bridge construction practice 中文意思是什麼

bridge construction practice 解釋
橋梁施工技術
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  • practice : n 1 實行,實踐,實施;實際;實用;做法,技術。2 習慣,慣例,常規。3 練習,演習,實習,實驗;老練...
  1. Combined with the engineering practice, the author puts forward the synthetical prevention and cure technique, construction technology and controlling quality measurement, and discusses preventing and curing the jump disease in the bridge abutment of the highway

    結合工程實際,提出了高速公路橋頭跳車病害綜合防治技術、施工工藝及質量控制手段,為今後防治高速公路橋頭跳車病害進行了有益的探討。
  2. This article comtined the practice of the projtct of jiaojiang bridge and analyzed strand wire with high strength and low laxation, the anchorage system, the tentioned technice in the construction, and the principle of anchorage

    摘要本文結合椒江大橋工程實踐,分析了國產高強度低鬆弛鋼絞線和預應力錨固體系,在施工中的張拉工藝、錨固原理。
  3. Based on project example, the article presents the construction stress computation process of hydraulic creep form in the construction of high bridge pier, the construction stress analysis has applied successfully in the project practice and can be referred in the similar special structure construction

    本文基於工程實例,給出了橋梁高墩身施工選用液壓自爬模完整的施工受力計算過程,且已成功地應用於工程實踐,可供類似特種結構施工參考。
  4. In combination with the construction practice of abutment no. 2 great bridge and no. 1 medium - scaled bridge, the paper introduces the construction technology of rock - socketed piles in highway engineering

    摘要通過邊墩2號大橋和羊山1號中橋的施工實踐,介紹嵌巖樁在公路工程中的施工工藝。
  5. This paper introduces the development and present situation of concrete - filled steel tube arch bridge in the world ; generally analysis the mechanism, construction technology, construction equipment of the job practice ; advance the entire scheme of the long - span concrete - filled steel tube arch rib construction ; at last give the analysis the concrete scheme of the concrete - filled arch rib construction. this paper declares the reference value of the study through the above

    本文介紹了國內外大跨度鋼管混凝土拱橋主拱肋施工的發展和現狀;綜合分析了拱橋施工的機理、技術和設備情況;提出了大跨度拱橋主拱肋施工的完整解決方案,最後通過具體橋梁施工方案的設計分析,說明了本項研究成果的現實參考價值。
  6. Abstract : based on great amount of structural steel spliced joint model experiments, related calculation formula have been derived and verified with theory and practice. the conclusions from the experiments will be useful for design and construction of prespliced joint for bridge structures

    文摘:通過大量結構鋼拼接接頭模型試驗,得出不同狀態下的實驗結果,並據此推導出相關計算公式,從理論和實踐中進一步驗證其可行性,所得結論對預制拼接梁橋結構施工和設計有指導作用。
  7. Then, a thorough discussion and sum ? p about the main construction process of cfst tied ? rch bridge without wind bracing is presented in the paper in association with the construction practice of the bridge. in addition, the author put emphasis on the static calculation of two point integral hoisting construction method in single cfst arch rib. futhermore, the stabilization of arch rib in construction and service stage are analyzed detailedly

    本文結合該大橋的施工實踐,對無風撐鋼管混凝土系桿拱橋的主要工藝施工流程進行了全面論述和總結,並重點對單片鋼管拱肋兩點整體吊裝的結構受力進行了靜力計算及對拱肋在施工和運營階段的穩定進行了分析。
  8. Abstract : combining the engineering practice of xiayingzi railway frame overpass in huainan, the paper describes the details of the technical characteristics and construction technology of long span skew frame bridge

    文摘:結合淮南夏郢孜框架式鐵路立交橋的工程實踐,對大跨度斜交框架施工技術特點及施工工藝進行了較詳細的總結。
  9. The paper, in the light of my bureau ' s construction experience and project practice in constructing large span prestressed continuous beam bridge ( continuous rigid frame ) in recent dozens of years, introduces a new thinking about the standardized design of cable - stayed hanging basket and the standardized construction technology of the continuous beam bridge ( continuous rigid frame ), gives the detailed account of a series of construction technique and achievements such as : the development and construction ways of large span continuous beam bridge, the standardized design thinking and operation of cable - stayed hanging basket, the standardized construction technology of the continuous beam bridge ( continuous rigid frame ) etc., meanwhile, it is attached with a whole set of detailed standardized design sample drawings of cable - stayed hanging basket

    本文根據我局十幾年來修建大跨度預應力連續梁(連續剛構)橋的施工經驗和工程實例,介紹了一種斜拉式掛籃標準化設計的新思路及連續梁(連續剛構)橋標準化施工工藝。詳細敘述了大跨度連續梁橋的發展、施工方法、斜拉式掛籃標準化設計思路及做法、連續梁(連續剛構)橋標準化施工工藝等一系列施工技術及成果,並附有全套詳細的斜拉式掛藍標準化設計定型圖。對同類型橋梁的施工及掛籃設計具有參考價值。
  10. Concrete filled steel tube ( cfst ) arch bridge is a new type of bridge which is widely applied in china recently, and it is a relatively ideal structural form for long span arch bridge. with the background of the practice of liantuo bridge, in the view of point of feasible in technology and reasonable in economy, the key techniques and difficulties in the construction of cfst arch bridge are analyzed and discussed in the thesis. the disadvantages in the current design and construction and the improvement method are also indicated

