actual discharge 中文意思是什麼

actual discharge 解釋
實際流量
  • actual : adj 現實的,實際的,真實的,現行的,現在的。 in actual existence 現存。 in actual life 在現實生活...
  • discharge : vt 1 發射(炮等),打(槍),射(箭)。2 起,卸(貨)。3 排泄,排出,放出(水等)。4 釋放;解除,...
  1. In an actual case of the numerical modeling on the flood of both the north branch and the mid - downstream of daqing river in haihe river hasin, the flood is simulated with one - dimensional model, in which flood regulation of the retarding basin, the discharge gate control and the infiltrations of the northern rivers are considered

    在海河流域大清河北支及中下遊河道洪水數值模擬的實際工作中,應用了一維河網模型進行洪水的模擬計算,並根據實際情況加入了蓄滯洪區調度、泄洪閘控制調度以及近年來北方河道入滲的特點等條件,計算效果良好。
  2. In this paper, we study the most serious damming section of the east - one main canal, which is from the entrance of the hao wan flume ( chainage12 + 123. 6 ) to the exit of shang tian yuan tunnel ( chainage24 + 091. 1 ). the main content is analyzing the flow characteristic of the canal, setting up mathematical model of the discharge condition of the east - one main canal, according to the survey section and actual roughness factors, building, bend and so on, we divided the canal into more than loocaculation segments. each segment is calculated by microsoft excel electrical table through computer as permanent transition flow of non - prismatic channel

    本論文研究的渠段為陸渾灌區東一乾渠壅水最為嚴重的渠段,從郝灣渡槽進口(樁號12 + 123 . 6 )至上天院隧洞出口(樁號24 + 091 . 1 ) ,其主要內容是,分析渠道水流特徵,建立東一乾渠輸水狀況的數學模型,根據測量斷面及實際糙率、建築物、彎道等因素的不同,將渠道劃分成120多個計算段,每段按非稜柱體恆定漸變流,運用microsoftexcel電子表格進行編程計算。
  3. The objective of the optimal model is to keep the flood process mode similar and subject to restrictions of the actual peak flow discharge and flood volume in different period of time, the ga and prsaa that have global optimal capabilities are used to solve the model in this paper

    在滿足洪峰流量約束和分時段洪量約束條件下,本文建立了以洪水過程模式盡量相似為目標的洪水過程放大優化模型,並採用具有全局搜索能力的遺傳演算法和并行組合模擬退火演算法求解該模型。
  4. From the case study, it can be seen that the results of two algorithms can satisfy the restrictions of the actual peak flood discharge and flood volume and keep the mode of the typical flood effectively and avoid the manual randomicity

    通過實例計算可以看出,這兩種演算法計算結果均能較好的滿足洪峰洪量約束要求,並有效保持了典型洪水的模式,避免了人工修勻的任意性。
  5. Right of waste should be understood as that polluters should emit legally in the governmental allocating arrange and without damaging the benefits of others. the actual aim of the discharge is that only by meeting the needs of the local environment, could the trade carry on

    排污權應界定為排放者在環境監督管理部門分配的額度內,並在確保該權利行使不會損害其他公眾環境權益的前提下,依法享有的向環境排放污染物的權利。
  6. In order to describe the actual working processes of dielectric barrier discharge ( dbd ) circuit, an analysis model of differential - difference equations was presented, based on the working modes of full bridge serial load resonant dbd circuit, which was adopted with phase shifting control

    摘要為描述介質阻擋放電型臭氧發生器電路的實際工作過程,在分析一種移相全橋脈寬調制下串聯負載諧振電源供電的臭氧發生器電路的基礎上,提出了採用微分差分方程來描述電路的工作過程,並給出了電路可能的工作軌跡。
  7. For example, when the design flow of upward of the peace bridge of upward of the east - one main canal is 45m3 / s, the actual flow quantity is 23. 8m3 / s on the 30th of september in 1989, the water level of the transition region terminal of the mouth of hao wan flume of the east - one main canal had gained the design level of 4. 3m, and the level between downstream and shang tian yuan tunnel was generally higher. it says that the actual discharge capacity now is only about 24m3 / s which is half of the design value. this not only make the benefit of the irrigation district abnormal, but also greatly hinder the economic development of the irrigation district, and lead to the canal run frequently at small flow, high water level, lengthen the discharge duration

