arc over voltage 中文意思是什麼

arc over voltage 解釋
電弧放電電壓
  • arc : A. R. C. = American Red Cross 美國紅十字會。n. 1. 弧;弓形,拱(洞)。2. 電弧,弧光。
  • over : adv 1 在上,在高處;從上向下;突出,倚靠;越過。 jump over 跳過。 climb over 爬過。2 在那邊,向那...
  • voltage : n. 【電學】電壓,電壓量,伏特數。 the working voltage (電氣的)耐壓限度。
  1. According to the quickly adjustable characteristic of the peterson coil grounding system, this dissertation proposes a new control strategy. when the system is in operation, the strategy can limit the series resonance over - voltage by using the off - resonance method. when fault occurs, the strategy can conveniently suppressing arc by rapidly adjusting the inductance value of the peterson coil to the point, which the resonance with grounding capacitance of the power network is occurred

    依據可控硅控制消弧線圈接地系統的快速可控性,一改傳統的電網正常運行時調節消弧線圈接近於全補償的預調諧方法,提出正常運行時採用脫諧方法抑制串聯諧振過電壓;故障時立即調節消弧線圈電感量達到與對地電容諧振,以利熄弧的新型調節原理和方法。
  2. The problem about neutral - point - grounding mode is an all - around technical problem which associated with not only power system reliability , insulation coordination , electromagnetic interference , but assault safety 。 in china , the neutral grounding modes of the 10kv net involved of none grounding, grounding by arc suppressing coils, resistance grounding or reactance grounding in the past 。 with the development of civic power network , low resistance grounding mode was used to restrain the over voltage, particularly in guangzhou, shanghai , beijing , and zhuhai etc. it was reported that the over - voltage level of low resistance grounding mode is lower than that of arc suppressing coil mode, but the operation carried out the other way 。 at substations in guangzhou and shanghai it was found that the low resistance grounding mode is successful 。 but in some areas , such as zhuhai , substations grounding with low resistance revealed some problems , including power supply reliability rapidly dropping , transmitting line often tripping ; and person safety being threatened 。 so interiorly the grounding mode selection of the 10kv network was disputed, which mainly focused on the fault form of 10kv net grounding, the apply area of suppressing arcing coil grounding mode, power supply reliability level of the two modes, person safety, communication interfere and the workload of maintenance

    爭議點主要是在10kv電網接地故障的形式、消弧線圈接地的應用范圍、兩種運行方式供電可靠性的高低、人身安全、通訊干擾和運行維護工作量等諸多方面。 11 17本論文就是針對以電纜為主的城區10kv電網中性點接地方式的選擇問題進行研究。論文首先對10kv電網的中性點運行各種方式進行分析,比較各方式的特點,然後以重慶儲奇門變電站10kv電網的實際參數來建立數值計算模型,在考慮了電網接地電容電流變化、中性點電阻取值大小、接地點接地電阻值變化等多種影響因素的情況下,對中性點經消弧線圈接地和經小電阻接地方式下電網的過電壓水平和接地點短路電流大小進行了數值計算,其計算結果與電科院所作現場試驗進行了比較。
  3. After the neutral point is grounded through perterson coil, it can decrease the capacitor current through fault point and the over - voltage caused by the grounding fault, which is advantage for the extinguishments of electric arc

    中性點經消弧線圈接地后,有效減小了流過故障點的電容電流,減小了弧光接地過電壓,有利於電弧熄滅。
  4. After the neutral point is grounded through peterson coil, it can decrease the capacitor current through fault point and the over - voltage caused by the grounding fault, which is advantage for the extinguishments of electric arc

    中性點經消弧線圈接地后,有效地減小了流過故障點的電容電流,減小了弧光接地過電壓,有利於電弧熄滅。
  5. The fast development of power system has made it more and more imperative to measure transient parameters, such as over voltage test, trial engagement test of switches, reactors and transformers, harmonics elimination test of arc elimination coils and trial operation of high voltage transmission lines

    隨著電力系統的飛速發展,對于暫態參數的測量需求越來越迫切,例如:過電壓試驗;開關、電抗器、變壓器投切試驗、消弧線圈消諧試驗、高壓線路的試投等。
  6. Arc - over voltage

    弧絡電
分享友人