    本文以蓮沱特大橋工程實踐為背景,以主拱施工研究為主線,對鋼管混凝土拱橋重難點施工工藝,從技術上可行、經濟上合理的角度出發,詳細的進行了分析闡述,並指出了設計施工中存在的不足和今後需改進的方向;通過對鋼管混凝土拱橋施工過程中內力的計算,確定了拱肋施工最不利荷載工況下加載重量、壓重順序和張拉臨時預應力束等一系列施工措施,並將計算結果與現場監測觀測數據進行了比較分析,為今後進一步研究這類結構提供了參考。
  11. Based on the construction practice of steel cofferdam for pier base of main pier no. 6 close to the pylon of sutong bridge, the key techniques for design and construction of the deep water double - wall steel cofferdams of the bridge are described

    摘要以蘇通大橋近塔墩主6號承臺鋼圍堰工程實踐為基礎,介紹該橋深水雙壁鋼圍堰設計、施工的關鍵技術。
  12. With reference to the construction practice of precast concrete box girders of donghai bridge, this paper analyzes the causes of formation of cracks in the box girders at construction site, and also provides the relevant control measures and successful experiences for preventing the cracks from occurring

    摘要結合東海大橋預制箱梁的工程實踐,分析施工現場箱梁裂縫產生的原因,介紹防裂的控制措施以及取得的成功經驗。
  13. Then, this paper presents a program, which is used to analyze the construction control of modong hongshuihe arch bridge. the calculated values coincide with the measured data and closely agree with the results obtained by other references. it was thus confirmed that the stress balance d method is effective and reliable in practice

    同時依據應力平衡法的思想,編制了用於懸臂拼裝拱橋施工控制的程序,採用該程序對廣西來賓磨東紅水河大橋進行了施工控制分析計算,經與監測數據及課題組研究成果相比較,結果表明,應力平衡法是合理與有效的。
  14. To better achieve success bridge success purposes, and to provide one - stop - style fast quality service, sir bridge have established that the smart bo expertise while rich experience in the practice of high - level personnel, including accountants, lawyers, senior management consultants, business secretary, and construction enterprises, taxation and market promotion and other personnel

    為了更好地實現凱橋的服務宗旨,並為客戶提供一條式的快速優質服務,凱橋建立了即具備精博專業知識同時又擁有豐富執業經驗的高層次人才隊伍,包括會計師律師高級管理顧問商務秘書,以及企業構造稅務安排和市場推介等各方面人才。
  15. The concrete outward appearance quality is the concrete quality manifested intuitively, in view of outward appearance quality question of current bridge foot stall construction, coupled with construction practice, construction technology of steel template paste with water percolation cloth in bridge foot stall construction was proposed

    摘要混凝土的外觀質量是混凝土質量的直觀體現,針對當前橋梁墩柱施工中的外觀質量問題,結合施工實踐,提出了橋梁墩柱施工中鋼模板貼透水布施工技術。
  16. The cast - in - place pile has become the major foundation form to road and bridge construction for the feasible practice of various geological structure, load bearing and strong resistance to earthquake

    鉆孔灌注樁基礎能適應于不同地質條件、荷載情況,抗震能力強,因此成為了公路橋梁的主要基礎形式。
  17. In the fourth chapter, study on the structural system and cracking - resistant in bulky concrete of the anchor, combined with the designing and building practice of the anchor in yichang yangtse river highway bridge, a optimized gravitational concrete anchor and a systemic measures for the cracking - resistant for the construction of the bulky concrete in the anchor have been developed and adopted in the bridge efficiently which demonstrates the anchor type and the measures are feasible and practical

    在第4章?懸索橋錨碇合理結構型式及綜合防裂技術研究中,結合宜昌長江公路大橋設計與施工的具體實踐,介紹了宜昌長江公路大橋錨碇結構的合理選取,特別是介紹了宜昌長江公路大橋錨碇大體積混凝土的設計與施工中所採取的綜合防裂措施。
  18. Abstract : through the practice of vertical pressers in long sp an continuous box - girder and the research of two - way prestress model test, the construction technology about unbonded vertical prestress is proposed and applie d in hanjiang bridge in hanchuan. for the first time, it ? s first adopted in long span concrete bridge in our country and a lot of economic benefits are created b ecause of its advantages such as little drill way, rapid and imple construction, h igh quality and so on

    文摘:通過漢川漢江公路大橋大跨徑連續箱梁豎向預應力施工實踐和雙向預應力模型梁試驗研究,在該橋施工中提出並應用了無粘結豎向預應力技術.這在國內大跨徑砼橋樑上尚屬首次全面採用,它具有孔道直徑小,施工簡便快速,質量易於保證等優點,為全橋預應力施工創造了較為顯著的社會經濟效益
  19. The construction practice indicates that the design of the cofferdam for the bridge is rational, can meet the construction requirements and is of certain reference to the construction of similar elevated pile caps

    工程實踐表明,該鋼吊箱設計合理,能滿足工程的需要,對同類承臺施工有一定的借鑒意義。
分享友人