beam anchor 中文意思是什麼

beam anchor 解釋
梁端錨固
  • beam : n 1 梁,棟梁,桁條;(船的)橫梁。2 船幅;(動物、人的)體幅。3 (秤)桿,杠桿,(織機的)卷軸,...
  • anchor : n 1 掛錨;錨狀物。2 樁,支架。3 〈比喻〉依靠。4 【體育】一隊運動員中最後參加比賽的人;殿後的人〈...
  1. Practices on bolt, mesh, anchor and beam support in coal drift under unstable roof condition of cataclastic rock mass

    不穩定頂板煤巷錨網索梁支護實踐
  2. It is the " prestress anchor ribbed beam support system " that gave a new practical support system to both of them

    預應力錨桿肋梁支護技術為這兩類基坑提供了一種實用的支護體系。
  3. " prestress anchor ribbed beam support system " is a new practical support technology which came from soil nailing walls system and un - embedded rank of piles with anchors support system that has been used successfully for 4 years by the author and his company named qingdao deep foundation stabilization engineering co., ltd. it " s mechanism is similar to rank of piles with anchors support system that can not be inserted into the bottom of foundation trench, but it " s ribbed beams are used to replace rank of piles made before excavation so the work cycle can be shortened and the support system cost can be reduced ; meanwhile this system maintains the soil nailing wall " s convenience of digging and supporting

    「預應力錨桿肋梁支護技術」是筆者及所在單位歷時四年在土釘墻和無嵌入多錨排樁兩種支護體系基礎上開發應用成功的一種新型實用性支護技術。其支護機理類似於未嵌入坑底的排樁多錨支護,只是由肋梁代替了開挖前施工的排樁從而提前工期並降低支護造價;同時繼承了土釘墻隨挖隨支護的機動靈活性。自1998年至今該技術已在青島、濟南、煙臺等十幾個深基坑和高邊坡工程中成功應用。
  4. The company the author worked in is applying a practical patent for the " prestress anchor ribbed beam support system ". so far this technology is still a technical and commercial secret. so there is a special announcement here, this thesis is only offered to professors for examination, so any copy and spread to the same project companies is not allowed, the author gave a gratefulness to the professors who hold this thesis here

    筆者所在公司正在就「預應力錨桿肋梁支護技術」申請國家級實用專利,該技術暫屬技術和商業機密,因此特別聲明:本文僅作為碩士論文供教授評審使川,論文不能翻印或傳至同行業其他單位中,筆者特向擁有本人論文的教授們表示感謝。
  5. We can say that it can develop the usage of soil nailing wall fill the rank of piles disadvantage a bright future of developing and using. the development, application, advantage and disadvantage about the " prestress anchor ribbed beam support system " is introduced in chapter 1 : it " s supporting mechanism and structural feature is introduced and compared with the soil nailing walls and un - embedded rank of piles in chapter 2 ; design and computer steps and more details about the design methods of the support system are introduced in chapter 3 ; the two important parts named draperies and anchors are introduced on their construction technology in chapter 4 ; three foundation trenches " instances with different depth in different soil are showed in the last chapter 5

    本文在第一章概論部分介紹了「預應力錨桿肋梁支護結構」的發展、應用和優缺點;第二章分析其支護機理、結構特點,並與土釘墻和無嵌入排樁多錨支護進行了結構受力對比分析;第三章介紹該支護結構的設計計算方法步驟,詳細介紹了支護結構各部分的設計方法;第四章介紹預應力錨桿肋梁支護系統最重要的兩個部分:帷幕和錨桿的施工技術;第五章介紹了不同土層不同深度的有代表性的三個基坑工程實例。
  6. Application of wire meshes beam and cable anchor in large fault roadway of composit roof

    錨梁網索支護在復合頂板大斷面煤巷中的應用
  7. Secondly, by making use of the features of lattice frame anchor structure which can protect slope and retain stability of landslide together with its small space between beams and light anchor, the calculation model and formulas of slope force are dealt with and the design process of lattice beam and pillar as well as anchor and plate are introduced carefully

