building under construction 中文意思是什麼

building under construction 解釋
建築中的房屋
  • building : n. 1. 建築物,房屋,大樓,大廈。2. 製造;營造,建築;組合,組裝;建築術。
  • under : adv 1 在下,從屬著,服從著。 bring under get under keep under 等〈參看各該動詞條〉。 The ship wen...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. Article 27 where a landownership holder has applied for postponement of commencement under paragraph 2, article 54 of the building act and the application has been approved, and thus the time limit for construction and utilization as prescribed in paragraph 1, article 18 of the act is exceeded, no additional land value tax will be levied

    第27條土地所有權人已依建築法第五十四條第二項規定申請開工展期並經核準,其因而超出本條例第十八條第一項限期建築使用期限者,不予加徵地價稅。
  2. Based on extensive investigation of construction technique history of chinese ancient buildings, the structure method, structure developing history and seismic behavior of chinese ancient timber structure buildings are analyzed in several respects of the structural system and form. through a series of experiments on constituent parts of chinese ancient timber building structure, including the tests on the corbels and brackets called dougong subjected to low cyclic reversed loadings, the tests on the wooden frame using the tenon - mortise joints as connections of column and beam subjected to low cyclic reversed loadings, the tests on vibration isolation effect of friction and slippage between column footing and their socle base, and a series of shaking table tests on a chinese ancient timber structure palace building mode under artificial earthquake at serving conditions, destroyed conditions and reinforced conditions, many valuable results of structures such as moment - curvature hysteretic loops of dougong structure and tenon - mortise joints under low cyckc reversed loadings, the static function, the seismic performance, energy dissipation, vibration reduction, energy - loss mechanism, nechanicalmode and failure mode were studied. aplenty of valuable parameters of the structure system were obtained, such as the natural period of structure, vibration modes, damping ratio, factor of vibration isolation, oscillate amplitude of ineitial accebration, velocity and displacement, magnitude of slippage, and the mechanism of structure failure and collapse etc. based on these research, the complete analysis of ancient timber structure under earthquake were carried out in which including mechanism analysis method, calculating mode, strength analysis of members and joints, strengthening methods for serving damaged ancient timber structure buildings were also taken into account

    依照宋代《營造法式》建造了抬梁式殿堂木結構構件及結構模型,對中國古代木結構中的典型構造如:柱腳在礎石頂面平擱簡支、柱架榫卯連接、柱高不越間之廣、側腳、生起、斗拱等的構造機理及結構功能進行了量化分析和實驗研究: (一)通過木柱石礎靜摩擦試驗,測定了柱腳與石礎古鏡面間的摩擦系數及摩擦力隨上部結構荷載變化的規律; (二)通過單柱承載力試驗,測定了古建築中木柱的受力變形特徵、破壞模式、及模型材料的變形模量、極限承載力、極限變形等參量; (三)通過柱架低周反復荷載試驗,測定了柱架的抗側移剛度、柱架恢復力特性及滯回曲線、榫卯張角剛度及其變化規律、柱架及榫卯的極限承載力和極限變形、及榫卯減振參數; (四)通過斗?低周反復荷載試驗和受壓試驗,測定了古建築木構件與木構件間摩擦系數,斗?抗側移剛度,斗?恢復力特性及滯回曲線,斗?抗壓極限承載力及受力變形規律; (五)通過抬梁式殿堂間架模型振動臺試驗,測定了殿堂木構架結構自振周期,地震反應振形、阻尼特性及阻尼比;按結構分層特點對柱腳、柱頭和斗?層上的屋蓋的地震反應採用多點同步測量,對柱根滑移、榫卯變形、斗?的變形、復位、耗能減振參數等進行了定量分析。
  3. Our university building is now under construction on a hillside in the north of fukuoka city

    我們的大學校舍正在興建中,它建在福岡城北部的山坡上。
  4. By translating autocad files into maplnfo format files and using cis technique for linking information, building technicians visually acquire all kinds of quality control information, easily carried out the control in advance as well as under construction, greatly improve construction project quality, therefore avoid project quality defect as possible as they can

    將目前設計院常用的autocad圖形文件轉換到mapinfor平臺上,利用gis技術使質量控制信息附著在該施工圖上,施工人員可以方便地獲得各種質量控制信息,從而更好地實行了事前、事中控制,顯著提高施工項目質量,減少施工質量事故的發生。
  5. In london, the top floors of a building under renovation collapsed, trapping a construction worker in the rubble

    倫敦一座正在翻新的建築物屋頂倒塌,一名建築工人被困於碎石中。
  6. A building under construction obstructs our view of the mountains

    正建的樓房擋住了我們眺望遠山的視線。
  7. Unpiloted vehicles will be employed to facilitate passenger transportation in the automatic transportation system of the third terminal building, which is under construction right now

    首都機場擴建工程3號航站樓的旅客捷運系統,是連通多樓的全自動旅客運輸系統,旅客可免費乘坐無人駕駛「小火車」轉機,十分便利。
  8. Chunghwa telecom long - distance communication building s water, electricity air system construction under construction

    中華電信長途通信大樓新建水電空調工程在建中
  9. Chunghwa telecom long - distance communication building s water, electricity & air system construction ( under construction )

