beam river 中文意思是什麼

beam river 解釋
比姆河
  • beam : n 1 梁,棟梁,桁條;(船的)橫梁。2 船幅;(動物、人的)體幅。3 (秤)桿,杠桿,(織機的)卷軸,...
  • river : n 1 河,江。 Rriver Thames 或 the R Thames 泰晤士河; the Hudson R 〈美國〉哈得孫河。 the Rriver ...
  1. A 2 - d fem program is designed to simulate and compute thermal - creep - stress field in a long beam on batholith and taipu river pumping station. some conclusion available in designing and construction are presented

    編制了平面有限元程序,模擬計算了巖基上長梁和太浦河泵站工程的溫度徐變應力場,得出一些對工程設計和施工有益的結論。
  2. Strip - shape underground structures such as the tunnels and tubes for various uses can be treated as a beam on elastic foundation under earthquake condition , although there exists soil - structure interaction , the foundation soil vibration is dominant in other words , analysis of earthquake response of the soil is essential to this end , simplified models , ( i. e equivalent mass system models based on some equivalence criteria ) are proposed , instead of a general 3 - d continuum model in this study , equivalence criteria are proposed and the simplified models are compared the single - mass - string model is proved to be valid and therefore applied to the analysis of earthquake response of the pearl river immersed tunnel

    條裝地下結構如隧道、各種埋設管道等一般可看作彈性地基梁進行靜力及動力分析在地震條件下,結構與土相互作用,但土的振動成為主要因素為分析土的地震響應需把基土這一三維連續體作簡化處理,簡化成為等效多質點模型本文著重探討這種簡化模型的建立方法,推導等效方程,通過幾種簡化體系的分析比較,論證單質點串體系的合理性,並將其應用到廣州黃沙芳村珠江水下隧道工程的地震響應分析,為抗震設計提供依據
  3. This paper presents the structural design of the main bridge of lhasa river bridge, makes a deep - going study of the key techniques for design of the bridge, such as the reasonable span length ratio of each span of the 5 - span girder and arch hybrid structure, mechanical behaviour of the dual arch ribs, and section of the continuous girder tie beam, and also works out rigidity and stress conditions of the continuous girder tie beam and stress conditions of the concrete - filled steel tube arches of the main bridge

    摘要介紹了拉薩河特大橋主橋結構設計情況,對於五跨梁拱組合橋梁各孔跨合理的跨度比、疊拱的受力行為及連續梁系桿截面形式等設計中的關鍵性問題進行了深入的研究,給出了主橋連續梁系桿的剛度和應力情況、鋼管混凝土拱的應力情況。
  4. Based on the detailed investigation, the distribution of cracks in capping beam of the abutment of huaihe river bridge on the national road 107 is presented, the causes leading to the cracks are thoroughly analyzed, and the construction scheme and methods for remedy of the cracks in the abutment are described as well

    摘要在詳細調查的基礎上,介紹了107國道槐河大橋橋臺蓋梁裂縫的分佈情況,深入分析了裂縫形成原因,並闡述了該橋的加固方案和施工方法。
  5. Emulation model test of plank - beam style aqueduct of diaohe river

    刁河板梁式渡槽模擬模型試驗研究
  6. Erecting technique of movable steel truss beam for the transferbridge at north bank of yangtze river on xinyi - changxin railway

    新長鐵路長江輪渡棧橋活動鋼桁梁架設技術
  7. This paper deals with seismic response of a tunnel - soil system immersed tunnel , as an underground structure , must be compatible with the deformation of the surrounding soil thus the simplified model for a tunnel - soil system is established through two steps at the first step , an mdof system is developed for modeling the foundation soil to this end , dynamic behavior of the foundation soil is analyzed a typical section of the foundation soil simplified as a single mass - spring system on the basis of some equivalent criteria those mass are linked longitudinally by elastic springs to form an mdof system at the second step , the tunnel is treated as a beam on elastic foundation ; that is , the tunnel is connected with the soil massed to form a tunnel - soil system this model has been applied to the seismic analysis of huangsha fangcun immersed tunnel across the pearl river in guangzhou design recommendation is proposed on the basis of this analysis

