adjacent site 中文意思是什麼

adjacent site 解釋
相鄰地盤
  • adjacent : adj. 1. 毗鄰的,鄰近的。2. (時間上)緊接著的。
  • site : n 1 地點;位置;地基。2 場所,現場。3 遺址。4 【計算機】網站,站點〈電腦網路用戶的網站地址〉;萬...
  1. This mature date palm ( phoenix dactylifera ) has been transplanted successfully to an adjacent site to permit road widening near yuen long

    為遷就位於元朗附近的路面擴闊工程,這棵成年的海棗樹( phoenixdactylifera )成功地移植到鄰近的地點。
  2. The site was enlarged to include the adjacent former new astor hotel site and rezoned to " comprehensive development area 1 " on the draft tsim sha tsui ozp gazetted on october 17, 2003. revised master layout plan approved with conditions by the ctpur under the delegated authority of the tpb on june 23, 2004. construction in progress

    有關地盤的范圍被擴大,以便把毗鄰的前新雅圖酒店所在地(載於二零零三年十月十七日刊憲的尖沙咀分區計劃大綱草圖)包括在內;該范圍在該草圖上,亦已改劃為綜合發展區( 1 )地帶。
  3. The diffusion mechanism wherein net atomic migration is from lattice site to an adjacent vacancy

    一種擴散機制,這時候原子的凈遷移過程是從晶格結點位置移動到鄰近的空位中。
  4. The proposed lok ma chau station area would cause a direct net loss of fishpond area of 9. 5 ha within the wetland conservation area adjacent to the mai po and inner deep bay wetland of international importance ramsar site and is ecologically unacceptable at both local and international levels

    擬建的落馬洲總站將造成米埔及后海灣內灣拉姆薩爾國際重要濕地旁濕地保育區內9 . 5公頃的魚塘凈減少,于本地和國際層面均為不可接受的生態損害。
  5. The spur line project would cause a direct net loss of 9. 5 ha of wetlands at lok ma chau within the wetland conservation area adjacent to the mai po and inner deep bay wetland of international importance ramsar site and is ecologically unacceptable at both local and international levels. it would also set a very bad precedent for the conservation of the deep bay wetlands and would have implications for future developments within wca

    支線工程將對落馬洲濕地保育區造成9 . 5公頃漁塘凈減少,其位置毗鄰米埔及后海灣內灣拉姆薩爾國際重要濕地,于本地和國際層面均為不可接受的生態損失,亦會對后海灣濕地的存護和濕地保育區的未來發展,立下極不良的先例。
  6. ( 3 ) pah " levels in maricultural site tvere much higher than that in the adjacent non - maricultural site, and it showed that mariculture was one of the contributors of marine pah " pollution in seal atef. 2 western xiamen harbort ( 1 ) pah " levels in surface seat " ater and sediment of the survey site " ere quite severe

    5系統研究了鱸魚、真鯛體內不同器官、組織的生化指標? ?過氧化氫酶( cat ) 、超氧化物歧化酶( sod ) 、脂質過氧化( lpo )指標,結合水體及生物樣的pah污染分析結果,探討了這些指標對水環境pah污染的指示作用。
  7. Indoor and outdoor sports facilities include squash court, table tennis room, basketball shooting court, fitness room, dance room, tennis courts, and an outdoor basketball volleyball court. adjacent to student hostel ii is the herbsnsenses chinese medicinal plants garden and a bbq site

    室內及室外運動設施有壁球場、乒乓球室、籃球練習場、健身室、舞蹈室及室外籃球、排球場。第二學生宿舍側鄰建有草苓香中草藥園及燒烤場。
  8. The site, which is adjacent to the shanghai new international expo centre, is expected to offer an aboveground buildable gfa of 2, 476, 000 square feet, comprising hotel, offices, serviced suites serviced apartments, commercial properties and related ancillary facilities

    該項目毗鄰上海新國際博覽中心,預計可提供2 , 476 , 000平方尺之地面可建築總樓面面積整個項目包括酒店辦公室服務式套房服務式公寓商用物業及其他相關設施。
  9. Early on the opening day, a huge crowd of visitors rushed in to appreciate master s works of art and to ask for sample booklets. master s lecture videos were shown in the main hall while doctors of western and chinese medicine offered free consultations in an office adjacent to the exhibition site

