots out of sight

    不通視補點施測及精度分析
  6. Goethe - institut learn german in germany - course locations - schwbisch hall

    Goethe - institut到德國學習德語-培訓地-韋比哈爾
  7. These equipments are of few number, easy to operate, no needing to be transported for long distance and reducing the separating of ca mortar mixture

    機具設備數量少,操作簡單,無需長距離輸送,減少了ca砂漿泌水與分離,簡化了工程序,並可靈活選擇作業地工周期短,機械化程度高,工人作業勞動強度低。
  8. To upgrade and improve tourist facilities and attractions, the tourism commission has introduced a district enhancement scheme in the central and western district, focusing on areas frequented by tourists like lan kwai fong, the central mid - level escalator and hollywood road

    旅遊事務署已在區內進行地區改善計劃,致力提升及改善中環及西區的旅遊設及景工地尤其集中於改善遊客眾多的蘭桂坊、半山行人電梯及荷李活道等游覽
  9. It is expounded that the main points of design, construction characteristics and precautions of a phc pipe pile when it is used for a site of backfilled stone layer, according to the design of phc pipe piles for an industrial mill building, which may be a reference for the same trade

    摘要結合某工業廠房的phc管樁設計,闡述了在有填石層特定場地條件下的設計要工工藝特和注意事項,可供同行借鑒參考。
  10. Concrete filled steel tube ( cfst ) arch bridge is a new type of bridge which is widely applied in china recently, and it is a relatively ideal structural form for long span arch bridge. with the background of the practice of liantuo bridge, in the view of point of feasible in technology and reasonable in economy, the key techniques and difficulties in the construction of cfst arch bridge are analyzed and discussed in the thesis. the disadvantages in the current design and construction and the improvement method are also indicated

    本文以蓮沱特大橋工程實踐為背景,以主拱工研究為主線,對鋼管混凝土拱橋重難點施工工藝,從技術上可行、經濟上合理的角度出發,詳細的進行了分析闡述,並指出了設計工中存在的不足和今後需改進的方向;通過對鋼管混凝土拱橋工過程中內力的計算,確定了拱肋工最不利荷載工況下加載重量、壓重順序和張拉臨時預應力束等一系列工措,並將計算結果與現場監測觀測數據進行了比較分析,為今後進一步研究這類結構提供了參考。
  11. Consequently, the precast components don ’ t need any interim falseworks to be supported in the mid - span as bottom forms when the laminated concrete lay is being placed. furthermore, to form two - way slabs, the transverse steels can be arranged through the rectangular cores in the ribs of the precast slabs as needed. it makes the construction of composite two - way slabs easier and more feasible, practical, and suitable to introduce and apply to the building construction on a large area

    由於預制構件具有剛度大和承載力高的特工時以預制構件作為樓板底模無需設置跨中臨時支撐;同時還能通過預制構件板肋預留的長方形孔布置橫向受力鋼筋實現樓板的雙向配筋,使預應力雙向疊合樓板的工簡單易行,更適合於大面積的推廣應用,具有較大的工程應用價值。
  12. Based on the study idea of the former pile else, this paper has conducted and discussed the mechanism of consolidation, settlement calculation and optimization design of the pcc pile according to the test in situ results and reasoning. it includes the followings in detail : ( 1 ) compared with the precast tube concrete pile and tube sinking concrete pile, the merits and shortages, construction machine, construction technology of the pcc pile and pcc pile composite foundation are introduced in detail to make the pcc pile be known completely by engineers

    本文在借鑒其他樁型的研究的基礎上,通過現場試驗研究和理論推導,對pcc樁處理軟基加固機理、沉降計算和優化設計等進行了較為深入的研究和探討,具體包含以下幾方面的內容: ( 1 )在與預制管樁和沉管灌注樁等樁型比較的基礎上,對pcc樁的優缺工機具設備、工工藝、技術作用機理以及pcc樁復合地基技術特等進行了述評。
  13. 2cooperate with project management department to reconnaissance project site, to communicate and get the finally affirm of all necessary drawing with client

