budgetary estimate 中文意思是什麼

budgetary estimate 解釋
經費概算
  • budgetary : 計劃中規定的
  • estimate : vt 1 估計,估算;估價;估量。2 評價,評斷。3 〈古語〉尊重。vi 估計,估價。n 1 估計;預測;〈英國〉...
  1. In order to solve this contradiction, reservoir engineering methods are used to estimate the exploitation process about the block, which including water drive curve method, the correlation experience method, the method of the flow pipe budgetary estimate and the method of well net density. on the basis of these method, the author studied the macrocospical distributing of remaining oil in each layer

    針對單元開發過程中存在的突出矛盾,運用水驅曲線法、相關經驗公式法、流管概演算法、合理井網密度法等油藏工程方法對斷塊的開發歷程進行評價,在此基礎上進行各小層剩餘油的宏觀研究。
  2. Budgetary estimate of unit construction

    單項工程概算
  3. At present, there are many problems, such as project " s actual outlay going beyond budgetary estimate, postpone, the strictness of taking charge of small etc, in the management of national defense scientific research of china

    目前,我國國防科研管理工作中存在著項目經費超概算、延期、監管力度小等問題,這些問題在一定程度上降低了國防科研投資的配置效率。
  4. But in the construction field in our country, there are many serious problems in cost management. for example, there exists the appearance of budgetary estimate exceeding the estimate, the budget exceeding budgetary estimate, and the final accounts exceeding the budget

    但在我國的建設領域卻普遍存在著嚴重的成本問題:概算超估算、預算超概算、決算超預算的「三超」現象比比皆是,而「釣魚工程」和「爛尾樓」工程又是屢見不鮮的。
  5. Based on the practical experience of the second stage projects for geohazards in the region, the authors study some details of engineering budgetary estimate, want to avoid the lacking items to narrow difference between the practical expenditure and budgetary estimate

    在總結三峽庫區二期地質災害勘查治理實際經驗的基礎上,對工程概(預)算中的若干細節問題進行了研究,以期盡量避免概(預)算中的缺、漏項,縮小工程結算成本與概(預)算成本之間的差距。
  6. The function of the software is useful, it has provided many functions such as the calculate of crop water requirement, pipeline layout ( automatic layout and manual operation ) and its optimization, pipe diameter optimization. investment budgetary estimate and economic beneficial result can be result. and can rapid create plan and do plan comparison, the software provides many kinds of result output such as graph. text, table and so on

    該系統可以實行作物需水量計算,系統設計流量推算、管道水力計算、工程投資概算,經濟效益分析等功能,建立了常用的數據庫(管材、管件、水泵和電機等)並對其進行管理和維護,可以實現包括管道布置、管徑優化、管材選擇等多種參數選擇在內的多種方案比較、優選。系統能提供圖形、文本、表格等多種形式的成果輸出,人機交互界面友好,操作方便。
  7. Problems in working up budgetary estimate for municipal engineering

    預算編制中應注意的一些問題
  8. The issue so - called “ thress excess ” ( i. e budgetary estimate in excess of reckon, budget in excess of budgetary estimate, settle accounts in excess of budget ) exists in many projects of campuses according to the investigation by myself

    根據本人調查,許多高校建設項目存在著概算超估算、預算超概算、結算超預算的「三超」問題。
  9. Having long been ergigedin the evaluation and feasibility study, engineering value consultation and also in construction engineering auditing, induding budgetary estimate, item budget and final accounts ), also engaged investment evaluation consultation. of engineering project

    工程咨詢中,從事工程項目評估,可行性研究,工程造價咨詢業務;專業咨詢中,從事建設工程審計(包括概、預、決算審計) ,投資項目評估等咨詢業務。
  10. Finally, by using this software, we designed a small residential sprinkler irrigation project. we got the result of the calculation and budgetary estimate conveniently

    最後應用該系統對一小型住宅微噴灌工程進行了規劃設計,很方便地獲得了該微噴灌系統的計算結果、概算表等。
  11. The prospect of account budgetary estimate system in china

    我國會計核算制度改革的展望
  12. Project item feasibility study, project budgetary estimate and construction budget, protendetr estimate for public bidding, construction cost check and appraisal, construction inspection, construction management and assets evaluation

    工程項目可行性研究,編制工程概,預算和招標標底,審核和鑒定工程造價,工程建設監理,工程項目施工管理和資產評估
分享友人