allowable cost 中文意思是什麼

allowable cost 解釋
可允成本
  • allowable : adj. 可容許的,可承認的,不礙事的,正當的。 Two mistakes are allowable in this game. 這種游戲允許犯規兩次。adv. -bly
  • cost : n 1 費用;代價,價格;成本。2 犧牲;損害,損失。3 〈pl 〉訟費。vt (cost; cost)1 值,要價(苦幹...
  1. The cost for the deposition of the waste depends also upon the volume of the storage cavities and the maximum allowable radioactive concentration of the waste.

    廢料處理費用還取決于貯存空穴的容積和允許的廢料最大放射性濃度。
  2. No deductions " new for old " shall be made from the cost of temporary repairs allowable as general average

    可作為共同海損的臨時修理費用,不應作「以新換舊」的扣減。
  3. First, suppose a source point and a sink point. second, draw a unilateral line from source point to every substation node. the line ' s capacity is set as corresponding substation ' s allowable load value and the line cost is set as the substation ' s unit load cost

    本文通過線性化處理后將網架優化模型描述為一個最小費用最大流問題,虛擬一個源點和一個匯點,從源點到各變電站節點各引一條單向弧,弧容量為變電站允許的負荷值,弧費用為變電站單位負荷的費用。
  4. In recent years, due to continuous improvement of cmos technology and the need for low cost, the maximal allowable supply voltage has been scaled down gradually in the analog and digital integrated circuits. because it can produce variously stable output voltage, regulators have been used in analog circuits widely

    近幾年來,由於工藝水平的提高以及出於降低生產成本的考慮,模擬與數字集成電路的所允許的最大工作電壓將逐漸降低,電壓調節器由於能夠根據需要產生穩定的電壓,已經在模擬與數字集成電路中得到了廣泛的應用。
  5. To support cache item view, the policy uses incremental view maintenance. because of the high cost of maintaining cache coherency and the resource - poor characteristic of mobile environments, the thesis also discusses cache weak coherency. several ways to specify allowable divergence are given

    當客戶要求偏差嚴格限制在一定范圍時,給出客戶給定可容忍偏差限定條件的方法;當客戶非嚴格要求偏差范圍時,給出基於有效期的緩存弱一致性維護策略國防科學技術大學研究生院學位論文ccptv 。
  6. Based on internal rate of return as dynamic index of financial evaluation, the authors quantitatively analyse the critical point of investment inflation for a project, which can be explained as follows. assuming that the project is in a definite time limit during which the internal rate of retum should not be less than minimun attractive rate of return ( marr ), an analysis is made on the critical value of allowable maximum inflation of investment cost. similarly, assuming that the project is in a definite investment, an analysis is made on the critical point of allowable maximum delay of time limit for the project. by critical analysis of inflation of investment and delay of time limit for a project, an investigation can be made on the capacity for a project to bear the risk of investment inflation and time limit delay ; and then a scientific basis can be offered for arranging invesetment and drawing up schedule of construetion

    根據建設項目財務評價的動態評價指標? ?內部收益率,定量地分析建設項目的投資膨脹臨界點.假設在工期一定情況下,研究分析項目的內部收益率應該至少等於國家規定的行業基準收益率時,其允許投資費用的最大膨脹臨界值.類似於投資膨脹臨界分析,假設在項目投資一定情況下,得到允許建設工期的最大膨脹臨界點.通過投資與工期膨脹臨界分析,可以考察投資項目承受投資增加和工期拖延的風險能力,為合理安排投資和編制施工進度提供科學依據
  7. For instance, the government policies ( such as importing foreign labor, fuel subsidy, intensity of resource conservation, etc ) and the demand and supply of market will no doubt affect the cost - return structure, in turn, which will force the total allowable catch and the number of allowable vessels to be adjusted

    例如:政府政策(外勞引進、燃油津貼、資源保育力度…等)和市場供需,都會影響該漁業之成本和利潤,進而調整最大可捕量和作業漁船數。
分享友人