    研究沉管隧道在地震條件下整體受力的分析方法分兩步建立計算模型第一步通過分析場地地基土切片的動力特性,根據等效原則將其化為等效單質點體系,然後在縱向用等效彈簧連接而成為多質點體系的地基土計算模型;第二步將隧道看作彈性地基梁與上述多質點體系通過等效彈簧連結而得到土隧道體系的計算模型本文結合廣州黃沙芳村珠江水下隧道工程實例建立了具體的計算模型並對多種不同的約束條件,進行了縱向與橫向地震響應時程分析,為該隧道的抗震設計提供依據
  8. With added the tmd, bod reduce flap epuipment. added the second form beam, the preparative box and the connect both line etc on the big bridge of yellow river at beijing to guangzhou line, and contrast between before and after reinforced, we analysed the result and dicided to adopt the reinforce project to connect both line

    在京廣黃河大橋上通過實施加tmd 、 bod減振器,增設第二平聯、準箱形梁及雙線剛性連接等試驗,利用通過列車進行加固前後的對比測試,通過結果分析決定在京廣黃河大橋上採用雙線剛性聯接方案進行加固。
  9. The analytical example is min - river cable - stayed bridge, which is the third longest cable - stayed bridge and the longest composite beam cable - stayed bridge in the world, with main span 605m. the paper set up a 3d model of the bridge with ansys finite element program, considering the geometrical and material non - linearity

    以青州閩江大橋這座主跨長605m的大跨度疊合梁斜拉橋為例,利用ansys大型通用程序建立成橋階段、懸臂階段的空間模型,在計算中考慮了材料非線性和幾何非線性的影響。
  10. This thesis will emphasis research the technique of reinforcing experiment test on the top - bear type armor plate the beam, especially to the 40 - meter top - bear type armor plate beams of the big bridge of yellow river of zhengzhou

    本文重點研究上承式鋼板梁特別對京廣鄭州黃河大橋40米上承式鋼板梁的加固技術實驗測試。
  11. Firstly, routine analyses such as dynamic modal analysis 、 response spectrum analysis 、 buckling analysis were used to analyze the bridge. secondly, only little number of studies dealing with the bridges like kunyu river cable stayed bridge which is the cable stayed bridge of the super breadth composite beam have been reported so far

    首先對昆玉河斜拉橋做了動力模態分析、反應譜分析、主塔及全橋穩定性分析等常規分析。考慮到此座橋型的結構特點即超寬疊合梁。
  12. Its main span, which is 60m long, is made up of prestressed concrete continuous beam. the fourth pier, one of the main piers, adopts the compound foundation constituted with double - siding steel cofferdam and drilled shafts which stands on the deep - water and slopping river bed where geological condition is very complex, so the cofferdam has the trend of slippage

    渝懷鐵路第20標段阿蓬江大橋全長343 . 06m ,主跨為60m的預應力混凝土連續梁, 4 #墩是其一個主墩,基礎採用雙壁鋼圍堰與鉆孔樁相結合的復合基礎。
  13. Taking the long span continuous rigid - frame structure of the south bank approach spans of wuhan tianxingzhou changjiang river bridge as the research object, and using the large scale finite element analysis program ansys and two ways of modeling with solid element and spatial beam element, this paper respectively analyzes the dynamic characteristics of the rigid - frame structure of the approach spans, makes a study of the influences of rigidity changes and bearings failure of the thin - wall piers on the dynamic characteristics of the structure of the approach spans and also compares the results of numerical analysis of the two kinds of modeling

    摘要以武漢天興洲長江大橋南岸引橋大跨度連續剛構為研究對象,運用大型有限元分析程序ansys ,採用實體模型與空間梁單元兩種建模方式,分別分析了其動力特性,探討了薄壁墩的剛度變化與支座失效對其動力性能的影響,並對兩種模型的數值分析結果進行了比較。
分享友人