building slab 中文意思是什麼

building slab 解釋
建築用板
  • building : n. 1. 建築物,房屋,大樓,大廈。2. 製造;營造,建築;組合,組裝;建築術。
  • slab : n 1 平板,厚板;(圓木解成板時外面兩塊帶皮的)背板。2 (麵包等的)片,厚塊;鐵塊;土塊。3 混凝土...
  1. A case study of assessing overall crack rate of concrete slab of the building in kaohsiung city is performed to illustrate the potential aptness of this model

    結果顯示,本模式的分析結果與高雄市工程品質查核的結果差異不大。
  2. Dtu 22 - 1. building works. exterior cladding using large prefabricated panels of the solid or ribbed slab type or ordinary concrete. part 1 : technical specifications

    Dtu 22 - 1 .建築工程.專門合同.外部覆蓋層為大型預制板或肋板或普通水泥預制板.第1部分:技術規范
  3. ( 2 ) the stress caused by heat of hydration during construction is mainly distributed in the beams, and girders and stress in slab was smaller ; during service process, the stress caused by difference in temperature in different seasons is mainly distributed in bottom components ; the stress caused by difference of inside and outside temperature is mainly distributed in peripheral components of building ; the stress caused by difference in temperature due to sunlight is mainly distributed in the components exposed to the sun. ( 3 ) the control methods brought forward such as setting the reasonable stripping time reducing cast temperature of concrete setting after - treatment joint inflicting prestress arranging steel for construction requirement and so on are effective and their application may be extended

    在使用期,由季節溫差作用引起的結構內力主要分佈在底層構件上;由內外溫差引起的內力主要分佈在建築物外圍構件上;由日照溫差引起內力主要分佈在向陽面的構件上; ( 3 )在施工階段,可採取使用導熱性能較好的模板、合理設計拆模時間、降低澆築溫度等措施來減小水化熱引起的結構內力;採用設置后澆帶的措施來減小結構在整體降溫情況下產生的溫度內力。
  4. Published professional books about ultra - long concrete base slab construction in basement, large area terrazzo floor construction ; be competent for consultative work on building construction, construction technique, construction company management and construction supervision, etc

    本人在「地下室超長混凝土底板施工」 、 「大面積水磨石地坪施工」有專著;能勝任建築施工、施工技術、施工企業管理,建築監理方面咨詢工作。
  5. Through flat experiment and circle experiment, we research the causes of cracks before hardening of concrete and after. through ingredient experiment, we research the influence of shrinkage from some ingredient ( coal ash, crushed stones and fiber ). in addition, we test some methods of construction to strengthen the anti - crack capacity of r. c. slab in building sites

    通過平板試驗和圓環試驗,研究了混凝土在終凝前和終凝后裂縫的各種影響因素;通過摻合料試驗,研究混凝土的一些摻合料(粉煤灰、碎石和纖維)對其收縮變形的影響;另外,還在施工工地進行一些增強樓板抗裂能力的構造措施試驗。
  6. Thereinto, the transfer beam and transfer truss are used, while for the high - rise building with complex figure, only the transfer slab can be used. because there are few studys on transfer thick slab at present, this paper will discuss the problem

    使用較多的是梁式和桁架式轉換層,而對于上下柱網軸線錯開的體型復雜的商住樓,則只能採用厚板結構轉換層,由於這方面的理論研究還不多,本文就此展開討論。
  7. Prestressed concrete slab - column structure has been widely used in long - span and multistory building. there are four commonly used analysis methods for slab - column structure, which are direct design method, equivalent frame method, plasticity method and finite element method

    預應力混凝土板柱結構在大開間的多層及高層建築中得到了廣泛的應用,其設計方法有直接設計法、等代框架法、塑性分析法和有限元法等多種方法。
  8. Dtu 22 - 1. building works. exterior cladding using large prefabricated panels of the solid or ribbed slab type or ordinary concrete. part 1 : technical specifications - part 2 : special clauses

    Dtu 22 - 1 .建築工程.用大型實心或密肋板或普通水泥的預制板做成的外部覆面板.第1部分:技術規范.第2部分:特殊規定
  9. This semi - hard slab is suitable for insulation on building walls 、 roofs 、 ceilings 、 floor and various equipment components and tanks with a large curve

