baseplate 中文意思是什麼

baseplate 解釋
底板
  1. From up to down, food firstly arrives at material output bar, then lays off from taper concave slope, finally, food gets into round basin on baseplate after mutual effect through arcual fillister

    食品從上而下先到達彈性導料條,再到錐形凹坡下料,最後通過弧形凹槽的相互作用,食品到達底盤上圓形食盆。
  2. Pet food passing hemicycle outlet just fills in round basin on baseplate, not slop over

    通過半圓形出料口所出來的寵物食品剛好填滿底盤上圓形食盆,精確控制絕不溢料。
  3. Multichannel recorders employ four head assemblies which are precisely positioned on a single baseplate to ensure alignment with the tape.

    多通道記錄儀中有四個磁頭組件,精確地安置在同一塊底板上,以保證與磁帶對準。
  4. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  5. Dentistry - casting and baseplate waxes

    牙科學.鑄型蠟和假牙托塑性材料
  6. Dentistry - casting and baseplate waxes iso 15854 : 2005 ; german version en iso 15854 : 2005

    牙科學.鑄型蠟和假牙托蠟
  7. With integrated baseplate

    用集成基板
  8. Holding tooth baseplate

    托牙基底板
  9. Dental baseplate wax

    牙科基板用蠟
  10. Baseplate phase control

    底板相位控制
  11. Centrifugal pumps - horizontal baseplate design

    離心泵.水平基板設計
  12. End - suction centrifugal pumps - baseplate and installation dimensions

    軸向吸入離心泵底座尺寸和安裝尺寸
  13. End - suction centrifugal pumps. baseplate and installation dimensions

    端部吸入離心泵.底盤及設備的尺寸
  14. Baseplate screws with rectangular head

    方頭的基板螺釘
  15. So we must improve the frequency of the electrical machinery baseplate to avoid the resonance phenomenon

    因此,必須改進電機底板的結構使其固有頻率避開運動部件的工作頻率。
  16. Owing to the operating principle of the ground system and different working position of every spare parts, the operating frequency of different parts in the system influent the shell of the decelerator, electrical machinery baseplate and supporting differently

    依據螺桿泵地面驅動系統的工作原理和各零部件的工作位置,系統內的運動部件的工作頻率對減速器殼體、電機底板和支架的影響程度不同。
  17. Iso 3661 : 1977 ; end - suction centrifugal pumps - baseplate and installation dimensions iso 3661 : 1977 ; german version en 23661 : 1993

    離心式末端吸入泵.基座和安裝尺寸
  18. It has been researched and widely used abroad, but is still new in our country, and the test method of bonded resilient baseplate has not been mature and standarized

    總結了壓縮型軌道減振器的各種性能的試驗方法,包括剛度和變形、垂向升舉、橫向約束、縱向約束、疲勞、低頻動剛度等試驗。
分享友人