aqueduct bridge 中文意思是什麼

aqueduct bridge 解釋
高架渠
  • aqueduct : n. 1. 渠道;渡槽,導水管。2. 【解剖學】導管。
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  1. Design of inclined cable for aqueduct cable stayed bridge

    渡水管斜拉橋索的設計
  2. The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )

    海南海峰公司承建大的工程項目:華北油田水電廠原油發電站工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水庫斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉站;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山電力股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。
  3. From roundwood reservoir in county wicklow of a cubic capacity of 2, 400 million gallons, percolating through a subterranean aqueduct of filter mains of single and double pipeage constructed at an initial plant cost of 5 per linear yard by way of the dargle, rathdown, glen of the downs and callowhill to the 26 acre reservoir at stillorgan, a distance of 22 statute miles, and thence, through a system of relieving tanks, by a gradient of 250 feet to the city boundary at eustace bridge, upper leeson street, though from prolonged summer drouth and daily supply of 12 1 2 million gallons the water had fallen below the sill of the overflow weir for which reason the borough surveyor and waterworks engineer, mr spencer harty, c. e., on the instructions of the waterworks committee, had prohibited the use of municipal water for purposes other than those of consumption envisaging the possibility of recourse being had to the importable water of the grand and royal canals as in 1893 particularly as the south dublin guardians, notwithstanding their ration of 15 gallons per day per pauper supplied through a 6 inch meter, had been convicted of a wastage of 20, 000 gallons per night by a reading of their meter on the affirmation of the law agent of the corporation, mr ignatius rice, solicitor, thereby acting to the detriment of another section of the public, selfsupporting taxpayers, solvent, sound

    但是由於夏季久旱,再加上每天供水一千二百五十萬加侖,水位已降到低於排水口。都市監察官兼水道局技官土木工程師斯潘塞哈蒂奉水道局的指示鑒于有可能會像一八九三年那樣被迫利用大運河和皇家運河那不宜飲用的水,除了飲用外,下令一律禁止使用市裡供應的自來水。尤其是南都柏林濟貧院,盡管限定用六英寸的計量器,每個貧民每日配給十五加侖水,然而在市政府法律顧問辯護律師伊格內修斯賴斯的監督下,經查表證實,每夜要浪費兩萬加侖水,從而使院外的社會各階層也就是自費並有支付能力的納稅者們蒙受損害。
  4. As a brand new supporting structure, the steeve - arch was firstly used in the design of tangyu aqueduct ( also used as a bridge ) lies on the eastern main ditch of shitou river, shaanxi province

    吊桿式拱架作為一種新型拱式支承結構在陜西省石頭河東乾渠湯峪渡槽(橋渡結合工程)設計中首創應用。
  5. It also has important reference value for the similar construction. by the safety and seismic evaluation of this aqueduct bridge, it has shown that ( 1 ) besides the structure of this aqueduct bridge was basically unharmed without some flake of concrete cover and revealing stirrup, its intensity basically reached the need of primary design. ( 2 ) from the side of carrying capacity, rib arch could satisfy the needs under the action of wind and earthquake, but some individual frame crossbeams and most rib arch tie beams could n ' t satisfy the need

    通過對東滑峪渡槽進行安全性能和抗震性能評估后表明: ( 1 )渡槽除肋拱頂面有保護層剝落、箍筋外露,結構基本完好,其強度基本達到西安理工大學工程碩士專業學位論文原設計的強度要求; ( 2 )從承載力方面看,在風荷載、地震作用下,肋拱基本滿足要求,個別排架橫梁不滿足要求,肋拱連系梁普遍不滿足要求;計入水平橫槽向地震作用的工況為設計控制工況。
  6. The donghuayu aqueduct bridge located in meixian county in shaanxi province was first built in 1980 ' s

    位於陜西眉縣境內石頭河水庫東乾渠上的東滑峪渡漕,始建於上世紀80年代。
  7. For the safety evaluation of donghuayu aqueduct bridge, the main problem is that no seismic design code is valuable

    對于東滑峪渡槽的安全性能評估,存在的主要問題是渡槽的抗震設計無本行業的相關規范可循。
  8. The seism response analysis of aqueduct bridge is analyzed with modal superposition method based on response spectrum which participant mode of vibration chooses the former 1 0 steps and combinatorial method was srss

    渡槽的地震反應分析採用振型分解反應譜法,參與振型取前10階,組合方法用srss法,求得結構的地震作用效應。
  9. This paper has benefited in from close trade ' s experiences and combined with the trait of this aqueduct bridge to bring forward the method of classification evaluation, which was successfully used in the evaluation of this aqueduct bridge

    本文借鑒相近行業經驗,結合渡槽特點,提出了分級評估的方法。並成功地運用於該渡槽的評估。對同類型的工程進行評估,有著重要的參考價值。
  10. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經試驗確定,為碧流河水庫增建旁通管設計提供依據。
  11. At present, whereas so many reasons such as its using function changing from irrigation to city water supply, the increasing of importance, the original design standard on the low side, the damage and aging of structure, the demand for seismic fortify in strong earthquake region and offering data of technical alteration for adding flux aftertime, it is important for safety and seismic capability of this aqueduct bridge

    目前,該渡槽使用功能由灌溉輸水改為城市供水、實際重要性提高、鑒于原設計標準偏低、結構的病害和老化破損以及地處強震區對抗震設防的要求,為日後加大流量進行技術改造提供依據,因而急需對渡槽作較詳細的安全可靠性評估和抗震性能評估。本文針對該渡槽進行了原位現場檢測,並對其進行結構分析計算和結構的安全性能與抗震性能的評估等方面的工作。
  12. ( 4 ) while the using of the aqueduct bridge had needs to be adjusted, seismic reinforced measure should deal with servicing and alteration. ( 5 ) in the method of reinforcing, it should be mentioned that the reinforce part must combine with the former structure element to guarantee the associated force of the reinforce part when considering earthquake shock

    ( 4 )當渡槽的使用在近期需要調整時,抗震加固宜結合維修改造一併處理; ( 5 )加固方法應注意加固部分與原結構構件的牢固結合,保證在地震發生時加固部位的聯合受力。
分享友人