    中華電信長途通信大樓新建水電空調工程(在建中)
  10. Projects completed included a maintenance depot on lantau island. projects under construction included departmental quarters at kwun tong, lai king, west kowloon reclamation and fanling ; and a joint - user office building at sha tin

    正在施工的項目包括分別位於觀塘、荔景、西九龍填海區及粉嶺的政府宿舍,以及沙田的綜合用途辦公大樓。
  11. What ' s that building under construction

    那座正在建造中的建築物是什麼
  12. Construction and expenses resulting from shipbuilding process, if any shipbuilding insurance is developing with the growing shipbuilding industry. this insurance insured different kinds of ships under construction during the whole shipbuilding course, including the loading, discharge, transit, kept and fitting of the materials and equipment occurring from building, demonstration until to delivery voyage

    它以各種類型的船舶作為保險標的,承保造船廠的整個造船過程,從建造試航直至交船,包括建造該船所需材料機械設備在船廠范圍內裝卸運輸保管安裝,以及船舶下水進出船塢停靠碼頭過程中發生保險事故造成的損失責任和費用。
  13. In 1993, the original nanmen commercial building was expanded and renamed as suzhou commercial building with floor area of 13, 800 square metres, and under construction is the taihua building with designed floor area of 50 thousand square meters. adding to the prosperity of nanmen district are the brisk markets at nanmen xi er road, such as agricultural products market, small commodities wholesale market and three large wholesale markets selling eggs, aquatic products and fruits

    1975年,以南門商場為基礎擴建的南門商業大樓, 1993年又擴建為有13800平方米營業面積的蘇州商業大廈,還有在建的5萬平方米的泰華大廈。南門商業區的集體、個體商業也發展迅速,在南門西二路有農貿市場、小商品批發市場、綜合貿易市場,還有禽蛋、水產、水果3個大型批發市場,使南門商業區更為興旺。
  14. The pseudo - dynamic test of 1 / 3 - scale model six - story building assembled with hollow shear wall with seams. the internal forces, the deformation and the failure mechansm of the building under earthquake are studied. the rules of frequency, damping and response spectrum are studied. the characters of earthquake response such as structure displacement, interstory drift, action of earthquake, the amplificatory coefficient of acceleration and the rule of strain are discussed. at last, this paper presented the design method of this structure based on the aseismic style and put forward the construction

    進行了帶縫空心剪力墻結構六層樓房的1 3模型的擬動力試驗,研究了結構在水平地震作用下的受力特點、變形特徵、破壞形態等力學性能;得到了結構在不同受力階段的頻率、阻尼、反應譜等動力特性變化規律;討論了結構各樓層的水平位移、層間位移、地震力、加速度放大系數及構件應力分佈規律等結構地震反應特徵;指出了結構的抗震類型、薄弱層及薄弱部位;提出了多層帶縫空心剪力墻結構的第一階段設計方法和相應構造措施。
  15. The shkp float will feature the local landmarks the arch, international finance centre, sun hung kai centre, central plaza, millennium city, international commerce centre - the third - tallest building in the world now under construction - and shkp s royal garden, royal park, royal plaza, four seasons and royal view hotels

    新地花車展現多項雄偉地標建築,計有凱旋門國際金融中心新鴻基中心中環廣場創紀之城,以及興建中的全球第三高環球貿易廣場。而新地旗下帝苑酒店帝都酒店帝京酒店四季酒店及帝景酒店亦展現在花車上。
  16. The parade was organized by hong kong tourism board. the building homes with heart float featured landmark shkp developments international finance centre, international commerce centre the third - tallest building in the world now under construction, sun hung kai centre, central plaza, millennium city, the arch and the royal garden, royal park, royal plaza, four seasons and royal view hotels

    是項大型匯演由香港旅遊發展局舉辦,新地的花車展示多項用心創建的劃時代地標物業,包括國際金融中心興建中全球第三高的環球貿易廣場新鴻基中心中環廣場創紀之城凱旋門帝苑酒店帝都酒店帝京酒店四季酒店及帝景酒店。
  17. An office building under construction collapsed in the bulgarian capital on monday, killing one and trapping up to 20 more builders beneath the rubble

    當日,索非亞一座正在建設之中的辦公樓坍塌,造成1人死亡, 20多名建築工人被埋在瓦礫中。
  18. Since the mortgage is registered, it produces external effects : the mortgagor and the mortgagee ca n ' t manage the uncompleted building at their will, and especially emphasizing on the problem of re - selling the house that is still under construction by the mortgagor ; both the mortgagor and the mortgagee ' s creditors have no right to bring a coercive execution against the uncompleted building

    樓花按揭的公示決定了其對外的效力:按揭人、按揭權人都不得擅自處分被按揭權益,其中著重論述了炒樓花的問題;按揭雙方的債權人都無權對被按揭權益提起強制執行之訴。樓花按揭貸款實踐中,來自開發商的風險是確實存在的,實踐也證明了這一點。
  19. A tower under construction in the united arab emirates ' trade hub became the tallest building in the world, measuring 512. 1 meters, its developer said

    位於阿聯酋貿易中心的在建的「迪拜塔」的開發商稱:高512 . 1米的迪拜塔是世界上最高的建築。
  20. In registering the mortgage of a ship under construction, the building contract of the ship shall as well be submitted to the ship registration authorities

    建造中的船舶辦理抵押權登記,還應當向船舶登記機關提交船舶建造合同。
分享友人