beam and girder construction 中文意思是什麼

beam and girder construction 解釋
交梁結構
  • beam : n 1 梁,棟梁,桁條;(船的)橫梁。2 船幅;(動物、人的)體幅。3 (秤)桿,杠桿,(織機的)卷軸,...
  • and : n. 1. 附加條件。2. 〈常 pl. 〉附加細節。
  • girder : n. 【建築】縱梁,大樑,撐柱,撐桿,大型工字梁。 a framed girder構桁。adj. -less
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. Problems occured in the anchoring of overhung tourist hall on top of the tv tower and tower drum due to construction mistakes. it was introduced in this paper that two non - binding prestressed girder beams are respectively set in corresponding locations as the anchor beam of overhung radial support beam of tourist hall, thus the integrity of the tower drum and transmission of the load were guaranteed

    由於施工失誤,作為電視塔頂的外懸游覽廳和塔筒間的錨固發生了問題,本文介紹了採用在相應位置設置兩根無粘結預應力大樑分別作為游覽廳屋面和樓面徑向懸挑支承梁的錨固梁,確保了它和塔筒的整體性和荷載的傳遞。
  2. Some experts once suspected that the reserve pre - stresses in the lateral beams are not enough. in order to settle this problem, three construction schemes are analyzed comparatively. the results indicate that the pre - stresses in the lateral beam are acceptable and tensioning the reinforcements by two steps is the appropriate method both for the girder and the lateral beam

    針對這一問題,本文採用三種施工方案進行對比計算分析,結果表明橫隔梁中的預應力儲備是滿足要求的,而且金馬大橋採用的這種橫隔梁力筋分批張拉的施工順序使該橋邊主梁及橫隔梁的受力都較為合理。
  3. Abstract : the paper introduces the erection of the steel box girder of a long - span steel box - concrete composite bridge using broad double guide beam without affecting the normal operation of electrified railway and marshalling yard under the bridge, including construction plan, design of gantry crane and guide beam, as well as key points of construction technology

    文摘:介紹在保證電氣化鐵路、編組站場正常運營情況下,運用寬幅式雙導梁解決大跨度鋼箱混凝土結合梁橋的鋼箱梁架設技術難題,重點闡述了施工方案,龍門吊、導梁設計,工藝要點等。
  4. It has also pounded the keys, devices, disposition of surveyed spots, measure method and procedures, data gathering and process ( relation with construction workmanship ), error analysis and adjustment, control precision and rules, mechanism and method of control, tables of records, results and discussion. after completion, the bridge has good behaviors in dead loads state, cable forces, shape style of main beam, stress and strain of concerned sections, displacements of the tower top, which assure the reasonable state of cables, main girder and towers, and safe under running, demonstrate supervision

    通過課題研究與實橋運用,荊州長江公路大橋斜拉橋施工過程各狀態和成橋恆載狀態下,斜拉索索力、主梁線形、主梁關鍵截面應變、索塔塔頂水平偏位等關鍵項目的施工控制結果均滿足設計期望值的要求,滿足橋梁施工范圍的要求,大橋主梁線形流暢,斜拉索、主梁和索塔三大體系的受力狀態合理,橋梁結構安全可靠,大橋的監測監控取得了圓滿成功,並為該橋營運階段的長期監測監控奠定了良好的基礎。
  5. Beam and girder construction

    交梁結構
分享友人