building settlement 中文意思是什麼

building settlement 解釋
建築物沉陷
  • building : n. 1. 建築物,房屋,大樓,大廈。2. 製造;營造,建築;組合,組裝;建築術。
  • settlement : n 1 解決。2 決定。3 鎮定;安定。4 固定;定著。5 澄清;沉澱;沉澱物;沉積物;【地質學;地理學】沉...
  1. Specialize in structural design and consultation of industrial and civil architecture, especially in the field of the building ' s settlement and cracking, the reliability in use and the aseismatic property, etc

    本人主要從事工業與民用建築的結構設計和咨詢,如建築物沉降、開裂、使用可靠性、抗震性能等。
  2. Experimental study on the mechanism of earthquake - induced differential settlement of building on liquescent subsoil by shaking table

    可液化地基上建築物不均勻震陷機制的振動臺試驗研究
  3. Pile - net composite foundation has some merit in building up the reinforcement of composite foundation simultaneous in vertical and horizontal directions, in enhancing the bearing capacity of foundation soil, and minishing the non - uniform settlement, especially controlling the phenomenon of vehicle dumpping on bridge head in the foundation treatment of transitional segments which is proved by practice

    摘要實踐證明,樁網復合地基同時具備豎向增強體復合地基與水平向增強體復合地基的加固優點,能很好地提高地基土體承載力,減小不均勻沉降,特別是橋頭過渡段地基處理中能有效控制「橋頭跳車」現象的產生。
  4. Application of the matlab - based rbf neural network in prediction of the building settlement

    神經網路在建築物沉降預測中的應用
  5. Prediction of building settlement based on gray system theory and its demonstrative analysis

    基於灰色系統理論的建築沉降預測方法及其實證分析
  6. The author fist discusses the securities settlement its definition and introduces the building origin of gsbs in developed countries

    本文在引入證券清算的同時,介紹了發達國家建立簿記系統的歷史由來。
  7. The building no. i was built in the royal european style and the international standard. the president suites. luxury suites, luxury standard rooms and vip meeting room, luxury banquet hall, tea bar, it " s an ideal place for vip traveler about 30. now the hotel can provide computer - controlled telephone, fax and credit - card settlement services. emeisan international travel service can provide travel services such as tichet, interpreter, and guide, while daxinan recreation certer welcomes you friendly and enthusiastically

    會館擁有森林溫泉池19個,室內溫泉池6個,恆溫游泳池桑拿浴室按摩室夜總會ktv禪茶中心健身房形體房棋牌室乒乓球室臺球室壁球室電子高爾夫球場羽毛球場網球場等,以及貫穿于森林中全長3000米的散步道。
  8. Research on the calculation of raft foundation settlement deformation of the high building

    高層建築筏形基礎沉降變形有限元計算
  9. This paper presents an example of construction project in which the settlement of shallow foundation and the settlement difference between the multi - storey building and the podium on loose fine soil and reduced with methods of treatment of soil, adjustment of founda - tion stiffness and control of time difference in construction

    本文結合工程實例討論了在鬆散細砂層天然地基上如何通過地基處理,調整基礎剛度,控制施工時差來達到減少淺基礎的沉降及多層主樓與單層裙房的沉降差的方法。
  10. The present land expropriation system has some problems during practice like compensation standard is not reasonable, people settlement method during land expropriation is simple and building and other things on land compensation can not reach accordance and also has a lot of authorization procedures

    現行征地制度在實踐中存在著征地補償標準制訂不合理、征地安置途徑單一、地面附著物賠償標準難于達成一致、征地審批制度繁瑣的問題。
  11. We should improve the efficiency of our study and further insist on the general method of integrating theory with practice, fully used the learned new theories, new knowledge, new skills put fully in use and try our best to improve our ability of solving problems and initiating with the theories, especially around the key point on building an opening, civilizing, developing shangrao, we should also combine the theoretical study with the emancipation of our mind, with the implementation of decisions of the municipal party committee and the city government, with the settlement of practical problems containing in the course of developing, with the reform of our subjective world, and then speed up the course of “ turning mind to matter ”, to turn our knowledge into productive force and initiative force

    我們要提高學習效果,必須進一步堅持理論聯系實際的好學風,把學到的新理論、新知識、新技能充分運用到工作中去,努力提高運用理論解決實際問題的能力和創新能力,尤其要圍繞建設開放、文明、發展的上饒這個主題,主動把學習理論與推進思想大解放相結合,與貫徹落實市委、市政府重大決策相結合,與解決發展中存在的實際問題相結合,與改造自己的主觀世界相結合,加快「精神變物質」的進程,使學習力轉化成生產力和創造力。
  12. This also is building the new management model of traffic finance and accounting and the foundation of content at the same time. at present, our country economy is being in the generation of phase in 21 beginning of the century, and the traffic cause also is in never existed before quick development particular period, and that the face government function changes and economical with the international meets the rail, and it is back especially to join wto, and whether traffic finance and accounting can work to suit the development requirement of traffic cause, various kind of finance and accounting problem in the creativeness settlement traffic cause development, further builds with the new finance and accounting management model of perfect traffic industry, is puts at the important subject in face of us. this thesis is being takes this as the purpose, and history and present situation are being in progress on the foundation fully analyzed what the finance and accounting to the traffic trade was worked, and the person who according to the government function changes concerned asks the basic train of thought that catching hold of before one that all finance and accounting reformation is worked, the research problem newly, solves new the problem, puts forward suiting the basic pattern of the finance and accounting of traffic trade development management work