    活動正式展開了,當天一早便湧入許多民眾前來觀賞藝術作品和索閱經書,現場大廳並播放師父錄影帶,在展覽會隔壁且有免費的中西醫義診活動。
  10. The campus is conveniently located on a site adjacent to heng fa chuen on hong kong island. it is well served by public transport and is within walking distance of the heng fa chuen mtr station

    分校座落於港島鯉魚門灣,鄰近杏花,公共交通設施完善,步行往返校園與杏花地鐵站亦十分方便。
  11. Construction of the north - eastern riverwall and site formation work adjacent to lung tin estate in tai o were substantially completed in july

    大澳龍田?毗鄰的東北河堤建造工程及地盤平整工程,已於二零零二年七月大致完成。
  12. Reclamation, road and drainage works at yung shue wan on lamma island are also in progress. construction of the north - eastern riverwall and site formation work adjacent to lung tin estate in tai o is scheduled for completion in early 2002

    南丫島榕樹灣的填海、道路及渠務工程也在進行。大澳龍田?毗鄰的東北河堤建造工程及地盤平整工程,預定在二零零二年年初完成。
  13. The works include the complete civil, structural, geotechnical, architectural, mechanical, electrical, and environmental work incorporating the detailed design, construction, and start - up including site work, demolition, underpinning and other protection work for adjacent structures, all necessary temporary traffic diversions, and utilities diversions, restoration and reconstruction work

    工程包括全面的土木、結構、土力、建築、機械、電力及環境工程,結合詳盡的設計、建造及動工,包括工地工程、拆卸以及毗鄰構築物的支承結構及其他保護工程,所有必要的臨時交通改道、公用設施轉駁、修復及重建工程。
  14. The railway tunnels along canton road and underneath the former marine police headquarters will be constructed by the bored tunnelling method to minimize impacts on the adjacent environment. other than the excavation works that need to be carried out within the works site near the canton road government offices for the new station and introducing the tunnel boring machine, the works that need to be carried out at the street level along canton road will be small in scale so as to minimize the impact on the environment in the neighbourhood

    在廣東道沿路和前水警總部地底的鐵路隧道,會以鉆挖隧道方式建造,除了在廣東道政府合署現址附近的工地內挖開地面以便興建新車站及引進隧道鉆挖機外,需要在廣東道路面進行的工程規模會很少,以便盡量減少對毗鄰環境的影響。
  15. Developments which would likely involve felling andor transplantation of extensive or valuable trees within or adjacent to the application site

    可能需要在申請地點內或附近廣泛砍伐及或移植樹木,或砍伐及或移植珍貴樹木的發展。
  16. It is adjacent to the border of india ' s sundarbans world heritage site inscribed in 1987

    它毗鄰1987年確定的印度三達班世界遺產遺址。
  17. The approximately 807, 000 square - feet grade - a office complex project in futian central district is under construction with completion currently scheduled for the fourth quarter of 2007. in may 2006, the group acquired another site adjacent to this project, which is planned for an approximately 850, 000 square - feet office property development

    於二零零六年五月,本集團于福田中心區購入另一幅毗鄰上述項目之地塊,計劃發展總樓面面積約850 , 000平方尺的辦公室物業。
  18. Given that the black point reclamation is small, and could probably be reduced, wwf questions whether the completion time for building the lng terminal adjacent to the black point gas - fired power station would really be significantly slower than building the terminal at a remote island site with no road access, in addition to a 38 km pipeline

    鑒于鼓灘的填海范圍細小,而且更有縮減的空間,本會質疑在現有的天然氣發電廠旁興建天然氣接收站的工程,是否真的會比在無路可達的荒島上進行同樣工程,兼另建一條38公里長的輸氣管緩慢得多。
  19. The government has commissioned a consultancy study since 2004 to conduct a planning review for the ex - kai tak airport site and the adjacent existing waterfront areas, and to consult the public for formulating a new development plan for kai tak

    近年政府就啟德機場舊址以及鄰接地區之現有海旁地帶,聘請規劃顧問進行規劃檢討研究,並向公眾諮詢,以重新制定啟德發展概念規劃。
  20. It assessed the development potential of the old airport site at kai tak, adjacent old urban districts and a possible reclamation in kowloon bay

    研究評估?德機場現址及鄰近舊區的發展潛力,以及在九龍灣填海的可行性。
分享友人