blank test 中文意思是什麼

blank test 解釋
空白試驗
  • blank : adj 1 (表格等)空白的,(紙等)無字的;空著的;【商業】(支票等)不記名的。2 (子彈等)空的,(...
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  1. Methods studying the effect of mannitol on determining cardiomypeptide content by blank test and recovery test

    方法用空白、加樣回收等方法考察甘露醇對測定結果的影響。
  2. Memory acquistion deficit pattern, a blank control group received ip of equivalent normal saline, the remaining 5 groups received ip of 5mg / kg scopolamine hydrobromide at ihour after last administration. 30mins later, step - down test was used to train mice, the test was given after 24 hour

    記憶獲得障礙小鼠,在末次給藥后1小時,腹腔注射氫漠酸東直著堿sing kg , 30ndn后使用跳臺法訓練小鼠, 24 j 』時后重新測試,記錄觸電潛伏期和5dn內錯誤次數。
  3. Bearings roller bearings and other components. bearing ring precision rolling production line ; a high - precision, super efficient grinding automatic production line ; bearing assembly line ; signal processing equipment ; blank processing equipment ; crowning roller grinder ; end - grinder ; coordinate precision grinder ;, cylindrical grinder ; surface grinder ; spherical roller processing equipment ; raceway grinder ; heat treatment ; needle processing equipment ; polishing processing equipment ; roller - seiki ; rolling auto - sorting machine parts bearing hardness sorting machine bearing cleaning equipment ; contact angle measuring instrument ; contour meter ; bearing life experimental device ; bearing packaging equipment ; roundness instrument ; dynamic vibration noise analyzer ; noise vibration test equipment ; printing machine measuring instrument ; roughness tester ; scanning electron microscope ; finish detector ; inverter ; spindle, wheel, whetstone and other grinding materials

    軸承套圈精密輾擴生產線高精高效磨超自動生產線軸承自動裝配線球加工設備毛坯加工設備凸度滾子磨床雙端面磨床高精度坐標磨床內外圓磨床平面磨床球面滾子加工設備溝道磨床熱處理生產滾針加工設備光飾加工設備滾道超精機滾動體自動分選機軸承零件硬度選別機軸承清洗設備角接觸測量儀輪廓測量儀軸承壽命實驗裝置軸承包裝設備圓度儀振動噪音動態分析儀振動噪音測試裝置印字機加工測量儀粗糙度測試儀掃描電子顯微鏡光潔度檢測儀變頻器電主軸砂輪油石和其他研磨材料
  4. Spatial resolution deficit pattern, after administration for 10 days, water maze test was adapted to train mice for successive 5 days. a blank control group received ip of equivalent normal saline, the remaining 5 groups received ip of 15mg / kg pentobarbital sodium at 30min before training everyday, mice were administrated 1 time during training

    空間分辨障礙小鼠,連續給藥10天後,採用水迷宮法連續訓練5天,每天y ! i練前30ndn ,腹腔注射戊巴比妥鈉15mg kg 。訓練過程中每天給藥1次。
  5. Blank transmission test

    空白傳輸測試
  6. Blank test sample

    空白試驗樣品
  7. The main deficiency of crankshaft fatigue test machine now used in our country are inadequate test loading precision, low automatic and intellective degree and blank of mathematical statistics by computer. in order to fix them up, a new style crankshaft fatigue test system is developed

    針對目前國內曲軸彎曲疲勞試驗機試驗精度不夠、試驗的自動化和智能化程度較低以及在試驗數據計算機統計空白等不足,開發了一種具有較強實用性的新型曲軸彎曲疲勞試驗系統。
  8. Brushed with the thickness of 1. 5 ~ 2. 0mm. it can improve the impermeability pressure up 3 times that of blank samples ; the crystalline reaction can continuously carry out, sealing the crack and waterproofing for ever if water is existent ; very good environmental adaptability, and can be used as normal at ph 3. 0 ~ 12. 0 ; moreover, the contrast tests of the performance of pt coating with two kinds of widely used waterproofing coating xypex and coprox were also carried out in this paper. test results show that the properties such as impermeability, self - rehabilitating ability and corrosion resistance are superior to those of the counterparts

