beam steel plate 中文意思是什麼

beam steel plate 解釋
大樑鋼板
  • beam : n 1 梁,棟梁,桁條;(船的)橫梁。2 船幅;(動物、人的)體幅。3 (秤)桿,杠桿,(織機的)卷軸,...
  • steel : n 1 鋼,鋼鐵。2 鋼製品;刀,劍,打火鐮;(女人胸衣等中的)松緊鋼條[絲];鋼磨;〈美國〉剃刀,小刀...
  • plate : n 1 厚金屬板 〈cf sheet〉 板(片);(記有姓名等的金屬)牌子,(尤指醫生的)招牌,藏書牌;【印刷...
  1. Steel moment - resisting frames with welded beam - to - column connections were traditionally regarded as having excellent performance, and widely adopted in steel constructions, but this opinion changed after the 1994 northrige earthquake and the 1995 hyogoken - nanbu earthquake. these earthquakes also arouse engineers to resurvey the behavior of end - plate connections

    傳統觀點認為,樑柱焊接剛性連接具有較好的抗震性能,因此在工程中得到了廣泛地應用,但1994年的northrige地震和1995年的阪神地震改變了這種傳統觀點,這兩次地震也引起了工程技術人員對端板連接的再審視。
  2. Considering special form of the boiler frame, the reconstruction and enforcement method, in addition dynamic analysis are given by particular steps : establishment of the model of boiler steel frame, determination of earthquake loads and distribution form, and anti - side force system for the frame to model and analyze, involving loads on the frame and above it, earthquake loads, damping, sway control installation, hanging bar and plate beam

    考慮鍋爐構架鋼結構的特殊形式,研究並提出了電站鍋爐鋼結構改造加固研究方法,及動力分析的具體步驟:建立了鍋爐鋼結構動力分析模型、地震荷載分析方法、建立了鍋爐鋼結構布置型式、及整個鍋爐鋼構架抗側力體系模擬分析方法。具體包括:鋼構架本體及構架上荷載、地震載荷與阻尼系數確定、制晃裝置確定、吊桿與大板梁簡化。
  3. In this thesis, four types of steel beam - rectangular cfst column connections, including normal welded flange plate ( wfp ) connection, bolted flange plate ( bfp ) connection, stiffened end plate ( sep ) connection and double split - tee plate ( dst ) connection, were designed based on the configuration of steel frame connection. total 8 models, 2 models of each kind of connections were tested under low - reversed cyclic loading at the end of cfst columns. the relationships between force and displacement at the end of columns, the relationships between the moment and rotation of the joints, degradations of strength and stiffness, ductility, failure mechanism and failure characteristics of these four connections under different axial - compression ratios were presented

    本文借鑒鋼框架節點構造,設計了四種類型矩形鋼管混凝土柱與鋼梁連接節點,包括常規栓焊( wfp )節點、翼緣全螺栓連接( bfp )節點、雙t板連接( dst )節點以及加勁端板連接( sep )節點,進行了四類節點8個模型試件在柱端低周反復荷載作用下的抗震性能試驗研究,比較了不同軸壓比下節點的滯回性能、強度與剛度退化、延性、破壞機理與破壞特徵,主要結論有: 1 、節點的位移滯回曲線與轉角滯回曲線為塊型分佈,沒有或略有捏攏現象,耗能能力強; 2 、軸壓比對節點滯回曲線有顯著影響,全部節點都有顯著的剛度退化; 3 、位移與轉角骨架曲線在峰值荷載後有較長的水平或下降段,具有良好的延性性能; 4 、從整體抗震性能上看,翼緣全螺栓連接節點、雙t板連接與加勁端板連接節點都優于常規栓焊節點,可在實際工程中加以推廣。
  4. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪錨筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用鋼筋砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  5. One steel producer, the xin yu iron and steel group in jiangxi province, operates a production complex including wire rod mills, a beam - rolling mill and plate - rolling mills

    其中的一家生產商,江西新余鋼鐵集團,主要生產包括盤條鋼、鋼梁軋鋼以及中厚板鋼等。
  6. With the actual locale incestigating, the actual locale testing and the theories analyzing of the reason of the diseases producing of the exceed limit of horizontal swing and steel pole ' s break, and summaried the reinforcing measure of the top bear armor plate beam

    通過對京廣線鄭州黃河大橋40米上承式鋼板梁橫向擺動嚴重超限及鋼梁桿件斷裂等情況的現場調查、現場測試和理論分析及病害原因產生的機理,總結提出了上承式鋼板梁的加固措施。
  7. Thus it is necessary to study moment resistance, rotation stiffness and rotation capacity of the joints. in this paper, six specimens on end - plate composite beam - to - column joints and two specimens on end - plate composite beam - to - column joints were designed to subject to static load. the factors of m - characteristics about semi - rigid composite joints, including bolts, profiled steel sheeting, beam, column, stiffen rib and reinforcement, are studied

    本文設計了6個端板型鋼-混凝土組合樑柱節點與2個端板型純鋼樑柱節點,通過對這些試件的靜力荷載試驗,重點研究了端板型鋼-混凝土組合節點的彎矩-轉角性能的影響因素,包括高強螺栓、壓型鋼板、型鋼梁、型鋼柱、加勁肋,以及混凝土板內縱向鋼筋配筋率等。
  8. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  9. First, the author carried out static experiment on the 1 : 1 model of fixed support beam strengthed by external prestressing and by bonding steel plate