    根據項目部提供現場資料進行深化設計,包括:平面布局調整、節點施工圖。
  14. Preparation for construction : the surface of the under layer should be even and firm, and in accordance with the design requirement, without loose material and flaccid site, and need to reroll 2 3 times within full - width range of the subgrade with vibrating roller before the construction, as well as test the compaction and defecting, to check whether there is unqualified point in the soil base

    工準備:工前下承層表面要平整、堅實,符合設計要求,無鬆散材料和軟弱地工前要用振動壓路機在路基全寬范圍內復壓2 3遍,同時進行壓實度及彎沉檢驗,檢查土基中是否有不合格
  15. Abstract : in this paper, the writers take the pile - plank wall applied in the railway from maga to putaoqin, a feeder railway to neijiang - kunmin railway line, as an example to introduce the structrue, the construction technology, the method of construction and the writers ? experience in construction. this research provides reference for the projects of the same kind

    文摘:以六盤水樞紐內昆鐵路引入線馬嘎至葡萄菁段樁板墻工程為例,介紹了樁板墻的結構特工工藝、工方法以及工中的一些體會,可為同類工程借鑒
  16. Hi spite of twenty years " usage in engineering, anchor jacked pile bases on no compellent theory. this paper works primarily in the following aspects : 1. introduction of anchor jacked pile as a new technique, few people realize it. this paper will introduce anchor jacked pile about its history, strongpoint, construction course, research status quo and some existent problems

    對錨桿靜壓樁作一個介紹錨桿靜壓樁作為一種新技術,目前還有很多人不是很了解,該部分對錨桿靜壓樁的發展歷史、自身優工過程、適用范圍、研究現狀以及存在的一些問題作了粗略的介紹。
  17. Fifth, the paper detailed study the characteristic, construct order, serum material, major construct process parameter, major construct equipment of technique and the construct process of composite grouting

    第五,本文對復合注漿技術工法的特工順序、漿液材料、主要工工藝參數、主要工設備及工工藝進行了詳細的研究。
  18. According to features of diffcult anti - washing construction of pier foundation under compley hydroraphic, gological, and water potential conditions, combining construction condition methods, author analyze and conclude key points and difficulties of anti - washing construction of the fourth main pier of great sutong bridge, and difficulties in construction and relevant countermeasures

    摘要針對在復雜的水文、地質、河勢條件下進行橋墩基礎沖刷防護工難度大的特,結合工工藝和方法,對蘇通大橋主橋4號主塔墩沖刷防護工中的重工中出現的不利隋況及應對措進行了分析研究。
  19. This article thinks that the country medical health care problems come from the absence of the effective " valid ways " which is different from the direct intervene from the government exposed on the country medical health care field but also from its general adoption of the market principle but to firstly divide the country medical health care into two parts according to the difference in the economic quality, named separately public health care and the basic medical. and then ascertain the government ’ s responsibility and administer the financial policies, build a complete valid financial guarantee system to keep the development of the country medical health care

    這種「治道」 ,既不同於以往政府對所有農村醫療衛生領域的直接干預,也不是主張將其全部市場化,而是要首先按照經濟性質上的差異,將農村醫療衛生合理劃分為公共衛生和基本醫療兩大領域,然後在此基礎上明確政府在每個領域應承擔的相應責任,並根據各自不同的特點施以不同的財政政策手段,進而形成一套完整有效的財政保障機制以保障農村醫療衛生事業的健康發展。
  20. Fertilizer application as compared to no fertilizer application at the network site in thailand for example, reduced soil loss up to 78 % and water runoff up to 65 % in 1994 ( table 2 )

    例如,在泰國1994年的一個研究網肥比不肥使土壤損失和徑流分別減少了78 %和65 % (表2 ) 。
分享友人