    目前,我國經濟正處於21世紀初期的發展階段,交通事業也處於前所未有的快速發展時期,面對政府職能轉變和與國際經濟接軌,特別是加入wto后,交通財會工作能否適應交通事業的發展要求,創造性解決交通事業發展中的各類財會問題,進一步建立和完善交通行業新的財會管理模式,是擺在我們面前的重要課題。本論文正是以此為目的,在對交通行業財會工作的歷史和現狀進行充分分析的基礎上,抓住當前各項財會改革工作的基本思路,按照政府職能轉變的有關要求,研究新問題,解決新問題,提出適應交通行業發展的財會管理工作的基本模式。武漢理工大學碩士學位論文文章在第1章幫墓且重對職能轉變前交通行業行政與財會管理工作的狀況進行了分析,旨在提出在職能轉變前,交通行業財會管理工作存在的問題。
  13. Analysis on earthquake - induced differential settlement of an actual building was accomplished by using the simplified method proposed by authors

    摘要以山東淄博晨報華源大廈為例,運用簡化方法實現了對實際工程不均勻震陷分析。
  14. The combined effect of the soil, structure and seismic wave was considered in the analysis and the time - dependant curves of earthquake - induced differential settlement of the building were obtained according to differential probability of seismic ground motion

    考慮了土層、建築物荷載分配、地震動波形等影響因素對不均勻震陷的協同作用效果,依據不同超越概率下的地震動給出了建築物不均勻震陷時程曲線。
  15. Lonworks technique is a new generation technique of control network developed by echelon. it supplies a complete set of control system settlement scheme. as an open flexible system, it becomes the best choice of building automatic system

    Lonworks是由echelon公司開發的網路平臺,它提供了一整套控制系統的解決方案,作為新一代控制網路技術,它以其開放、靈活等特點成為樓宇自控系統的最佳選擇。
  16. Lastly, two axially loaded bored piles in some building site near xichang city was calculated with the method and some useful data and curves including load - settlement curves and distribution of friction resistance etc. are presented. the accordance between the results of calculation and in - situ test verifies the validity of the method developed in the paper

    通過計算,得到相應的荷載?沉降曲線、軸力圖、樁側阻力圖、塑性區、土的豎向位移等值線、樁的滑移過程等結果,並與現場試驗結果吻合較好,說明用本文方法計算分析樁基的工作特性是可行和有效的。
  17. Meanwhile, the key research topics are focused on how to reduce the differential settlement between the main tall building and the anex on soft ground, where to set the post - cast strip, and what cause the smart change of the internal force of plate under the core canister of tall building. an experiential equation for estimating the maximum moment of plate is advanced. a method for calculating the range and the thickness of the local enganced plate and another experiential equatio n for estimating the increment of maximum moment of the local plate are also suggested

    同時著重就軟弱地基中減小高層建築主裙房之間沉降差異的措施、施工后澆帶的設置位置,以及高層建築核心簡體下筏板內力變化劇烈等問題展開了分析,提出了筏板最大彎矩估算值的經驗公式,獲得了簡體下局部筏板加厚處加厚范圍及加厚厚度的取值方法及加厚處最大彎距增幅估算值的經驗公式,為今後設計同一類型高層建築提供一些借鑒。
  18. This paper, as for the contradiction happened in design, construction, acceptance check when the quality of the project was needed and the building speed is different in every section of the road, the residual settlement a h is needed to be less than the standard value, launches the project - - - - - - the analysis on the settling velocity o f high earth fill sub - grade and the study of stability

    本文主要是針對近幾年來在設計、施工、竣工驗收在工程質量評定中所出現的矛盾? ?一條公路少至幾公里至幾十公里,甚至上百公里,由於各個標段完工速度不一致,其剩餘沉降值(即竣工驗收時) h要求小於「評定標準」 (即垂直變形3cm ) ;而進行的《高填方路基沉降速度分析與穩定性研究》課題研究。
  19. Abstract : if cement paddling pile composite ground is used in civilengineering, the settlement and gradient are great after the building is completed

    文摘:本工程原採用水泥攪拌樁復合地基,建成后發生較大沉降。
  20. An analysis on the cause of ground settlement of a certain residential building and its reinforcement

    某住宅樓地基沉降原因分析及加固處理
分享友人