bridge method 中文意思是什麼

bridge method 解釋
電橋法
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  • method : n 1 方法,方式;順序。2 (思想、言談上的)條理,規律,秩序。3 【生物學】分類法。4 〈M 〉【戲劇】...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. The paper is based on an arcuated built - up system bridge - zhongshan no. one bridge to be built in guangzhou, adopts the large universal finite element programme ansys, takes spatial action among members into account, establishes a three - dimension finite element model, and discusses the following several aspects : firstly, when three - dimensional finite model of a complicated bridge is founded, a beam - lattice method is a kind of applied and effective spatial analysis method, which is used to analyze superstructures of a bridge

    本文以廣州市中山一橋為背景,採用大型通用有限元程序ansys ,考慮構件間的空間相互作用,建立了三維的有限元模型,重點對以下幾個方面進行深入探討:首先,在對復雜的橋梁結構進行三維的有限元模型建立時,梁格法是分析橋樑上部結構比較實用而且有效的空間分析方法。
  3. Using the method of simulation calculation and compare, we choice the structure of y - branch balance bridge interference switch

    經過模擬分析和比較,選擇y分叉平衡橋路干涉型光開關結構。
  4. Abstract : based on the concept of being serviceable at both peacetime andwartime and existing research achievements, the paper puts forward general programme, mechanical model and computational method for the railway bateau bridge across yangtze river, which can meet the navigation requirements, obtain high degree of attack - resistance and be extensively used

    文摘:基於平戰結合的思想,立足於現有的成果,提出了能滿足長江通航要求,具備良好的抗打擊性和可以廣泛應用的長江鐵路浮橋總體方案、力學模型和計算方法。
  5. Theory analysis and practical project prove that the method of the reinforced concrete beam system bridge structure disease examination and structure damage evaluation is reasonable and viable

    理論分析與工程實例,都證明了本文的梁橋結構損傷識別及其評價方法體系的合理性與可行性;
  6. The calculation modes of the coefficient of shrinkage and creep of the bulgy core concrete in steel tube are discussed. based on a few reasonable hypotheses and the stress - strain relation of concrete acquired by the " adjusting valid modulus depending on load time " method, a compact formula is reasoned out, which is applied to calculate the equivalent elastic modulus of the bulgy core concrete considering the affection of shrinkage and creep. so, the analysis of the affection on cfst arch bridge by shrinkage and creep can be progressed by pole - girder fem, further more, the analysis precision is quite high

    本文還對核心膨脹混凝土特殊的收縮、徐變系數計算模式展開了探討,在合理的假設前提下,採用「齡期調整的有效模量法」得到的混凝土的本構關系,推導出鋼管內核心混凝土在考慮徐變影響后的等效彈性模量計算公式,並以此為基礎採用桿系有限元方法來對鋼管混凝土拱橋進行較高精度的收縮徐變分析。
  7. Based on basic principles of grillage method, an improved grillage model of wide cantilevers bridge deck is brought forth and its effectiveness is verified after generalizing rules of grillage meshing and sectional characteristic

    基於梁格法的基本原理,提出了寬翼緣上部結構分析的改進梁格模型,並總結了梁格單元劃分和截面特性計算的一般方法,最後通過算例驗證了該模型和方法的有效性。
  8. Under the background of a long - span rigid - framed flexible cfst arch bridge, the catholicity method to compute the ultimate capacity is brought forward

    以某大跨度剛性梁柔性鋼管硅拱橋為例,總結了具有較普遍意義的大跨度橋梁極限承載力計算方法。
  9. 3. as to vehicle - bridge system coupling vibration, this difficulty in engineering industry, it was abstractly summarized in this thesis, and introduce a method to establish and resolve equations about such coupling vibration, bring forward a flow chart to write correlative software ; with the help of ansys, make out some work about preparatory simulation, so as to research basic point of chicle - bridge system coupling vibration

    3 、對車橋耦合振動這一業內的難點進行了理論上的分析,引入了一種建立和求解車橋耦合振動系統方程的較為典型的方法,提出了一份自行編製程序的流程簡圖;借用ansys軟體對該橋做了車橋耦合振動的初步模擬計算,探索車橋共振的基本特點。
  10. Erection of segmental bridge decks by ground support method cpr - 2

    運用施工架興建中的高架橋
  11. So this article analyses deeply in the method of ensur ' my designing food rolume which is an important element to affect the " designimy height of bridge " it brings forward an " arverage optiminmy suiting line " method which is a bondage discommode series at the same time it puts forward a ensurmy principle for rough coefficient " and " fallimy flood proportion which are both suitable to heilongjiang province at last this article introduces the " three - days rainimy rolume " method

