aseismatic test 中文意思是什麼

aseismatic test 解釋
抗震試驗
  • aseismatic : adj. 耐震的。
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  1. In this paper, the researching and developing situating at home and abroad on aseismic properties of the masonry structures are reviewed. aiming to the defects of the calculated formulas of the aseismatic shear strength of brick walls in the code for seismic design of building ( gb50011 - 2001 ) and the code for design of masonry structures ( gb50003 - 2001 ), through test on brick wall models between the single wall and the wall with flanges, restoring force characteristics, the behavior at failure of the brick masonry wall and the effect of longitudinal wall under cyclic horizontal loading were analyzed the aseismic capacity has increased by 31 % for wall with flanges, the rigidity and deformation of the wall has gone up greatly too. the conclusion that the effect of longitudinal wall should be comprised in the aseismatic formulas was proposed

    本文回顧了國內外關于砌體結構抗震性能的研究與發展現狀,針對建築抗震設計規范( gb50011 - 2001 )和砌體結構設計規范( gb50003 - 2001 )中墻體抗震驗算公式中的不足之處,通過單片墻和帶翼緣墻在垂直荷載和水平反復荷載作用下的對比試驗,研究了帶翼緣墻在水平反復荷載作用下的恢復力特性曲線、磚墻破壞特徵以及縱墻的影響等,翼緣墻的存在,主墻抗剪能力可以提高31 ,剛度及變形能力也均有較大提高的結論,墻體驗算公式中應當考慮縱橫墻共同作用的影響。
  2. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
分享友人