assembly-line balancing 中文意思是什麼
assembly-line balancing
解釋
裝配線平衡-
The heuristics for the u - line assembly line balancing problem
型裝配線的啟發式平衡方法 -
Genetic - algorithms - based assembly line balancing
基於遺傳演算法的裝配線平衡 -
Study and development of assembly line balancing system
型裝配線的平衡 -
Ga - sa based mixed - model u - shaped assembly line balancing
基於分支定界方法的雙邊裝配線平衡 -
Method for engine assembly line balancing
裝配線平衡系統研究與開發 -
Combined u - shaped assembly line balancing
發動機裝配線平衡方法研究 -
Improvement of assembly line balancing
裝配生產線平衡的改善 -
Mixed - model assembly line balancing design
型裝配線平衡 -
Large - scale assembly line balancing optimization with complex task constraints
大規模帶復雜任務約束的裝配線平衡問題優化 -
Appication of genetic algorithm based on task sequences to assembly line balancing
用基於作業序列的遺傳演算法求解裝配線平衡問題 -
Sequencing for mixed - model assembly line with consideration of line balancing
考慮流水線平衡的混合裝配線排序 -
Research on balancing method of sewing assembly line
縫紉生產流水線平衡方法的研究 -
Study of balancing assembly line ' s cycle time in tmc corporation
公司平衡裝配線生產節拍研究 -
The methods for solving the problem of balancing an assembly line
裝配線平衡問題的求解方法淺析 -
Hybrid genetic algorithm for solving the problem of balancing an assembly line
求解裝配線平衡問題的混合遺傳演算法 -
Different from traditional problem of balancing one - side assembly line, for two - sided assembly line balancing problem, nut only the precedence constraints among tasks but also the operation directions of tasks and the requirement of parallel work should be taken into consideration
摘要與傳統的單邊裝配線平衡問題不同,雙邊裝配線平衡不僅要考慮任務優先順序關系,而且要考慮任務操作方位以及雙邊并行作業的要求。 -
Study on merger and balancing of working procedures in garment assembly line
服裝生產流水線工序合併與平衡的研究 -
Application of a genetic algorithm to the assembly line balancing problem of clothing production
遺傳演算法在服裝生產流水線平衡問題中的應用 -
The purpose of this course is to provide students with a resource which describes the techniques and procedures of motion and time study. it contains : techniques of methods study, work station design, pts, stop watch time study, standard data, assembly line balancing
探討工作研究涵蓋之各項技術:時間研究、動作研究、程序分析、作業分析、影片分析、工作抽查、標準工時與效率管理、動作經濟原理、生產線平衡、生產力衡量等。 -
To solve the balancing problem of type of two - sided assembly line effectively, the mathematical model was constructed and a heuristic balancing algorithm based on a group assignment procedure was proposed
為有效地解決雙邊裝配線第二類平衡問題,建立了數學模型,並提出一種基於歸組策略的啟發式平衡演算法。
分享友人