    利用格構式錨桿框架結構所採用的小間距、小噸位錨桿及連續格構樑柱,從而使格構樑柱受力較均勻,適合鬆散堆積體滑坡治理的需要,即同時滿足深層抗滑和淺層護坡。
  8. Problems occured in the anchoring of overhung tourist hall on top of the tv tower and tower drum due to construction mistakes. it was introduced in this paper that two non - binding prestressed girder beams are respectively set in corresponding locations as the anchor beam of overhung radial support beam of tourist hall, thus the integrity of the tower drum and transmission of the load were guaranteed

    由於施工失誤,作為電視塔頂的外懸游覽廳和塔筒間的錨固發生了問題,本文介紹了採用在相應位置設置兩根無粘結預應力大樑分別作為游覽廳屋面和樓面徑向懸挑支承梁的錨固梁,確保了它和塔筒的整體性和荷載的傳遞。
  9. The pre - stressed anchor supporting structure with beam and column is analyzed theoretical in this paper, combined with theoretical study and design of such supporting structure, which is one of the plan projects of construction science and technology in hunan province. the topic provides engineering aiming with practical and concise computation method, and also provides the advice for structure with proper theory foundation and schemes to some extent

    本文結合湖南省建設科技計劃項目「永久性肋樑柱錨桿擋土墻設計關鍵問題及計算軟體開發」 ,對預應力肋樑柱錨桿支擋結構進行了理論分析,提供了適合於工程的、比較簡捷的實用計算方法,同時也為該類支擋結構設計提供一定的理論依據和設計建議。
  10. In the pre - stressed anchor supporting structure with beam and column, anchor, supporting structure and soil work jointly, therefore in this paper, rib - column and rib - beam are used models of elastic foundation beams, the solving method of rib - column and rib - beam are given out

    由於錨桿和支護結構以及周圍土體是共同工作、彼此協調的,因此肋柱、肋梁按彈性地基梁進行計算,並推導出計算公式。
  11. Besides experiments, the present domestic and abroad study on anti - slide pile is mainly analysis by traditional cantilever beam method, foundation coefficient method and elastic mechanic method. on the basis of previous studies, this paper carries out a research on relevant design and calculation theory about anti - slide piles, comprising the interaction between anti - slide piles and rock and soil of side slopes, the soil arching model of anti - slide piles and the internal stress calculation method of prestressed anchor cables

    目前國內外對抗滑樁的研究,除試驗研究外,主要採用傳統的懸臂梁法、地基系數法及彈性力學方法來進行分析。本文在前人的研究基礎上,通過對抗滑樁相關設計計算理論進行研究,包括抗滑樁與邊坡巖土體的相互作用,抗滑樁的土拱效應模型以及抗滑樁預應力錨索的內力計算方法進行分析。
  12. These measures included the slope horizontal displacement monitor, the supporting structure swag monitor, the subsidence monitor, the pre - stress of anchor monitor, the ribbed beam steel stress monitor. we monitored the whole process and got feedback information in time, so the trend and development of slope " s displa

    在施工過程中,我們採取了邊坡穩定性安全監測措施,主要包括邊坡水平位移觀測及支護結構撓度觀測;沉降觀測;以及錨桿應力監測;助梁鋼筋應力監測等。進行全過程的檢測並及時反饋信息,隨時掌握邊坡的位移趨勢與發展。
  13. The rock anchor beam is the most difficult and demanded in excavating underground factory, its quality will affect its safety of performing later, as a result, a better quality and smaller crushedregion is demanded

