ash forming 中文意思是什麼

ash forming 解釋
成灰
  • ash : n 1 〈常 pl 〉 灰。2 〈pl 〉灰燼;廢墟。3 〈pl 〉骨灰,遺骨;〈詩〉遺骸。4 灰色,蒼白。5 碳酸鈉 ...
  • forming : device
  1. Abstract : 145 samples of eight plants were collected from lanmuchang and yangjiawan and quantitative analyses were made of the ore - forming elements in the plant ashes. considering the three principles of the plant indicator for mineral exploration, namely certainty, sensitivity and feasibility, this paper evaluates comprehensively the indicating functions of the eight plants, on the basis of some quantitative indexes such as the relation coefficient between plant ash and ore - forming element, concentration coefficient, etc. it also discusses the relationships between the anomaly of plant ashes and the fault zone, alteration zone mineralization zone and orebody, showing the significance of these plants to the prospecting

    文摘:在濫木廠和楊家灣鉈(汞)礦床(點)對芒箕、南燭、榔榆、大金發蘚、蜈蚣草、石松、黃花草、醉魚草等8種植物取樣145件,在提出確定找礦有效指示植物三原則(確定性,敏感性,可行性)的基礎上,依據植物灰分與底質成礦元素相關系數、植物灰分富集系數和襯度系數,較全面地分析和評價了8種植物的找礦功能;討論了其異常的分佈與斷裂帶、蝕變帶、礦化帶以及工業礦化(礦體)之間的關系,並指出了其找礦意義。
  2. Based on the studies, it is proved that lime fly - ash mixture is provided with more time to compact during construction compared with other base materials in forming even higher structure strength but not in reducing strength within 1 ~ 3 days period of time. meanwhile, structure strength of the mixture which has been destroyed by some reasons can be recovered in a great extent if original structure is regained. on the other hand, during the high temperature summer season or under other conditions promoting the mixture to form strength, continuous construction process between lime fly - ash base course and bituminous pavement can be carried out to complete the building process in short time

    確認二灰基層材料與其它類型的基層材料相比,在施工時具有較長的施工碾壓成型時間,在一定時間里延遲成型的二灰基層強度不僅不降低,反而還有一定程度的提高;與此同時早期受到破壞的二灰材料在恢復整體性的條件下,結構強度能夠在很大程度上得到再恢復;另一方面,在夏季高溫季節以及在強化基層強度形成的前提下,二灰類基層和瀝青面層可以採用連續施工的方式在較短的時間里完成路面鋪築工作。
  3. An experiment to evaluate the activity value of fly - ash used as a material for highway base course is also put forward, which can be adapted easily in highway engineering. based on field road investigation sa well as above results, all behaviors of low - activity fly - ash as highway semi - rigid base course material are tested, and the strength forming principles of lime - flyash mixtures are studied by means of dta, x - ray and sem analysis

    在此基礎上,通過大量室內試驗結合試驗路的研究,測定了低活性粉煤灰在半剛性基層中的各種路用性能;最後通過差熱分析、 x一射線衍射分析及電鏡微觀結構分析就二灰混合料的強度形成原理進行了論述。
  4. Ash forming impurities

    成灰雜質
  5. The influence of fineness of fly ash on film - forming of two - component polyurethane waterproof coating was studied

    摘要研究了粉煤灰填充雙組分聚氨酯防水塗料的效果。
  6. Ingredients of ash during the production of terephthalic acid are introduced, possible ash - forming mechanism is analyzed, affecting factors on ash - forming is reviewed, various measures for ash removal are commented

    摘要介紹了生產對苯二甲酸時產生的灰分的成分,分析了灰分形成的可能機理,敘述了灰分生成的影響因素,對除去灰分的5種措施作了評述。
  7. It is necessary to further study the mechanism for ash - forming so as to remove the ash effectively and improve the color and quality of terephthalic acid product

    認為需要進一步研究灰分形成的機理,以有效的除去灰分,改善對苯二甲酸產品的色澤和品質。
分享友人