點計線 的英文怎麼說

中文拼音 [diǎnxiàn]
點計線 英文
dash-and-dot line
  • : Ⅰ名詞1 (液體的小滴) drop (of liquid) 2 (細小的痕跡) spot; dot; speck 3 (漢字的筆畫「、」)...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  1. The relation of radius of curvature and error as well as formulas of increasing parameters on condition of constant error are diverted. the equation of the line on the center of approximate circular arc is obtained , and it can avoids the trouble that numerical solution owns possibility of no convergence and simplifies node calculation of non - circular curve

    導出了曲率半徑與逼近誤差之間的關系和等誤差條件下的參數遞推公式,建立了通過逼近圓弧圓心的直方程和圓心坐標算公式.按這種方法用圓弧逼近平面參數曲,不需要求解非性方程組,避免了算可能不收斂的麻煩,簡化了非圓曲的節算過程
  2. Fieldbus is a kind of communication network which is a whole digitial communication multi _ embranchment data bus between intelligential field device and auto _ system. control system based on pcs ( fieldbus control system ) is a new kind of system which connect field control unit, field monitor unit, operation unit, communication interface uint with databus. lt integrates computer technology, communication technology and process cnotrol technology to adjust to demand of high standard productive control and enterprise management. lt developments and follows the advantage of traditional instrument control system and computer central control system and make up for their disadvantage so that it is applied in different industrial cnotrol area

    現場總是連接智能現場設備和自動化系統的數字式、雙向傳輸、多分支的通信網路。它是一種能支持雙向、多節、總式的全數字通信網路。基於現場總技術的控制系統是一種新型的控制系統,它採用總方式將現場控制單元、現場監視單元、操作站、通信介面單元連接起來,綜合了算機技術、通信技術和過程式控制制技術,以適應現代高水平生產控制與企業管理的需要。
  3. First calculation method : doing horizontal projection drawing on drawing piece, k value is introduced by area equation of projection drawing, k value is obtained by area equation, along outline of projection drawing to add k value, that is, outline shape of blank drawing, principle area - equal and shape similar are used. second calculation method : along outline of drawing piece horizontal projection drawing, to do normal line of penetration line for wantonly point of this point, to obtain high of drawing piece on this point normal line, point and point is to form outline shape of blank

    算方法之一為k值法:作拉深件水平投影圖,在該投影圖面積方程中引入k值,利用面積相等原理解方程,求得k值,沿水平投影外沿加上k值,即為毛坯圖的外廓形狀。算方法之二為拉深法:沿拉深件水平投影圖外廓,在任意作該的法,在該法上以該拉深件的高度為量,在法上取截
  4. One ramification of our calculations is that radio pulsars are neutron stars in which the large - scale dynamo has failed to operate

    從我們的算中,還可以附帶得到一:無電波霎正是無法形成大尺度發電機的中子星。
  5. Through calculation and dynamic adjustment of the distribution factor for every power plant and tie line, more accurate load flow change can be obtained

    通過算並動態調整各個調節電廠和聯絡的調節分配因子,得到比單個鬆弛節算時更加實際的潮流變化。
  6. Firstly, the dissertation tells something about lonworks technology, the lontalk protocol, the peer - to - peer communicaton etc. secondly, it lucubrates s - 2000 control system based on lonworks, including the design method of the system, the key technology, the characteristic of the intelligent node, the i / o property, the structure of intelligent block, the neuron chip, the design of the data acquisition node and so on