    首先,進行了1 1模型的體外預應力法和粘鋼法加固固端支座梁的靜載試驗。
  10. A plate - beam composite element suited to calculate through steel - truss composite bridges

    一種適用於下承式鋼桁結合橋計算的板梁組合單元
  11. Therefore, the light steel portal frame system is compared comprehensively to the bent frame system of solid - web steel column and solid - web steel plate beam, the bent frame system of solid - web steel column and open - web steel pipe truss, as well as the system of rc column and open - web steel pipe truss

    因此對中小型單層廠房中實腹式鋼柱加實腹式鋼板梁排架體系,實腹式鋼柱加空腹鋼管桁架排架體系以及鋼筋混凝土柱加空腹鋼管桁架排架體系與輕鋼門式剛架進行了綜合比較。
  12. Upholding the principle of " keep improving, supply scientifically ", constantly increasing input, this company purchased over 30 sets of domestically top level special equipment, such as steel pretreatment line, nc cutter, nc bender, nc hydraulic pressure churn driling compound machine and hydraulic pressure plate cutting machine, and brings in worldwide latest laser beam cutter torealize special processing requirements with superior performance

    本著「精益求精,科學供給」的原則,不斷加大投入,先後購置具有國內領先水平的鋼材預處理線、數控切割機、數控折彎機、數控液壓沖鉆復合機、液壓剪板機等專用設備30餘臺套,從國外引進世界最新技術的激光切割機,以其優越的性能,實現特殊加工要求。
  13. It is carried on our research in this field from the multi - resident steel structure knot of beam - column research. there are various of knot style including top - and seat - angle steel, top - and seat - angle with double web - angle steel connections, extended - end - plate bolted connections and so on

    多層住宅鋼結構樑柱節點型式的研究到現在已有各種節點型式,如頂底角鋼連接,頂底角鋼、腹板雙角鋼連接,外伸端板高強螺栓連接,上下翼緣t型鋼連接,狗骨式剛性連接等。
  14. In this paper, the author study the mechanics performance of reinforced concrete beam strengthened by external prestressing and the contrast against it by bonding steel plate by the means of theoretics and experiment. through this study, the author educes many valuable conclusions and put forward some advices for the design of beam strengthened by external prestressing

    本文採用試驗和理論研究相結合的方法,對採用體外預應力法加固鋼筋混凝土梁進行了較深入的研究,並將其與粘鋼法加固進行對比研究,得出了諸多有價值的結論,並對體外預應力法加固梁設計提出了改進辦法。
  15. Three of them are strengthened by external prestressing, two of them are strengthened by bonding steel plate, and the other one is reinforced concrete beam as contrast experiment beam

    試驗的六根梁中三根為預應力加固梁,二根為粘鋼加固梁,另外一根為鋼筋混凝土對比試驗梁。
  16. Model board trolley is a non - standard large mechanical equipment for tunnel construction, its main frame is a plate and beam element constructed steel structure

    模板臺車是隧道施工中二次襯砌用的一種大型非標機械設備,其主體結構是板梁結合的鋼結構。
  17. In this thesis, a series of single and double - direction - load tests are carried on the single plate framing connection between truss - steel beam and concrete wall often used in tall - building. by single - direction - load tests, the flexure capacity of the joints in use of different design is researched in particular, the effect of bolt design on the flexure capability is analysised ; based on the cyclic loading experiment, such characteristics of the anchors are analyzed -. bearing capacity. rigidity, ductility, hystersity capacity, energy dissipation and failure phenomena

    通過單向靜力試驗,研究了單剪板連接的不同設計對鋼架梁的約束能力的變化,重點討論了螺栓的設計對約束能力的影響;通過周期性反復加載試驗研究了不同設計的單剪板連接預埋件的抗震性能的不同,重點分析了結構的承載能力、剛度、延性、滯回性能、耗能能力及其破壞特徵等。
  18. In order to research mechanical capability of the reinforced concrete beam with bonding steel plate, adopting separate method to establish finite element model of the reinforced concrete beam with bonding steel plate, using fem to study dynamical characteristics of the model, have got good results which can not be easily got using traditional resolution method, which can give reference to study dynamical characteristics of the reinforced concrete beam with bonding steel plate

    摘要為了研究粘鋼加固后鋼筋混凝土梁的各種力學性能,採用分離式方法建立了粘鋼加固后鋼筋混凝土梁的有限元模型,並用有限元方法對此模型先後進行了模態分析和簡諧集中載荷作用下的動力響應分析,得出了加固后鋼筋混凝土梁的前5階振動模態和簡諧集中動荷載作用下粘鋼加固鋼筋混凝土梁底部開裂的極限動載荷幅值頻率曲線,可為研究粘鋼加固鋼筋混凝土梁的各種動力特性提供參考。
  19. Eventually, the rehabilitated specimens were retested under low cyclic loading. the loads and displacements of the beam end as well as the steel or plate strain were measured in detail ; and furthermore, crack patterns and failure model of the specimens were also observed during the test

    在對試驗結果的整理分析后,本文對比研究了加固前後以及用不同加固方法加固的試件的開裂荷載、屈服荷載和極限承載力、梁端荷載?轉角滯回曲線及其包絡線特徵、延性和耗能性能。
分享友人