    在水電站地下廠房開挖中,巖錨梁開挖難度大、質量要求高,該部位成型質量的好壞將直接影響今後廠房內吊車的運行安全。巖錨梁開挖要求其具有良好的開挖輪廓面和較小的破壞范圍。
  14. For example, frp reinforced concrete is used to support or surround magnetic resonance imaging ( mri ) medical equipment, and frp is also used for the constructions of some seawalls, industrial roof decks, base pads for electrical and reactor equipment, anchor in rock and ground engineering and concrete floor slabs in aggressive chemical environments in order to promote the wide usage of frp and frp reinforced concrete structures, financed cooperatively by nationa l natural science foundation ( item : the research on mechanical performance of frp reinforced concrete beam reinforced ; number : 59978046 ) and henan illustrious youth science foundation, connected with the analysis methods of modern steel reinforced concrete structure, the thesis further studies the flexural performance of frp reinforced concrete beam through the systematic study on experimental data got from this kind of beams, systematically establishes the theoretical calculating system of the flexural performance of frp reinforced concrete beam in cooperation with the up - to - date analytical methods for reinforced concrete, which suits the properties of frp

    例如,纖維增強塑料筋應用於支撐和圍繞磁共振成像醫療設備的混凝土中及海堤、工業頂棚、電設備、反應設備的基座、巖土工程中的錨桿、侵蝕性環境的混凝土結構等海洋工程、橋梁工程、路面工程、巖土工程、醫療及化工工程的建設。為了推動纖維增強塑料筋及其混凝土結構在工程中的廣泛應用,本文在國家自然科學基金(項目名稱:纖維增強塑料筋混凝土梁力學性能的研究;編號: 59978046 )和河南省傑出青年基金的資助下,通過對纖維增強塑料筋混凝土梁正截面受彎性能試驗數據的系統分析,結合現代鋼筋混凝土結構學的分析方法,對纖維增強塑料筋混凝土梁正截面受彎性能進行了深入的研究,較系統的建立了適合於纖維增強塑料筋特點的纖維增強塑料筋混凝土梁正截面受彎性能的理論計算體系。
  15. Floors were plate with the main structure ( beam ) link, the length of anchor support should comply with the design requirements and should be less than 50 mm, will be a reliable link anchor pieces, location should meet the design requirements

    組合樓板中壓型板與主體結構(梁)的連接,其錨固支承長度應符合設計要求且應小於50 ? ,端部錨固件連接應可靠,設置位置應符合設計要求。
  16. Fatigue test of tensile anchor plates in cable - beam anchorage zones for zhanjiang gulf bridge

    湛江海灣大橋錨拉板式索梁錨固區疲勞試驗
  17. Research on safety standard for rock anchor beam under blasting vibration in large underground powerhouse

    大型地下廠房巖錨梁爆破安全控制標準研究
  18. In light of the existing problem in researching the mechanism of prestressed anchor rope foundation beam system, and based on the loading and deformation compatibility relation of foundation and foundation beam of prestressed anchor rope foundation beam system, through decomposition and discretization of prestressed anchor rope foundation beam system, a new theoretical calculation method that can consider the interaction of prestressed anchor rope foundation beam system, is proposed

    摘要針對現階段預應力錨索地梁與地基共同作用機理研究方面存在的問題,以預應力錨索地梁和地基巖土體之間荷載、變形協調關系為基礎,通過對預應力錨索地梁體系的分解和離散化處理,建立了能考慮預應力錨索地梁體系共同作用的預應力錨索地梁計算理論和方法。
  19. Study of the influence of anchor situation on coordination coefficient of the corroded reinforced concrete beam

    梁端錨固情況對銹蝕梁協同工作系數影響研究
  20. On the basis of stability analysis, the author takes the k27 + 825 slope from the type of slope which has lest stability as an example. according to its basic feature, the design ueses the choosed best reinforce and control scheme : lattice beam, anchor wire, grouting and abstraction of water. in the course of design, the author takes into account not only reasonable optimize of whole control plan but also local measure such as whether the unstable block will shear from vnlnerable sections when control plan is laid out concretely, in order to reach the goal of reasonable design and effective control

    在穩定性分析的基礎上,以邊坡穩定性最差的一類中的k27 + 825邊坡為例,結合其自身的特點,用優選出的加固防治方案:框架梁+錨索斗灌漿+排水進行設計,設計中既考慮總體防治方案的合理優化,又充分考慮了加固工程的具體布置時是否存在不穩定體從錨索或框架梁的薄弱部位剪出的可能性等一些細部措施,以達到合理設計,有效及經濟治理的目的。
分享友人