  1. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  2. This paper also makes brief description of the technical specifications, mechanical structure, major features of the italian beam transporting and erecting machine with type of nicola yj - 550, which was introduced firstly in china and chosen carefully in combination with the site conditions. the future beam erection and relevant design and construction can find the reference from description of this paper in terms of erection process for box beam, working efficiency of the italian beam transporting and erecting machine with type of nicola yj - 550, issues and revelations concerning about box beam erection, special beam erection method to avoid three legs supporting

    採用義大利nicolayj - 550型運架梁一體機進行箱梁架設是結合現場實際開展技術攻關、精心選定的施工方法,該型架橋機為國內首次引進,文中就其技術參數、組成結構、主要特點進行了簡要介紹;文中闡述的箱梁架設施工工序、運架梁一體機的作業效益、架梁施工應注意的問題及啟示、架梁施工克服「三條腿」的方法等均可作為今後箱梁架設及與箱梁架設相關的設計、施工工作的參考。
  3. In 2004, the company s technology development department has actively and successfully developed the shield - type american - style european - style cable heads, high - low - voltage cable branch cases for load switch busbar coupler system, outdoor ring network cabinets, box - type transformer substations and auxiliary products, which have passed the authentication one after another and been launched into the market in large batches, giving a strong support to the upgrading of the national urban power grids and the construction of key projects ; in 2006, the company has developed the four - splitting and dual - splitting wire and cable box and released to market ; the 2nd half of 2006, over 500kv ultra - high voltage electrical hardware being developed for 2007 market ; four products awarded national patents in 2006

    2004年公司技術開發部積極開發了屏蔽型美式歐式電纜接頭,負荷開關母線聯接系統的高低壓電纜分接箱,戶外環網櫃,箱式變電站及配套產品相繼通過鑒定,大批量投入市場,有力支持國家城網改造與重大工程建設2006年公司又研製出四分流二分流電線電纜分線盒,已投放市場2006年下半年,正在研製開發超高壓500kv及以上電力金具,有望2007年投放市場2006年有六種產品已申請國家專利。
  4. Control of bridge floor in cantilever casting construction of t - type continuous rigid - frame box - beam

    形連續剛構箱梁懸澆施工橋面高程的控制
  5. Abstract : the shaft well of the xiezhuang coal mine has been designed of a poured - in - place reinfcrced concret box structure. sliding and pouring method, an alternate procedure for the construction of a coal mine shaft well project, the procedures are as following : 1, the progress of each storey " s construction has been carried out step by step duly 2, the construction of slabs and 3, during construction, the light - type network structure has been used as a complementary operating platform for the sliding formwork construction. these synchronization procedures have achieved comprehensive economic benefit and social efficiency

    文摘:協莊礦副立井井塔為現澆鋼筋混凝土箱形結構,採用滑一澆一工藝進行煤礦井塔施工,施工順序為塔壁逐層滑升,梁板逐層跟進,施工中利用井塔屋面輕型網架結構作為滑模輔助操作平臺,同步滑升,取得了較好的綜合經濟效益和社會效益。
  6. The shaft well of the xiezhuang coal mine has been designed of a poured - in - place reinfcrced concret box structure. sliding and pouring method, an alternate procedure for the construction of a coal mine shaft well project, the procedures are as following : 1, the progress of each storeys construction has been carried out step by step duly 2, the construction of slabs and 3, during construction, the light - type network structure has been used as a complementary operating platform for the sliding formwork construction. these synchronization procedures have achieved comprehensive economic benefit and social efficiency

    協莊礦副立井井塔為現澆鋼筋混凝土箱形結構,採用滑一澆一工藝進行煤礦井塔施工,施工順序為塔壁逐層滑升,梁板逐層跟進,施工中利用井塔屋面輕型網架結構作為滑模輔助操作平臺,同步滑升,取得了較好的綜合經濟效益和社會效益。
  7. Construction method of the box - type structure jacking under the existing railway line

    既有線下頂進箱涵的施工方法