base of excavation 中文意思是什麼

base of excavation 解釋
開挖底面
  • base : n 1 基底,基,根基,底座;底層,底子;(紀念碑等的)基址;(山)麓。2 【軍事】基地,根據地。3 根...
  • of : OF =Old French 古法語。
  • excavation : n. 1. 開鑿;發掘;挖掘;挖土,剜通。2. 穴,洞;坑道,開鑿成的山路。3. 【考古】出土文物,發掘物。
  1. Due to exceedingly flat arched vault of the flat tunnel with outsized span and renewed stress allocation in surrounding rock after excavation, which would inevitably induce some excessively large load on the base of arch, therefore, larger load - bearing capability in the is " foundation is a must. on the other hand, smooth face explosion must be applied to excavation of the arch base to further ensure the integrity and continuity of country rock around tunnel

    特大跨超淺埋隧道拱部結構過于扁平,開挖后發生二次應力分佈,拱腳處的應力過大,要求有較大的地基承載力,拱腳開挖時必須採用光面爆破,保證圍巖的完整性和不受擾動,開挖后及時封閉,防止該處積水軟化圍巖。
  2. Remnants of the marble boat. after excavation and clearing. the boat - shaped base has been restored to its original form

    別有洞天「活畫舫」殘跡,其基座用青石雕砌成船舫樣式。現經挖掘整理,增砌石料舫面。
  3. Influence of seepage on heave of foundation pit base during excavation

    滲流作用對基坑坑底回彈變形的影響
  4. Through the analysis and calculation the conclusion can be made that during the process of the timbering of excavation, the magnitude of soil stress decreases with the increase of the displacement on the base of the still earth pressure, and the earth pressure distribution varies from the triangular distribution of the still earth pressure to other distribution with the displacement of the timbering structure. the thesis introduces the bedding coefficient in the horizontal direction varying with the soil displacement from soil - structure interaction mode, therefore calculation can be made to get more rational calculation result using elastic foundation finite element method which is the same to timbering structure both upwards and under excavation surface

    通過分析計算可以得出,在基坑支護過程中,土壓力的大小在靜止土壓力值的基礎上隨支護結構向坑內側位移增大而減小;土壓力的分佈由靜止土壓力的三角形分佈隨支護結構位移變化成其它分佈;由土-結構共同作用模式引入隨土體位移變化的水平向基床系數,使支護結構在開挖面以上部分同以下部分一樣,均可採用彈性地基有限元法進行計算,得出更為合理的計算結果。
  5. The results are important for dam base excavation and engineering disposal. ( 2 ) arch dam can be regarded as an elastic ground cantilever system composed of vertical cantilever, horizontal arch, and torsion structures. the dissertation takes the arch dam as load diversion system of arch - cantilevers system located on the ground composed of elastic cantilever

    ( 2 )將拱壩虛擬為由座落在壩基塊體有限元上的一系列懸臂梁與水平拱組成,將懸臂梁視作由水平拱所支承的彈性地基梁,考慮徑向和切向調整,比以往的彈性地基梁只考慮徑向調整有所發展;而且用塊體元模擬壩基,也能較精確地模擬壩基多種斷裂構造等對壩體結構行為的影響。
  6. Design and construction of in - hole base rock explosion for artificial excavation - hole pile engineering

    人工挖孔樁工程孔內基巖爆破設計和施工簡介
  7. The interior failure mechanism of rock strata developing from large - scale excavation and the rules of land surface deformation are analyzed on the base of careful investigation

    在詳細調查的基礎上簡要分析了地下大面積采空后巖土內部破壞機制和地面變形規律。
  8. After complete demolition, excavation and reconstruction, the huinan eastern shopping mall will have an underground parking lot with 120 parking places, a base which is six levels high, and a tower section on top of the base which is 23 levels high including a level for building equipment, for a total height of 29 stories

    規劃重建后的「精品商廈」為一幢主體高24層的塔樓帶六層裙房的高層建築, 1 - 6樓每層建面3000 , 8 - 24層,每層建面1500 。
分享友人