burden of river 中文意思是什麼

burden of river 解釋
河流攜帶物
  • burden : n 1 擔子,馱子;負荷,裝載量,載重噸數。2 負擔,包袱,重累。3 責任,義務。vt 1 使負重擔;使煩惱,...
  • of : OF =Old French 古法語。
  • river : n 1 河,江。 Rriver Thames 或 the R Thames 泰晤士河; the Hudson R 〈美國〉哈得孫河。 the Rriver ...
  1. If there is no over burden at the river bed, the steel pipe pile cannot be inserted, the floating platform will be adopted, during overwater construction, the author ( using zhong - 60 floating box, etc. ) assembled 40t floating crane by his own design, in this way, the floating crane completed the work of overwater transporting and lifting, such as the transporting of s teel pipe pile, inserting, the erecting of overwater construction platform, overwater moving of drill grid crane, lifting of lifting box of cushion cap, pulling out of steel pipe pile

    在水上作業中,作者利用中- 60浮箱等設備自行設計、拼制了40t浮吊,完成了水上運輸、水上起重等作業,如鋼管樁的運輸、插打、水上施工平臺的搭設、鉆機吊車的水上轉移、承臺吊箱的起吊、鋼管樁的拔除等作業。
  2. In which, it gives inquiring of the construction of deep - water foundations and the usage of floating crane. the construction program of bridge pier foundation will be fixed according to the water depth. if the water depth is less than 4m, pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed, at the same time, it has sufficient bearing capacity to load steel pipe pile, the steel pipe pile platform will be adopted

    其中,對深水基礎的施工及浮吊的使用進行了探討,根據水深確定橋墩基礎的施工方法,對水深不超過四米的橋墩基礎,採用填土築島的方法:對水深大於四米,河床有覆蓋層,且能保證鋼管樁具有足夠的承載力的橋墩,採用鋼管樁平臺;對主河道上河床沒有覆蓋層,鋼管樁無法插打的橋墩,採用浮式平臺。
分享友人