bottom cement 中文意思是什麼

bottom cement 解釋
艙底膠結劑
  • bottom : n 1 底,底部。2 地基,基礎;根底;底細,真相,原因,根源。3 (樹的)根干;(山)麓麓;〈方,常 pl...
  • cement : n 1 水泥。2 膠泥;膠合劑,接合劑,膠;【醫學】(牙科等用的)黏固粉。3 【解剖學】(牙齒的)白堊質...
  1. Pass to analyze the cement powder spray a problem for reuniting the foundation sink to decline the calculation esse, the suggestion uses to sink to decline the proceeding correction to the bottom layer in response to the dint correction coefficient, its result with actual than near to, from but for the engineering ' s design with applied to provide the basis

    摘要通過分析水泥粉噴樁復合地基沉降計算存在的問題,建議用應力修正系數對下臥層的沉降進行修正,其結果與實際較接近,從而為該工程設計和應用提供了依據。
  2. Resurvey the column axis and elevation line, and mark out the column form line, 1 : 2 cement mortar will be used to leveling at the column bottom. “ 井 ” shape rack will be set around each column, and mark elevation control line on it

    將柱軸線、標高線復測投點,彈出柱支模線,將柱腳支模處用1 : 2水泥砂漿找平,每根柱周圍搭設井字架,在井字架上抄測標高控制線。
  3. To clean the excess cement between upper and bottom area with grinding tools

    用除膠棒將鞋面大底貼合處的餘膠除乾凈
  4. Load : 0. 5 - 3t. jumbo bags are ideal packing for chemical, cement, grain, mineral, and other goods in the shape of powder, granular and lump. top : spout in, and bottom : spout out

    我公司在2004年產值已超2000千萬元統計局資料,我公司有著成熟的生產工藝,優越的產品質量,良好的服務質量。我們的產品銷往全國及海外
  5. The nature conservancy of cement tile blank. after the surface coating production line in preheated purge bottom spray drying intermediate layer spray drying launched drying table a total of three cooling heating and drying surface, the second spraying process, weatherability cement tiles surface coating to achieve the best performance

    自然養護后的水泥瓦坯,在塗裝生產線上經過表面吹掃預熱乾燥底層噴塗中間乾燥面層噴塗面塗乾燥表面冷卻共三次加熱乾燥二次噴塗的工藝過程,使水泥彩瓦表面耐候性塗層達到最佳性能。
  6. Through the research and analysis on the three aspects concerning the base interface of the pavement panel, crack accumulation, expansion in the pavement panel and interaction between spring plates on the road surface as well as its damage on the road fatigue, it is first brought forth that the process of fissures and breakage in the cement concrete pavement can be divided into three stages, i. e. stage of initial crack formation and damage in the bottom of the pavement slab, stage of accumulation, intensifying & expansion in ruptures from load during the time of use and stage of fissures & breakage in the pavement

    通過對路面板底界面開裂、路面板中裂縫積聚、擴展和路面表面車板相互作用及其對路面疲勞破壞的影響等三個層面的研究和分析,首次提出水泥混凝土路面的開裂和破壞過程可以分為三個階段,即路面板底初始損傷西南交通大學博士研究生學位論文第11頁和早期裂縫的形成階段、使用期間荷載作用對路面造成的開裂損傷累計、加劇和裂縫擴展階段以及路面斷裂破壞階段。
  7. The preparations, drilling rig adjustment, pile distribution control, mixing verticality control, elevation measurement, elevation control of pile top and column bottom, curing agent choice and control of mixing speed and blending quantity, must be done well for strengthening soft soil foundation by mixing cement with soil in construction

    在實踐中要做到6點: 1 )調整好鉆機; 2 )控制好柱的分佈位里與攪拌軸的垂直度; 3 )測量好高程; 4 )控制好樁頂、柱底高程; 5 )選擇好固化劑; 6 )控制好攪拌速度和摻加量。
  8. Self - dry coating with excellent adhesion and good water - resistant, resistant to moisture, corrosion - resistance and other properties, applicable to the cement ground, wood floor surface, closed bottom layer and increase the intensity of the role

    為自干型塗料,具有優異的附著力和良好的耐水、耐潮、耐腐蝕等性能,適用於水泥地面、木地板表面,起封閉底層和增加層間強度的作用。
  9. Spring - mounted injector base : apply cement onto insole evenly by following shoe bottom curve

    彈性底座膠盤機構:膠盤底座具彈性,可依鞋底弧度形狀,均勻布膠于中底。
  10. Discuss lightly that the cement stabilizes the quality inspection of the soil basic unit and bottom basic unit and evaluates

    淺談水泥穩定土基層和底基層的質量檢驗與評定
  11. Clinker will be fed to cement mill by belt conveyor after discharged by weighing machines at the bottom of silos

    熟料由庫底計量設備卸出后,用帶式輸送機送入水泥磨。
  12. The soil color changed from dark brown to grey brown, at the bottom layer 4 pillar cavity structures were uncovered. the pillar - cavity structure close to the north wall had signs of cement covering and the areas nearby there were signs of scratch marks from excavators

    土色由深褐轉灰褐色,底層出現四個柱洞結構,近北墻的一個柱洞周圍甚至有以水泥鋪底的現象,附近並且有四爪怪手抓痕。
  13. All columns are made of solid steel. this machine can produce any types of cement products under the measurement of 1000 x 500 x 250, such as slope bricks, curbstone bricks, slope top bricks, slope bottom bricks, moat covers

    1該機工作臺面大,立柱間距1400mm ,立柱均採用實心鋼材加工而成,該機可生產1000500250 mm以下各種規格形狀的水泥製品。
分享友人