    試驗結果表明, pt防水塗料具有如下的性能特點:具有良好的防水性能,塗刷厚度1 . 5 2 . 0mm ,抗滲壓力可提高3倍以上;在有水的條件下,結晶反應可以不斷進行,能實現自愈合、永久性防水;具有很強的環境適應性,在ph值3 . 0 12 . 0條件下均可正常使用;此外,本文還進行了pt防水塗料與同類型防水材料xypex和防水寶(二者都是目前應用廣泛的防水塗料)的性能對比試驗。
  9. At this background, though coupling beams with the small ratio of the span to depth have no sufficient test results, in order to satisfy the needs of engineering design, the code for design of reinforced concrete high - rise structure ( jgj3 - 2002 ) still adopt the design method of decreasing the maximum shear force and increasing the quantity of stirrups. but in china code for design of concrete structures ( gb 50010 - 2002 ) the content of seismic design methods for these kinds of coupling beams continue to be blank

    在這一背景下, 《高層建築混凝土結構技術規程》 ( jgj3 - 2002 )為了滿足工程設計需要,對小跨高比連梁在沒有充分試驗結果的情況下,仍採用降低最大作用剪力和提高箍筋用量的設計方法(雖然這種方法已被國外試驗證明在跨高比小於1 . 50的連梁中是肯定不能保證延性要求的) ,而《混凝土結構設計規范》 ( gb50010 - 2002 )則把這部分內容繼續留作空缺。
  10. The successful design of gsmb main board can not only establish theory and practice basis of designing server but also fill up the blank of no safety server based on domestic general cpu in our country in a long time. moreover, gsmb platform can provide north bridge, south bridge, soc ip core with a cross function hardware test circumstance, which can avail to develop chip groups of independent knowledge right, design all kinds of general cpu and high speed embedded cpu, strengthen market competitive ability, finish industrial develop of domestic cpu at an early date

    Gsmb的開發成功,不僅為服務器主板設計積累了理論和實踐基礎,而且填補了我國長期沒有基於國產通用cpu的安全服務器的空白,更可以為研製北橋ipcore 、南橋ipcore 、 socipcore提供一個可進行交叉功能驗證的硬體平臺,以利於開發具有自主知識產權的晶元組、各種通用cpu和高速嵌入式cpu 、增強市場競爭力、早日完成國產cpu的產業化發展。
  11. Memory consolidation deficit pattern, step - down test was adapted to train mice at 1 hour after the last administration, and then a blank control group received sc of equivalent normal saline, the remaining 5 groups received sc of 120mg / kg sodium nitrite, 24 hours later, the test was given

    記憶鞏固障礙小鼠,在末次給藥后1小時使用跳臺法訓練小鼠,訓練后,皮下注射亞硝酸鈉120mg kg , 24 j 』時后重新測試。
  12. If the user leaves the targeted control blank, it passes the custom validation test

    如果用戶將目標控制項保留為空,則將通過自定義驗證測試。
  13. Fixed capacitors for use in electronic equipment. part 4 : sectional specification : aluminium electrolytic capacitors with solid or non - solid electrolyte. selection of methods of test and general requirements. blank detail specification : aluminium electrolyte capacitors with solid electrolyte. assessment level e

    電子設備用固定電容器.第4部分:分規范:固體或非固體電解質鋁電解電容器.第2節:空白詳細規范:固體電解質鋁電解電容器. e級評定
  14. Memory retrieval deficit pattern, step - through test was adapted to train mice at 1 hour after the last administration, the test was given after 24 hour. a blank control group received ig of equivalent normal saline, the remaining 5 groups received ig of 10ml / kg 40 % alcohol at 30min before repeated test

    記憶再現障礙小鼠,在末次給藥后1小時使用避暗法訓練小鼠, 24 j 』時后重新測試,測試前30ndn灌胃40乙醇10im kg 。
  15. If the self - test prints a blank page, check to make sure that the tape has been removed from the print cartridge

    對于不同的印表機型號,自檢頁的列印方法有所不同。在惠普產品隨附提供的用戶指南中查找操作指南。
  16. In the test, the test parameters have nothing to do with students " quality, the final mark also be free with test items. the classical test fixs in with speculate habits, but is impacted on test items. because of the computer adaptive test ' s techology is very complex and test items work is too hard, point blank and concision are n ' t same as the classical test, it ca n ' t carry forward as that one hi this paper, compare two kinds of test to seek the best way to measure students quality subjectively and analys after examation. based

    本文結合作者開發武漢化工學院計算機基礎課的考試系統中的思考,綜合這兩種考試方法的長處,提出一種符合當前高校現狀的計算機輔助考試系統。考試存在兩種模式:一種為傳統類型,即從試題中抽出考題,採用統一試卷對學生進行測試。另一種則為計算機自適應考試。
分享友人