    本文立足於黑龍江省各種河流的洪水特點,結合以往工程實際,對影響跨河橋梁設計高度的主要因素? ?設計洪水流量及其相應洪水位的確定方法加以詳細分析。提出有約束不連序系列的加權優化適線法及適合於黑龍江省的河流粗糙系數和洪水比降的確定原則,並介紹了三日降雨量法。
  12. The classical frequency - domain theory forms a basis of bridge vibration analysis, however such method has some limitations. some literatures show that the time - domain analysis method has advantages for vibration analysis. because of the research on time - domain vibration analysis developed only in recent years and the theory is n ' t perfect enough, it needs to be made further investigation

    經典的簡化靜力法存在一定的局限性;反應譜法為中、小跨橋梁的抗震設計提供了廣泛的應用,但對解決大跨度橋梁的線性與非線性問題存在明顯不足;時程分析法由於該領域的研究起步較晚,目前的理論和方法還不甚成熟,有待于進一步深入研究。
  13. The research information of the slab that has been used for forepassed decades is extremely few. there is a lack of the method of calculating load bearing capacity of slab with slightly curved bottom in our bridge criterion

    在過去的幾十年中,微彎板的研究資料極少,我國橋梁規范中尚無微彎板的承載力的確定方法。
  14. Abstract : based on the principle of mininmum potential and using rayleigh - ritz method, the geometric non - linear analysis of higher bridge piers was solved in this paper. the new concept of equivalent horizontal force proposed by the author may be casily to calculate the second effect, which was produced due to the vertical forces and resisted by the piers and rubber pad bearings incorporately. the simple formula in this paper are applicable to calculate by hand, understood clearly without computation of successive iteration, higher precision and graspable easily for the disigmer therefore it has the practical significance

    文摘:根據最小勢能原理,用瑞雷-里茲法解決了高橋墩的幾何非線性分析問題;其次,提出了等效水平力的新概念,可以方便地解決橋墩和板式橡膠支座聯合抵抗垂直力所產生的二次效應問題.筆者提出適合於手算的簡便計算公式,概念明確,勿須迭代運算,精度較高,易為設計人員掌握,因此具有實用價值
  15. In the paper, the study of analysis method of internal force for curved - beam bridge structure analyzed by spacial method of curved - bar grillage finite element method is introduced

    本文對彎梁橋採用曲桿梁格有限元法進行空間結構分析時的內力計算方法進行了研究。
  16. Abstract : the mechanical analysis for arch bridge with flat hinge joints is a mechanical problem with non - linear boundary. mechanical analysis of methods at present is not clear, which can not calculate the arch bridge with changeable section and section with complicate shape. in this paper, the new method used to get the section resistance coefficient k is presented, the iterative procedure is established to calculate the internal forces of arch bridge with flat hinge joints, and the computational example is given. the method can apply to the arch bridge with any numbers of flat hinge joints and any shape section

    文摘:平鉸拱橋結構的受力分析屬于邊界非線性力學問題,目前的一些方法受力分析不太明確,對變截面、復雜形狀截面等平鉸拱橋無法進行計算.針對這種情況,提出了確定平鉸截面抗力系數k的新方法,建立了計算平鉸拱橋內力的迭代演算法,並進行了實例計算,研究結果表明,這一方法對具有任意個平鉸、任意形狀截面的拱橋結構是適用的
  17. Measuring contract resistance with double electric bridge method

    雙電橋測收縮電阻
  18. Test methods for communication cable - capacitance test - bridge method

    通信電纜試驗方法工作電容試驗電橋法
  19. It will effect the system in safety and running economy directly > test of tradition past the method is an usage to give or get an electric shock the bridge method or direct current to press to decline the method to proceed to measure, and the electric current for producing of is only in the ma class which ca n ' t broke through the oxidize surface

    高壓斷路器是電力系統中最重要的控制和保護設備之一,它對系統的安全、經濟運行有著直接的影響。以前傳統的測試方法是使用電橋法或直流壓降法進行測量,所產生的電流僅在ma級,不能擊穿觸頭氧化膜。
  20. ( 2 ) the basic extension methods such as extension transformations and transforming bridge method are applied to tackle conflicts, which is a new method to tackle conflict. the dissertation is sub - project " research on conjugate analysis of enterprise resource and extension resource " ( no

    ( 2 )將可拓學中的基本方法如可拓變換方法、轉換橋方法等應用到沖突問題的處理過程中,嘗試了一種新的解決沖突問題的方法。
分享友人