bounded above 中文意思是什麼

bounded above 解釋
有上界的;上有界的
  • bounded : adj. 1. 有界限的,有限制的。2. 【數學】有界的。n. -ness
  • above : adv 1 在上面;在頭上;【宗教】在天上。 in the room above 在樓上房間里。2 上級;(河)上流;以上。...
  1. The saturated zone is bounded above by a water table.

    飽和帶的上界面為潛水面。
  2. Theorem 1 ( bounded sum test ) a series of nonnegative terms converges if and only if it ' s partial sums are bounded above

    定理1正項級數收斂的充分必要條件是:它的部分和數列有上界。
  3. Are i. i. d. random variables bounded above while the infection rate is a constant. the contact process survives locally for every

    是獨立同分佈而且有上界的隨機變量,感染的速率是常數
  4. The meso - cenozoic evolution of bachu fault - uplift is closely related to its south and north subsiding foredeep. under the background of indian plate subducting under asia - europe plate, bachu forebulge was greatly affected by the development of southwest depression and awati depression. almost all of its structure reversed, and as a result of it, both of its south and north boundary migrated. according to its evolution history and its feature, the authors tentatively use both - side migration model to interpret the evolution of compound forebulge. since triassic, almost all the spheres above lithosphere synchronously became flexure. because transpressional stress field became increasingly strong, bachu forebulge continued uplifting and big faults formed. then, bachu uplift, as a whole, slipped upward along those big faults and showed migrating toward thrust zone in plane. in tectonic tranquility, the lithosphere bounded back and in consequence of it, bachu uplift slipped down and showed migration toward craton, at that moment negative inversion structures developed. while the forebulge migrated toward its south and north foredeep, it was very possible that locally extensional stress appeared in the forebulge

    在印度板塊向歐亞板塊俯沖的大背景下,巴楚前緣斷隆受西南坳陷和阿瓦提凹陷的影響,新生代時構造體制發生反轉,邊界向南北遷移。根據其發育過程特徵,作者用復合前緣隆起兩端遷移模式對復合前緣隆起獨特的構造發育史進行了解釋:即三疊紀以來巖石圈各圈層同步撓曲變形。隨著擠壓應力場的增大,巴楚隆起在撓曲基礎上不斷抬升,形成幾條大型斷裂帶。
  5. Notice that the term "bounded above" has now been used in two ways.

    注意「上有界」一詞至此已在兩個場合用到。
  6. Firstly, sufficient conditions of lagrange stability for nominal unperturbed pendulum - like systems are derived based on the nonlocal reduction method. then the static state feedback controller design methods are presented for uncetain pendulum - like systems with time - varying norm - bounded parameter uncertainty to obtain robust lagrange stability. it is shown that the above problem can be reduced to the existence of the solutions to a set of lmis

    在具體的推導過程中,首先基於非局部降階法,推導了高階標稱類擺系統lagrange穩定的充分性條件,然後基於此條件,針對具有范數有界參數不確定性的受控高階類擺系統,給出了使其魯棒lagrange穩定的狀態反饋控制器設計的充分性條件。
  7. This figure covers the area bounded by the red circle in the above all sky map

    這幅星圖看似很大,其實只顯示了以上簡單星圖中紅色圈中的星區而已。
  8. According to the design theory of the cable - stayed bridge and to the feature of the cantilever construction the authors propose a construction control method called optimum completion state method ( ocsm ) for rc cable - stayed bridges in the proposed method, the optimum completion state is regarded as the final target of the construction control, and the optimum construction state at each construction stage is taken as the technical route the key of the method is to properly choose or adjust the cable forces the objectives function of optimization is to minimize the elevation error of the girder under the constraint condition that the internal forces ( bending moments ) of the girder are bounded the optimization variables are the cable forces on the basis of the above principles, a optimum model for a construction step is established and cable force adjustments can be found for each construction step in this model, the creep and shrinkage effects of concrete have been considered a bridge example is given which shows that the final state of the bridge is very close to the design aim and that this method is much better than the so - called double - control method the example is a good illustration of the soundness and practical value of the proposed method

    根據現代斜拉橋結構設計理論和懸臂施工方法的特點,提出了以最佳成橋狀態作為施工控制的最終目標,以實施最佳施工階段為技術路線,以索力調整為核心內容的斜拉橋施工控制理論,簡稱為最佳成橋狀態法;以斜拉橋主梁標高誤差最小為目標函數,以主梁內力(彎矩)為約束條件,以索力為優化變量,建立了最佳施工階段的索力調整計算模型;推導了考慮徐變收縮效應的索力調整計算公式;用最佳成橋狀態法對一實橋工程進行了施工控制全過程計算研究,得到的成橋狀態與設計目標相當接近,優于該橋以「雙控」為控制目標的實測結果,有力地證明了本文方法的正確性及其工程實際價值
  9. Above all, the main reasons of bubbles creating are : the bounded rationality of investors and related noise trading and positive feedback trading, the rent - seeking behavior, the information asymmetry and related herd behavior and ponzi scheme, the credit expanding including not appropriate monetary policy, the risk - shifting and the moral hazard

    ) ~ tm _ t為泡沫解, m _ t為任意鞅,對應于不同的鞅(或相應的參數值)可以得到不同的泡沫過程。理性泡沫概念提出后,研究重點轉向存在性分析,從定性分析和實證檢驗兩個方向展開。
分享友人