bridge rope 中文意思是什麼

bridge rope 解釋
橋纜
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  • rope : n 1 (通常指1 10英寸以上粗細的)索子,麻索 〈cf cable; cord〉。2 繩〈長度名=20英尺〉。3 套索;測...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. The drills included rescue rubber dinghies moving in formation, a vertical landing by a rescue helicopter, evacuation of victims by amphibious vehicles, saving people in rapid water through the use of rubber dinghies, vertical evacuation of victims, use of a rope - gun, setting up a rope - bridge over a valley or stream, vertical descent from great heights, and a display of advanced earthquake rescue equipment

    演習的項目包括救生橡皮艇水上分列式直升機垂降救援水陸兩用車撤離災民橡皮艇急流水中救援垂直地形傷患拖吊拋繩槍救援溪谷單索吊橋架設高空垂降,及多項先進的地震救援裝配靜態展示。
  3. Until recently, the village could only be reached by a rope ferry across the creek, pulled by old ladies. now there s a tiny bridge, but little else has changed in over a century. the village, sometimes referred to as a chinese venice, is a jumble of wooden houses balancing on stilts over slow - flowing streams and mud - flats

    以往,遊人要到村內,得乘坐一艘由村婦用繩索拉著前行的小艇,才可渡過小河到達彼岸的大澳村,今天,小河上已蓋建了拱橋,出入比以往方便得多,但除此之外,大澳村的面貌依然如昔,那些用竹竿架起在小溪上的棚屋,仍然是村民的住所,而一排一排的棚屋倒影在小河上,令這條遠離塵囂的村莊,添上了幾分東方威尼斯的色彩。
  4. Analysis on fracture of steel skein used for wire rope of bridge tie bar

    橋梁系桿鋼索中鋼絞線斷裂情況剖析
  5. Prospect dtzziii series weight - load controller sensor part adopt bridge - type strain piece sensor, and applies steady installation technology to insure sensors running steady and long - range. we provide multi - kinds of sensor installation method. sensor can be installed under the car bottom, on elevator rope hitch plate, on car top wheel and axle and car top beam to work together with controller

    前景dtzziii系列稱重控制儀的稱重傳感器部分採用橋式應變片傳感器,應用平穩安裝技術確保長期穩定運行稱重傳感器提供多種安裝方式,可以安裝于活轎底電梯的轎廂轎底電梯繩頭板處電梯轎頂輪軸處電梯轎頂橫樑上面等,與控制儀配合使用。
  6. In this paper, the construction techniques of linjiangmen cable - stayed bridge in jilin, such as large sinking well technique of pier, climbing form panel technique of main tower, stay rope formwork traveler technique of girder and construction control, are summarized in details

    本文全面總結了吉林臨江門斜拉橋施工技術,詳細敘述了主墩大型沉井施工技術,主塔爬模施工技術,主梁牽索式掛籃施工新技術。斜拉索施工及施工控制等。
  7. Further more, with the reference of testing information, the paper analyzed the traveler construction technique, obtained the guy rope stress and the front - end bottom mark of traveler for each step. using fem theory and large general - purpose program ansys, the paper discussed the cable - stayed bridge space stress characteristic and the relationship between several main design parameters

    以此為基礎,參照試驗資料,詳細分析了斜拉橋施工中掛籃的施工工藝,及其各個狀態下的受力情況,得出在各個階段掛籃牽索的索力值及掛籃前端各個工況的主梁底立模標高。
  8. Next came a heavier cord, then a rope and finally a wire cable composed of a number of strands of number ten wire which was the beginning of the new bridge

    那道橋建成了,就由一根風箏線開始從一根小小的風箏線,不可能的變為可能。
  9. In this article the prestessed loss in the prestressed concrete structure will completely be analyzed in the theory. combining with the fourth - hanjiang bridge of xiang - shi freeway in hubei province, the prestressed friction loss of the prestressed steel rope is analyzed ideally and researched experimentally

    本文從理論上對預應力混凝土結構預應力損失做了全面地分析,結合襄樊漢江四橋建設工程,對橋梁預應力鋼索的預應力摩阻損失進行了理論分析和試驗研究。
  10. Type nhss wire rope pulling hoist is widely suitable for use in bridge - construction, laying of large - size pipes, installation and adjusting of machinery an electric apparatus, and large reaction tower of petrochemical industry ; the installation and alignment of storage tanks ; erecting, fitting, welding and alignment of masts, steel concrete timber structures ; laying and translocating of rails and sleepers ; loading and unloading bulky heavy goods during transportation. cable tensioning ; demolishing of gallery supporting logs ; stacking forrestry wood ; and othersimilar cases. the hoist of this series is especially suitable for use in narrow working sites of limited space, where the job is high above the ground or in open air places, in tunnel of deep well, where no power for traction or lifting is available

    Nhss型鋼絲繩手扳葫蘆可廣泛用於建築施工、大型管道鋪設、機電設備和石油化工大型反應塔、儲罐的安裝、校準、鐵塔及其它鋼木結構的豎立、拼裝焊接、校準、鐵軌、枕木的鋪設、移位、交通運輸中笨重貨物的裝卸、電線張緊、坑道支撐木的拆除、林區木材的集放等等,對于局部空間受到限制的狹窄工作場所、高空作業、野外作業、坑道、深井作業和無機電供能場所的各種牽引、提升作業、選用本系列產品尤為適宜。
  11. On the base of it, convert the wire rope lma signal to corresponding electricity signal according to the theory of magnetic bridge

    在此基礎上,運用磁橋路原理,把鋼絲繩的金屬截面積損失信號轉化為相應的電信號。
  12. According to the reality of engineering, the article makes a deep study of the electricity - magnetism detection of the loss of metallic cross - sectional area of wire rope, brings forward a designing method of lma detecting sensor based on the theory of magnetic bridge, develops out a data collecting and dealing system that is assorted to it, and accomplishes all the designing and confecting work of the hardware and software of the system

    金屬截面積損失是一種較常見且非常重要的鋼絲繩缺陷,本論文結合工程實際,對鋼絲繩金屬截面積損失信號的電磁法定量檢測作了深入的研究。提出了一種基於磁橋路原理的鋼絲繩金屬截面積檢測傳感器的設計方法,研製出與之相配套的數據採集與處理的cpu系統,完成了系統各部分軟硬體的開發與調試工作。
  13. A cable rope system is applied to hoist the arch bridge that is a suspending system before the girders are joined

    鋼管混凝土拱橋採用纜索吊裝系統吊裝,在拱肋完全合攏之前,是一個懸浮體系。
  14. As yahko tried to escape across the rope bridge,

    當亞克試著跨過吊橋逃離
  15. At first, the soft of bridge structure, gqjs, is used to calculate the structure of prestressed concrete continuous beam bridge and the deformation and stress of the concrete box beam are given out ; then by measuring and analyzing the datum of the stress in the prestressed steel rope and the stress of section in the concrete box beam, this article presents two ways to identify the reasonable friction deviation factor k between longitudinal prestressed tendons and the wall of duct ( indirectly and directly ), and discover the regular pattern of prestressed friction loss

    首先運用橋梁結構分析專用軟體gqjs對預應力混凝土連續梁橋進行結構計算,得到了各施工工況下混凝土箱梁的撓度和截面應力;然後給出了識別引起結構預應力損失的孔道偏差系數k的兩種方法(間接法和直接法) 。通過對測得的預應力索沿程應力和混凝土箱梁截面應力數據的分析處理,得到了合理的預應力孔道摩擦偏差系數及預應力摩阻損失規律。
分享友人