    本文首先闡述了lonworks技術及其特,總系統所採用的lontalk協議, peer - to - peer對等通訊,基於lonworks總網路通訊協議系統等。然後對基於lonworks總的s - 2000控制系統進行深入研究,重研究系統的設方法和關鍵技術,智能節的特,輸入輸出特性及智能模塊分析, neuron晶元的分析研究,以及數據採集節的設,數據採集控制軟體,組態軟體的設原理等方面。
  7. This thesis primarily makes below the work of a few aspects : ( 1 ) the method that measuring and solution of the control point ' s coordinate, calculation of the point, solution of intersection with polygons, and calculation the quantity of ore reserves in a drawing file by computer technology ; ( 2 ) the theory and the method to draw the diagram of the equivalent line by establishing the abnormal triangle net, and ore blending with the diagram of the equivalent degree ' s line ; ( 3 ) the principle and method to automatically divide the ore, and the method to adjust to the quantity of ore and search the ore ' s information ; ( 4 ) adoption the line program to beg to solve the problem to ore blending, and establish the linear programming model and the simplification model with ore blending. ( 5 ) establish the control model with ore degree based on modem control theories

    本論文主要完成了以下幾方面的工作: ( 1 )利用算機技術直接在一張現狀圖中,實現了控制的測量與求解、坐標展算、多邊形求交以及爆堆礦巖量的算; ( 2 )提出了通過建立非規則三角網的方法來繪制等值圖的理論和實現方法,通過等品位圖指導配礦工作; ( 3 )提出了配礦塊段自動劃分的原理和方法,並在此基礎上實現礦塊礦量調整和礦塊信息查詢; ( 4 )採用性規劃的方法求解配礦問題,建立了配礦問題的性規劃模型和簡化模型; ( 5 )建立了基於現代控制理論的品位控制模型。
  8. First, proper initial conditions between ekv and target are the premise of hit - to - kill. capture region is described by equations of relative motion defined in modified polar coordinate while phasetrajectory graph is introduced. and the disturbance of initial condition biase is analyzed by cadet through statistical linearization of ekv dynamical model

    本文在修正極坐標系中建立攔截器和目標之間的相對運動方程,結合相平面軌跡圖,分析了大氣層外動能攔截器的攔截區;對大氣層外動能攔截器動力學模型進行統性化,採用協方差分析描述函數法,分析了初始狀態誤差對彈道的影響。
  9. The algorithm can be applied to connection routing in pcbs with various pad geometry and pad sizes, with different wire widths and variable distances between wires. the basic element in routing is the search line with a given destination. the main features of the router are the target orientation of the search lines, the routing efficiency is guaranteed by rationally designed data structures and by the ability of searching around obstacles, the small amount of working storage and the reasonably short routing time

    該布演算法適用於焊盤外形尺寸不一,寬及間距離可變的印刷電路板布,其基本要素是帶有預定終的探索,特探索具有目標針對性,設合理的數據結構及靈活的繞障探索方式可大大提高搜索效率,所需存儲量小,布速度快。
  10. Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders

    其次,根據懸索橋恆載設理想狀態建立了懸索橋施工算原理;以分段懸鏈索理論為基礎,推導了懸索的形變化剛度和懸索支的滑移剛度;介紹了懸索橋成橋設算、吊索無應力長度算、空纜形與預偏量算、絲股架設算、索夾安裝位置算和加勁梁吊裝算的具體方法、數值演算法及軟體sgkz2000的算模塊的實現。
  11. The 2 - point self - energy and 3 - point vertex correction in < j ) 3 theory are calculated in this rule, and the fluctuation - dissipation theorem for 3 - point nonlinear response function is verified

    運用這套新法則,我們分別算了兩自能和三頂角修正,並驗證了三性響應函數的漲落-耗散定理。
  12. Finite difference time - domain method is used to calculate the reflection for these probes and absorbing boundary condition is used to deal with the singularity in the axis of the coaxial - line in the simulation. by comparing the reflection of different probes, the best probe has been selected according to sensitive requirement. the influence of parameters : such as thickness of protective film, length of protruding inner conductor of the coaxial - line probe to the measurement has been studied

    通過時域有限差分法進行數值模擬分析,並採用吸收邊界處理同軸軸心奇異算出各種探頭測量相同溶液的反射系數,根據其測量的靈敏度,選出最優設;並通過分析所選探頭的各種設參數,如薄膜厚度、內導體伸出長度等的變化對測量結果的影響,找出該探頭各參數的最佳范圍,使其具有高度靈敏性,以適用於測量化學反應溶液的介電常數。
  13. The extension of alishan resorts hotel is a part of traveler - increasing plan in 2008 by forestry bureau, council of agriculture

