BF 中文意思是什麼

BF 解釋
1. boldface 【印刷】黑體,粗體。
2. board foot 板英尺。

  1. Af flange telescopic joint bf single flange telescopic joint

    Bf型單法蘭限位伸縮接頭
  2. Af flange telescopic joint bf single limited telescopic joint

    Bf型單法蘭限位伸縮接頭
  3. Haven ' t thought about it. . wait until i get a bf

    沒想過,等有了男朋友再考慮。
  4. Development and application of expert system for the bf

    高爐專家系統的開發及應用
  5. Review on the development of bf expert system in china

    我國高爐專家系統開發的現狀
  6. Preparation of cationic photoinitiator cp - fe - arene bf

    芳茂鐵四氟硼酸鹽的制備
  7. Sally first met her bf in a party

    莎莉第一次遇見她的男朋友是在一個聚會上。
  8. Bf : concrete is my specialty. can you dig it

    混凝土結構是我的專長,你懂嗎
  9. Study of silicon for quick analysis of bf iron

    高爐鐵水快速定硅傳感器的研究
  10. Bf single flange limited telescopic joint - changmao

    Bf型單法蘭限位伸縮接頭- changmao
  11. In recent years at iron - making plant of pangang, the coke ratio of pig iron has reduced evidently by insisting on “ burden preparation ” course, improving quality of sinter, raising wind temperature, increasing rich oxygen quantity and injecting abundant pulverized coal into bf. the solid fuel consumption of sinter has been decreased greatly through insisting on using high - quality calces, practising high feed sintering, actualizing many techniques in solving key problems. at the same time, the energy source base management has been strengthened, and energy - saving work has made great progress, profits generated by energy - saving have exceeded a hundred million yuan

    近年煉鐵廠通過堅持「精料」方針,改善燒結礦質量,提高風溫,增大富氧,實施大噴煤,使入爐焦比有明顯下降;燒結堅持用好生石灰,推行厚料層燒結,實施多項技術攻關,固體燃耗大幅度下降;同時加強能源基礎管理,節能工作取得長足進步,節能創效益1億元以上。
  12. Specifically for the iron and steel industry during the past 15 years, thermo electron has installed over 100 mass spectrometers for gas analysis applications involving the following plants : coke ovens, blast furnace ( bf ), direct reduction iron ( dri ), basic oxygen furnace ( bof ), electric arc furnace ( eaf ), argon oxygen decarburization ( aod ) furnace, vacuum oxygen decarburization vod furnace and ruhrstahl - hausen ( rh ) furnace

    尤其在過去15年的鋼鐵行業中,超過100臺過程質譜儀用於氣體分析,包含:焦爐,高爐,直接還原煉鐵爐,氧氣頂吹轉爐,電弧爐,氬氧脫碳轉爐,真空氧氣脫碳爐和循環法真空脫碳爐。
  13. Maintenance of hot blast short pipe of maanshan steel ' s 2500 m3 bf

    3高爐熱風短管功能恢復
  14. A new technology for improving hot blast temperature and decreasing fuel consumption with high emissivity coating on the regenerator of blast furnace ( bf ) hot stove were introduced

    摘要介紹一種可以進一步提高熱風爐熱風溫度,降低燃料消耗的新技術。
  15. Second, in order to come off rapid - response design, as essential requirement of nc design, unit structures ( us ) and basic frames ( bf ), which have independent functions, are separated from main components of nc machine tools

    2 .快速設計是目前對數控機床設計主要要求之一。根據數控機床模塊內部結構的相似性,可以從機床基礎大件中分離出功能和結構相對獨立的元結構和框架尺寸。
  16. The article deals with the main improvements in relining design of no. 1 bf at baosteel. these measurements include : bf lining, cooling structure, cooling water system, monitoring of bf lining and auxiliary equipment for increasing campaign from 8 years up to 12 years, even 15 years

    介紹了寶鋼1號高爐改造性大修設計的主要內容,著重論述了高爐一代爐役設計壽命由8年提高到12年並爭取達到15年時在爐體各部位結構設計中,如爐體耐材砌築、冷卻結構、冷卻水系統、爐體檢測及爐體輔助設備等方面採取的一些改進措施。
  17. The bf portion ends up being about 12 % of the final blend and adds a nice toasty mocha character

    之後在方斯華兄弟法國橡木桶熟成19個月, 2 / 3為新桶。
  18. I just can ' t think what i will do whiteout my bf / gf

    無法想像沒有男、女朋友我能做什麼。
  19. Design and production practice of hot air stove of no. 1 bf in panzhihua iron and steel co

    攀鋼1號高爐熱風爐的設計及生產實踐
  20. Based on the ls alg orithm, the mobile packet routing is implemented using the propagation mode of d bf algorithm and the global routing topology table ( rtt )

    基於鏈路-狀態演算法,採用距離-矢量演算法的傳播方法和全局的路由拓撲表,實現了移動分組無線網的抗毀式路由協議。
分享友人