bottom layout 中文意思是什麼

bottom layout 解釋
並底車場布置
  • bottom : n 1 底,底部。2 地基,基礎;根底;底細,真相,原因,根源。3 (樹的)根干;(山)麓麓;〈方,常 pl...
  • layout : 安放,布置,劃線
  1. The third international conference on document analysis and recognition, montreal, aug. 14 - 16, 1995, pp. 610 - 614. 4 simon a, pret j, johnson a. a fast algorithm for bottom - up document layout analysis

    視覺相似性分析能夠避免對文字等紋理作靜態固定的模型描述,只要是當前版面上看起來相似的區域,就可以歸為一類。
  2. In order to make the best use of explosive energy in loosing soil or throwing it onto some area and ensuring the bottom meet some leveling requirements after blasting, a plane charge layout is often adopted according to blasting design and engineering quality requirements in open chamber blasting such as mine exploitation, field leveling and foundation pit excavation of construction

    摘要在礦山剝離、場地平整以及建(構)築物基坑開挖等露天爆破中,為了充分利用炸藥能量將巖石松動或拋擲到一定區域,並確保底板滿足一定平整度要求,按照爆破技術設計和工程質量要求,需要設計平面布藥結構。
  3. This paper presents an approach to perceptually extract multi - oriented text lines from online handwriting. the approach adopts a bottom - up strategy. by the approach, strokes are first merged into blocks analogous to words, then a link model is constructed upon these blocks. finally, the optimal text line layout is found out by a branch - bound search on the link model. the experimental results show that the approach is effective and also available to extract curved text lines

    提出一種多方向手寫筆跡文本行的提取方法.該方法以視覺感知理論為基礎,採取自底向上的策略,先將筆畫組合成類比字元的筆畫塊,然後基於這些筆畫塊建立鏈接模型,最後採用分支限界搜索演算法從鏈接模型中找出最優行排列.實驗結果表明,該方法能有效地提取多方向筆跡行結構,並適用於彎曲文本行的提取
  4. Bottom hole layout of flood discharing and sediment flushing and application of silicon powder concrete in baishi reservoir

    白石水庫泄洪排沙底孔布置及硅粉混凝土應用
  5. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  6. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  7. Digital design platform using the " top - down " design methods, this product is the highest form of the component unit began as a component of the overall system to be considered according to their products in the mutual position, played the role and function of the realization of the establishment of such products constitute the graphic layout, through to design constraints, the key design parameters, such as design information capture products to concentrate on aircraft design intent, top to bottom to transmit design information products launched throughout the design process

    數字化機構設計平臺採用「自頂向下」的設計方法,這種方法是從產品構成的最頂層開始把組成整機的部件作為一個整體系統來考慮,並根據其在產品中的相互位置關系、所起的作用和實現的功能等建立產品構成的布局圖形,通過給定設計約束條件、關鍵的設計參數等設計信息,集中地捕捉產品整機設計意圖,自上而下地傳遞所給設計信息,展開產品的整個設計過程。
  8. The mark structure contains five parts : protective device, measure shaft, putright equipment, mark - bottom device and ground device, and gps measure pier functioning in elevation control and horizontal layout control is arranged as well

    標體結構包括保護裝置、引測裝置、導正裝置、標底裝置、地面裝置5大部分,並設gps測墩,兼有高程式控制制與平面位置控制的作用。
分享友人