    阿里山賓館改善擴建劃在於落實行政院農業委員會林務局執行挑戰2008國家發展重劃中觀光客倍增劃之阿里山旅遊的整體發展。
  14. Dissolved gas analysis ( dga ) is one of the mainly technology methods to diagnose the internal malfunction in transformer. by request of dl / t722 - 2000, < guide to the analysis and the diagnosis of gases dissolved in transformer oil >, the component of h _ 2, c _ 2h _ 2, c _ 2h _ 4, c _ 2h _ 6, ch _ 4, co and co _ 2 is used to judge and analyze the internal malfunction in transformer

    本系統首先接收氣相色譜儀發送的數據信息,並對這些數據進行處理與分析,算出譜圖數據的波峰高度、波峰面積、波峰起始、基等值,在此基礎上依據定量分析及故障診斷原理對變壓器進行診斷,得出結論。
  15. After the theory of the generalized point photogrammetry is introduced, its applications are presented, including computer of image parameter from vanishing point and modelling by single image, determination of image parameters by matching between vector and image, inspection of sheet - metal part and determination of plane pose by contour line matching

    論述了廣義攝影測量理論,介紹了其應用,包括由滅算影像參數及單像建模,由矢量與影像的匹配確定影像的參數,鈑金件的檢測與由輪廓匹配確定飛機的姿態等。
  16. Figure 8 : adding time to a single - tier schedule extends the conflict periods as illustrated by the dotted lines and enlarged yellow highlights

    圖8 :圖中用和用黃色放大的加亮條顯示了為擴大沖突周期的單層安排畫增加時間
  17. Abstract : a structure of power automation in beijing airport is introduced, and the function design of every main module is proposed. an idea to develop this system is presented based on the developing platform, some essentials to communicate are explained by means of point - to - multipoint wireless increasing frequency and to synthesize computer voice

    文摘:系統介紹了首都機場供電自動化控制系統的結構,概要地說明了系統內各主要模塊的功能設,闡述了基於開發平臺研製該系統的思想,具體介紹了對多擴頻通訊以及電腦語音自動合成的部分實現要
  18. In two - view case, a method is presented for calculation 2d projective transformation and construction the virtual elements by combination of spatial points and lines. so more 3d invariants of object ' s spatial structures can be extracted from real elements and virtual eleme nts. ( 3 ) the geometric characteristics of 2d symmetric objects " in perspective images are lucubrated

    ( 2 )擴展了2d射影變換矩陣的求解方法,將單純利用集對應的算模式擴展到利用直集、組合等多種類型來建立兩個射影平面的對應關系;總結了平面上基於、直元素可求解的多種3d不變量;提出了雙視圖下由、直元素的多種對應關系求解2d射影變換來構造「虛元素」的方法,結合「實元素」和「虛元素」可以提取更多的空間3d不變量。
  19. Abstract : the curve equation, force calculation and the length of suspension in two conditions of suspended cable are given through the strict derivation using mathematical and mechanical method. the two conditions were the weight of suspension uniformly disturbed along the link and suspension line. the applications are given and the common expressions have some applied value in engineering

    文摘:通過數學、力學推導,給出了懸索自重沿弦(懸掛)及沿索均勻分佈兩種情況下的懸索曲方程、受力算及索長度,並給出了工程應用實例,所得結論和公式具有一定的工程應用價值
  20. This paper mainly studied the influence of asynchronous problem on statistical line losses between power supply and consumption, provided three solving methods, proportional coefficient method of power supply, curvilinear imitation method of power consumption and curvilinear interposition method of power consumption, and got the real synchronous loss rates of distribution network for the first time

    本文重研究了供售電不同期問題對統損的影響,提出了供電比例系數法、售電曲擬合法、售電曲插值法三種解決辦法,第一次得到了較真實意義上的同期統損率。
分享友人