borehole 中文意思是什麼

borehole 解釋
測井圖
  1. Abstract : considering the stochastic characteristic of main hydrogeologic parameters in yuanbaoshan open coal pit, a groundwater stochastic management model for optimal drainage borehole design is established. the result of the modeling shows the effect of stochastic characteristics of hydrogeologic parameters on the result of management modeling. it was found that the higher the parameters uncertainty and the management reliability level, the worse the management result

    文摘:從影響元寶山露天礦地下水疏乾的主要水文地質參數隨機性特徵分析入手,建立並求解了元寶山露天礦疏干工程優化設計的隨機地下水管理模型,揭示了水文地質參數隨機性對管理模型結果的影響,認為參數的隨機性越大,管理結果越壞;置信水平越高,管理結果越壞,且滲透系數和邊界條件對管理結果影響最大。
  2. Following the idea of coseismic stress - triggering, coseismic strain steps recorded by borehole strainmeters are used to study coseismic stress - triggered fault slips

    摘要沿著同震應力觸發的思路,提出了利用鉆孔應變觀測記錄的同震應變階反演同震應力觸發斷層活動的方法。
  3. High resolution borehole micro resistivity image logs ( fmi ) were used to investigate the origin of fracture structures, with tarim basin in northwest china as an example

    摘要以塔里木盆地為例,探討高解析度電成像測井資料在裂縫成因分析中的應用。
  4. Borehole gravity gradiometer

    井下重力梯度儀
  5. Borehole gravity meter

    井下重力儀
  6. General technical condition of all - direction borehole inclinometer for mining

    礦用全方位鉆孔測斜儀.通用技術條件
  7. Application and research of the high accuracy and all - directions borehole inclinometer

    高精度全方位鉆孔測斜儀的研究及應用
  8. Specification for three - component borehole magnetometer

    三分量井中磁力儀技術條件
  9. Gas offtake borehole

    煤氣泄出鉆孔
  10. Study of the digital panoramic borehole camera system

    數字式全景鉆孔攝像系統研究
  11. Application of flac in borehole shrinkage in formation of plaster stone and salt stone

    鹽膏巖地層的井眼縮徑變形分析
  12. Recommended practic e for sand control technology of artificial borehole wall

    人工井壁防砂推薦作法
  13. Borehole - to - surface electrical imaging technique and its application to residual oil distribution analysis of the eighth section in gudong oilfield

    地電位成像技術及其在孤東八區剩餘油分佈研究中的應用
  14. Orientation is very important for a seismometer, whether it is installed on surface or in borehole

    摘要無論地震計在地表或是井下使用,都必須精確定向。
  15. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  16. In accordance with the testing results and the analysis concerned, it is considered that the seismic wave method, borehole acoustic method and indoor rock mechanics test are feasible to evaluate the engineering quality of the foundation rock for the toe slab of the dam comprehensively, and the results can lay a reliable foundation for the accepting the foundation rock for the toe slab of the dam

    根據檢測結果與分析,認為採用地震波法、鉆孔聲波法以及室內巖石力學試驗綜合評價水電站大壩趾板建基巖體工程質量是可行的,其成果可為大壩趾板建基巖體驗收提供依據。
  17. Based on seismic wave method, borehole acoustic method and indoor rock mechanics test, the dynamic and static parameters of the foundation rock for the toe slab of the concrete face rockfill dam for shuibuya hydropower station are tested, and then the relationship among the rock quality, dynamic parameter and static parameter are established with the parameters obtained from the test, furthermore, the classification and the quality evaluation are made as well

    摘要採用地震波法、鉆孔聲波法以及室內巖石力學試驗法,對水布埡水電站面板壩趾板建基巖體進行了動、靜參數測試,並根據所獲的參數建立了巖體質量、巖體動力學和靜力學參數三者之間的相關關系,對工程巖體進行了質量分級和質量評價。
  18. The interior size and the calorific capacity of the borehole are much smaller, moreover the temperature change is slow, so usually we can neglect the influence of calorific capacity but to consider according to the heat transfer in steady state process, thus we can establish one - dimensional and the two - dimensional thermal resistance model in the borehole

    而在鉆孔內部,包括回填材料,管壁和管內傳熱介質,與鉆孔外的傳熱過程相比較,由於其幾何尺寸和熱容量要小得多,而且溫度變化較為緩慢,因此通常可以忽略其熱容量的影響而按穩態傳熱過程來考慮,建立了鉆孔內的一維和二維的熱阻模型。
  19. In this paper, the sensibility analysis of the factors affecting the temperature in well bore is relatively systematically made by using a large number of the data calculated with the borehole flow and heat transfer 3 ? d numerical model proposed by the author. the study shows that the thermophysical parameters of the drilling fluid and formation, etc. and the entrance temperature and circulating capacity, etc. of drilling fluid have a greater influence on the temperature in well bore. therefore, accurately mastering the thermophysical parameter values of penetrated formation and drilling fluid in well bore, considering the influence of the temperature and pressure on thermophysical parameters and accurately measuring such parameters as entrance temperature and discharge capacity of drilling fluid, etc. are of utmost importance for accurately simulating the temperature in well bore

    利用由作者提出的井內流動和傳熱的三維數值模型計算所得的大量數據,文章對影響井內溫度的諸多因素進行了較系統的敏感性分析,研究表明:鉆井液和地層等的熱物理參數以及鉆井液的入口溫度、循環排量等對井內溫度有較大影響,因此,準確掌握所鉆地區地層和井內鉆井液的熱物理參數值,考慮溫度壓力對熱物理參數的影響,準確測量鉆井液的入口溫度、排量等參數值,對于井內溫度的準確模擬至關重要。
  20. Borehole sealing technology used in north huihe river in honghuaerji coal - bearing basin

    紅花爾基煤盆地輝河以北礦區鉆孔堵漏技術
分享友人