butterfly valley 中文意思是什麼

butterfly valley 解釋
蝴蝶谷
  • butterfly : n 1 蝴蝶;蝶式,蝶形。2 〈比喻〉舉止輕浮的人〈尤指輕浮的婦女〉;游手好閑的人。3 【機械工程】蝶形...
  • valley : n. 1. 谷,峪,河谷;凹處。2. 流域。3. 【建築】屋谷,屋面天溝。
  1. The ent contract include the following major items : construction of 0. 5km long at - grade tunnel approach within butterfly valley

    A在蝴蝶谷內建造一條長零點五公里的隧道引道
  2. Realignment of the ramps at the butterfly valley interchange

    平整位於蝴蝶谷交匯處的斜坡
  3. Random thoughts about the butterfly valley

    蝴蝶溝漫記
  4. A 0. 5 - km dual three - lane carriageway within butterfly valley ; eagle s nest tunnel - a 2. 1 - km dual three - lane tunnel under the eagle s nest

    在蝴蝶谷築建一條長0 . 5公里的雙程三線分隔車道
  5. The lckv contract include the following major items : construction of 1. 4km lai chi kok viaduct from lai wan interchange to butterfly valley

    A建造一條長一點四公里,由西九的荔灣交匯處至蝴蝶谷的高架路
  6. Lai chi kok viaduct - a 1. 4 - kilometre dual three lane elevated carriageway from lai wan interchange to butterfly valley

    築建荔枝角高架道路築建一條長1 . 4公里由荔灣交匯處至蝴蝶谷的雙程三線分隔高架車道。
  7. At about 3. 40 pm, a medium goods vehicle driven by a 53 - year - old man travelling along the westbound butterfly valley road reportedly went out of control near castle peak road in cheung sha wan

    今午約三時四十分,一名五十三歲男子力駕駛一輛中型貨車沿長沙灣蝴蝶穀道西行,駛至青山道時據報失控。
  8. On 1 april 2007, the section of eastbound carriageway of ching cheung road between ching lai commercial centre and butterfly valley interchange will continue to be subject to a temporary speed limit of 50 kilometres per hour until 30 june 2007

    分起,呈祥道介乎清麗商場及蝴蝶谷交匯處對開的一段東行行車道,將繼續臨時實施每小時
  9. For those yearning for activity, choose to visit the many exciting attractions located just a stone s throw away from the resort, such as the end of the earth, yalong bay square, butterfly valley, shell museum and luhuitou park

    背依青山連綿起伏,面呈海灣碧波蕩漾,湛藍的海水潔白的沙灘,是您休閑度假的理想去處。近在咫尺的還有蝴蝶谷貝殼館亞灣中心廣場及鹿回頭公園等名勝美不勝收。
  10. The tai po water treatment works together with the butterfly valley primary service reservoir in kowloon and the 12km long treated water aqueduct connecting the two waterworks form the tai po water scheme. this is one of the biggest water supply projects that the water supplies department ( wsd ) has undertaken in recent years

    大埔濾水廠連同九龍的蝴蝶穀食水主配水庫,以及連接濾水廠和配水庫的十二公里長食水輸水管道,組成大埔濾水廠供水計劃,是水務署近年來進行的其中一項最龐大的供水工程計劃。
  11. Affected vehicles will be diverted via lai chi kok road westbound, u - turn underneath kwai chung road flyover, cheung sha wan road eastbound, butterfly valley road southbound, lai chi kok road eastbound, u - turn underneath west kowloon corridor, lai chi kok road westbound, yuet lun street southbound and sham mong road westbound onto po lun street

    受影響的車輛須改經荔枝角道西行葵涌道天橋底下掉頭長沙灣道東行蝴蝶穀道南行荔枝角道東行西九走廊底下調頭荔枝角道西行月輪街南行及深旺道西行至寶輪街。
分享友人