bridge evaluation system 中文意思是什麼

bridge evaluation system 解釋
橋梁評價系統
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  • evaluation : n. 1. 估價,評價。2. 【數學】賦值,值的計算。
  • system : n 1 體系,系統;分類法;組織;設備,裝置。2 方式;方法;作業方法。3 制度;主義。4 次序,規律。5 ...
  1. Theory analysis and practical project prove that the method of the reinforced concrete beam system bridge structure disease examination and structure damage evaluation is reasonable and viable

    理論分析與工程實例,都證明了本文的梁橋結構損傷識別及其評價方法體系的合理性與可行性;
  2. The basic theory and step of whole process analysis of reinforced concrete beam section flexural rigidity is stated, the realization program is worked out and the academic example is analyzed. 4. based on the static - state load test result of two practical projects, the application of the reinforced concrete beam system bridge structure disease examination and structure damage evaluation method is stated, and satisfaction result is gained

    1 、綜述了當前混凝土橋梁結構檢測及損傷識別的各種方法體系,並簡要評價了各方法體系的應用與不足; 2 、論述了基於靜載試驗的梁分段剛度系統識別的基本原理,編制了實現程序,並進行了數值算例分析,提出基於本原理的梁橋結構損傷識別與結構評價方法體系; 3 、闡述了鋼筋混凝土梁截面抗彎剛度全過程分析的基本原理和方法步驟,編制了實現程序,並進行了相關算例分析; 4 、結合兩片工程實例梁的靜載試驗,詳述了梁橋結構損傷識別與結構評價方法的應用過程,得到了預期的效果。
  3. Considered the present condition of liaoning province, the evaluation and prediction method of liaoning province bridge technique condition is analyzed, then bridge condition changed - contingency evaluated method is introduced, negative index curve is chosen as the regression analysis model of the bridge condition prediction, and based on the information of bridge management system in the liaoning highway, the parameters of model are calibrated, the average repaired life of bridge is also calculated, the definite method of the bridge ' s repaired year is given, at the same time the markov chain model of bridge condition prediction is presented

    結合遼寧省的橋梁工程及管理具體情況,研究了遼寧省橋梁技術狀況評價與預測方法,引入橋梁缺損狀況變權評定方法,選擇負指數曲線作為橋梁缺損狀況預測的回歸分析模型,並依據遼寧省干線公路橋梁管理系統中的橋梁狀況信息,標定了模型的參數,計算橋梁中修及大修(或改建)的平均年限,給出橋梁大中修年份的確定方法,同時也建立了橋梁缺損狀況預測的馬爾可夫鏈概率模型。
  4. Bridge technique condition evaluation and prediction are the two aspects among the bridge management system. the research work has established the theoretical foundation for developing comprehensive bridge management system suited to chinese bridge management sectors

    橋梁技術狀況評價與預測僅是橋梁管理系統的二個方面,本文的研究為建立完整、科學且適合我國國情的橋梁管理系統奠定了理論基礎,也為橋梁管理系統的研究、開發提供了有益的經驗。
  5. Gereral accounts of bridge measurement and evaluation system

    橋梁檢測與評價系統概述
  6. Calculation methods of reliability index corresponding to time of bridge structural member under a single destroy mode is given. based on the conventional reliability theory, component is treated as a system, multi - destroy - mode would appear in identical section is taken into account ; calculation method of evaluation index that is used for member and the whole system is put forward

    根據動態可靠性理論,給出已有橋梁結構構件在單一破壞模式下任意時點的可靠度計算方法,並在傳統結構可靠性理論的基礎上,將構件作為結構體系,考慮其某一截面可能出現的多種破壞模式,提出構件評定指標的計算方法,進而給出橋梁結構體系綜合評定指標的計算方法。
  7. Two - way arch bridges have big weight in existing bridges in our country, they have large quantity & locate all over the country. for some reasons, they behave aging & diseases. for the purses of assuring transportation safety, highway salibility, having the existing bridges to be used sufficiently & using the maintain money properly, it is necessary to do proper reliability evaluation for two - way arch bridges. consultes on the base of large quantity of domestic & foreign literature, this thesis uses engineering survy & others " evaluation experience & advances factors analysis & system synthesis method for two - way arch bridge. this method overcomes the shortcomings & abuses that the used methods have. it has high veracity, strong adaptability & good maneuverability

    為了保證公路暢通、行車安全,充分發揮現役橋梁的作用,合理使用橋梁的維修加固費用,需對雙曲拱橋的可靠性做出恰當的評估。本文在大量參考國內外文獻的基礎上,結合工程調查和前人評估經驗,提出了雙曲拱橋可靠性評估的因素分析和系統綜合法,克服了過去各種方法的不足和弊端。該方法準確性高、適應性強、可操作性好。
  8. Secondly, rules to set indicators - system and the indicators - system are built according to the characteristics of highway and bridge project post - evaluation. an grey comprehensive cluster post - evaluation algorithm is built with the help of grey cluster evaluation, methodology of with and without comparison, ahp etc. dates of evaluating objects are computed through contrasts value and threshold value. the steps of grey comprehensive cluster post - evaluation algorithm are given

    其次,根據路橋投資項目后評價的特徵,指出路橋投項目綜合后評價指標體系設置原則,並設立綜合后評價指標體系;結合灰色聚類評估方法、對比法、層次分析法、專家調查法等建立灰色綜合聚類后評價模型的演算法,通過建立的對比值、前後變化閾值實現對指標數據的獲取,進而提出了論文所建立的灰色綜合聚類后評價模型的演算法和步驟。
  9. Asia - bridge software enterprise has to study and solve the problem at present. the essay focuses on the asia - bridge software staff floating and analyzing relevant reasons by questionnaire and interviewing face to face. the main reasons for brain drain in asia - bridge enterprise are unreasonable salary and wages system ; lack of fairness ; improper welfare system ; no chance for staff training and no efficient evaluation program etc. the article has demonstrated some new ideas and thoughts to solve those problems based on the analysis and accepted some advanced and typical experiences in home and aboard, such as individual salary and wages system ; self - service welfare plan and completed training system and form asia - bridge enterprise culture in order to solve the erosion of the qualified people in asia - bridge software enterprise

    本文首先對人員流動及其相關理論進行了研究;採取定性和定量分析相結合的方式,對亞橋軟體人員流失的現狀進行了充分分析;基於對亞橋軟體人員配置現狀與人員特徵的充分把握,以比較研究、調查問卷及面談法為主要手段,找出了造成亞橋軟體人員流失的主要原因,重點包括:薪資制度結構不合理、激勵性不強,福利制度適應性差、福利項目對于員工需求的針對性不強,員工培訓缺乏充分的培訓需求分析做基礎、培訓方式方法過分單一,不能科學合理的確定所需求人員的數量及關鍵素質,企業文化有待完善等等;本文以前述理論為指導,充分借鑒了國內外先進典型企業相關經驗,結合亞橋軟體自身問題與特點,制訂了諸如建立個性化薪資制度、推行自助餐式福利計劃、完善培訓體系及改進人員需求確定、培育適合的企業文化等對策,以解決亞橋軟體人員流失問題;本文還就解決亞橋軟體人員流失問題的配套措施進行了探索。
分享友人