    如東一乾渠上段太平橋以上設計流量45m ~ 3 s , 1989年9月30日實測通水流量23 . 8m ~ 3 s時,東一乾渠郝灣渡槽出口漸變段末端水位已達到設計水位4 . 3m ,其下游至上天院隧洞水位也普遍偏高,即東一乾渠上段目前僅能通過流量24m ~ 3 s左右,只有設計值的50左右,不僅使灌區效益得不到正常發揮,嚴重阻礙了灌區范圍內的經濟發展,而且使渠道經常處于小流量、高水位運行,延長了次通水時間,大大增加了渠道工程的安全管理難度。
  8. The contribution to a general average shall be made upon the actual net values of the property at the termination of the adventure except that the value of cargo shall be the value at the time of discharge, ascertained from the commercial invoice rendered to the receiver or if there is no such invoice from the shipped value

    共同海損的分攤,應以航程終止時財產的實際凈值為基礎,但貨物應以卸貨時的價值為基礎,此項價值應根據送交收貨人的商業發票確定;如果沒有此項發票,則應根據裝運價值確定。
  9. Since the analysis of the inverter and its control system is very complex, the frequency analysis, time domain analysis and control system is made in capacitance operated conditions limited to pressure of time and paper length. the research content can be summed up as follows : ( 1 ) a new equivalent circuit of dbd circuit ( dielectric barrier discharge ) that consider the consume of transformer, the on - off switching loses and so on is presented based on the ozonier powered by sine current source. as compared with the former equivalent, the new equivalent circuit can be depicted the actual ozone circuit accurately

    本文主要針對容性狀態下的臭氧發生器電源進行相關研究,研究內容包括以下幾部分: ( 1 )在正弦電流源供電的dbd型發生器的基波等效電路基礎上,提出了一種考慮電路雜散損耗(變壓器勵磁損耗、開關管開關和導通損耗以及其他元件的熱損耗)的改進型基波等效電路,並採用該等效電路得出了適用的臭氧發生器電源設計方法,實驗驗證了該基波等效電路具有工程設計精度高的優點。
  10. The difficulties of interpretation since the significance of any event followed its occurrence as variably as the acoustic report followed the electrical discharge and of counterestimating against an actual loss by failure to interpret the total sum of possible losses proceeding originally from a successful interpretation

    事件發生后,它所帶來的結局各有不同,正如放電后傳來的音響那樣難以解釋。即使原來做的是獲勝的解釋,由於對萬一輸了時的損失總額不能正確地加以估價,究竟對現實的損害可能有多大,心中是沒有譜兒的。
  11. Water delivery has been run over 30 years. the main canal has the problem that the actual conveying capacity is very low now and the conveying capacity of the east - one main canal i only half of the design value, this lead to guaranteed real - time efficiency of the irrigation of the farmland recede greatly. the downstream has no water and crops were drought to death have been seen more times in the irrigation period, this lead to the contradictory between the upstream and downstream on water usage, moreover, the lower discharge capacity of the dry canal in irrigation period is the main cause of the actual irrigated area is only half of the design value

    經過三十年的輸水運行,目前乾渠工程存在嚴重的輸水能力低問題,其中東一乾渠輸水能力只能達到原設計的1 2 ,使農田的適時灌溉保證率大大降低,多次發生灌溉期下游見不到水而旱死莊稼的情況,造成上下游用水矛盾突出,而且灌溉期乾渠過流能力偏小,是導致實際灌溉面積僅為設計值的1 3的重要原因。
  12. For multistage style, its suction nozzle and discharge nozzle can be installed to the same direction, or to different directions by 90, 180 and 270 according to actual needs, thus to meet different connection conditions

    多級式可根據需要,吸入口和吐出口可安裝成同方向或90 、 180 、 270幾個不同方向以滿足不同的連接場合。
  13. Actual discharge coefficient

    實際流量系數
  14. In the circumstances envisaged in the third paragraph of rule g, the cargo and other property shall contribute on the basis of its value upon delivery at original destination unless sold or otherwise disposed of short of that destination, and the ship shall contribute upon its actual net value at the time of completion of discharge of cargo

    在規則g第三款所述的情況下,貨物和其他財產,除非在運達目的地以前售出或另作處理,應以其在原目的地交貨時的價值為基礎參加分攤;船舶則應以其在卸貨完畢時的實際凈值參加分攤。
分享友人