    該半硬型巖棉板,適用於建築物之墻體、屋面、天花板、地面及各種設備之部件和曲率半經較大的罐體等設施的保溫。
  10. As a new structural system, mrs ( multi - ribbed slab structure ) has achieved staggered fruit in multi - story buildings study and application. but the system ' s theoretical investigation and application study for moderate high - rise building is being nothingness yet

    作為一種新型結構體系,密肋壁板結構在多層房屋建築中的研究應用已取得較好的階段性成果,但對結構體系在中高層建築中的理論與應用研究尚處于空白。
  11. The necessity and purpose of the technological revamp is discussed in this paper. the subjects of the revamp are briefly introduced herein, which involve : 1 ) enlarging the desulphurization ability of hot metal to achieve complete desulphurization pretreatment of hot metal ; 2 ) drawing up a general plan and programme for the revamp of the continuous caster and implementing it step by step ; 3 ) building up a straight curved slab continuous casting machine at the begining to meet the requirements for high quality steel

    分析了技術改造的必要性;闡明了技術改造的目的;簡介了技術改造的主要內容,擴大鐵水脫硫能力,實現鐵水全部脫硫預處理,鑄機改造總體規劃設計、分步實施,先改建成一座直弧式板坯鑄機,以適應高質量鋼的要求。
  12. By means of field monitoring the strain in beam slab of partial building floors of a typical super - length prestressed floor slab after a period of their prestressing, the variation of stress with the temperature at different monitoring locations was given

    摘要通過對一典型超長預應力樓蓋的部分樓層梁板在施加預應力后一段時間內應變的現場監測,給出了不同位置測點應力和溫度的變化曲線。
  13. Specification for natural marble for building slab

    天然大理石建築板材
  14. Trough comparing the analysis results of two kinds of calculation model, drawing the following conclusion : ( 1 ) this structure - design satisfies the standard ; ( 2 ) in analyzing the complicated high - rise building with transfer - floor, it is very necessary to adopt at least two three - dimension - space analysis procedures with different mechanic model and use the response - spectrum analysis and time - history analysis to analyze the structure earthquake response ; ( 3 ) the calculation model with elastic slab is better than the other with being infinitely rigid in the internal slab and zero in the external slab, which reflects the real load - function situation of the structure

    通過比較兩種分析軟體的計算結果,得出以下結論: ( 1 )本結構設計滿足規范要求。 ( 2 )比較satwe和sap2000分析結果可知,對于復雜的帶轉換層的超高層建築結構應採用至少兩個不同力學模型的三維空間分析軟體進行整體計算以及採用振型分解反應譜法和時程分析法進行地震反應分析是必要的。 ( 3 )在sap2000分析中,將樓板模擬成彈性板,與satwe分析中的樓板平面內無限剛平面外剛度為零的模擬方式相比,這種模擬方式能更真實的反應結構的實際受力情況。
  15. Specification for natural granite for building slab

    天然花崗石建築板材
  16. Wood - wool building slab

    建築用木絲板
  17. By means of experimental investigation and theoretical analysis, a equivalent flexural stiffness model to origin slab is set up to meet tall building ' s design require and the structure ' s design procedure is stipulated to three phases - internal force analysis, carrying capacity checkout and anti - collapse design,

    通過試驗研究及理論分析,提出了中高層密肋復合墻體的抗彎等效模型以及結構設計的內力分析、承載力驗算、抗倒塌設計三個階段。
  18. Dtu 22 - 1. building works. private contracts. exterior cladding using large prefabricated panels of the solid or ribbed slab type or ordinary concrete. part 2 : special clauses

    Dtu 22 - 1 .建築工程.專門合同.外部覆蓋層為大型預制板或肋板或普通水泥預制板.第2部分:特別條款
  19. 3. through test of 1 / 4 - scaled two - storeyed model, the failure mode of multi - ribbed slab in high - rising building was simulated. the paper analyzed the slab ' s mechanical performance and normal section bearing capacity

    通過對1 4比例兩層聯肢墻片模型受力性能試驗研究,模擬了密肋復合墻板在小高層結構中的破壞形態,分析了其受力機理及正截面承載力。
分享友人