cable check 中文意思是什麼

cable check 解釋
電纜檢查
  • cable : n 凱布爾〈姓氏〉。n 1 【造船】錨鏈,錨索,(周長10英寸以上的)左捻三根三股索;粗索,巨纜;鋼絲繩...
  • check : n 1 (象棋)將軍( ),被將軍的局面。2 (突然的)妨礙[制止,阻止];停頓,挫折;【打獵】(獵狗聞不...
  1. Check a cable when it 's running out.

    放出鋼絲繩時要制動。
  2. Place the units in their intended mounting locations to check the cable length and monitor installation conditions

    把設備放入計劃好的安裝位置,檢查電纜長度和監視器安裝條件。
  3. Check fast machine wheel or cable has eyewinker and blade position, check on bring off behind please

    檢速機輪或鋼索有異物及刀片位置
  4. Maintenance and check of the hoisting cable

    提升鋼絲繩的維護與檢查
  5. At last, for direct realization of this kind of structure system, an experiment of cable truss structure with d5 and 16 trusses has been done to check its distribution of self - equilibrium stress

    最後,為了對本結構體系有更直觀的感性認識,向時也為了進一步驗證理論分析的正確性,本文對一直徑5米、由16榻索析架組成的環形索析結構模型進行了實驗研究。
  6. 24 - hour room service, airport transfer, baby - sitting child care, butler services in suites, cable satellite television, car rental services, clinic, complimentary airport shuttle transfer, complimentary shoe shine service, conference facilities, coffee tea making facilities, drugstore minimart, express check - in and check - out, facilities for the handicapped, hair beauty salon, hospitality lounge, idd, in - room internet access, laundry valet services, non - smoking rooms, parking facilities, postal parcel services, safe deposit box, shopping arcade, taxi limousine services, voice mail

    大宴會廳是青島乃至山東省最大的會議場所,有三層可隨時移動的隔斷,可根據顧客的需要,決定使用面積,大宴會廳還有一個400多平方米的預備廳,可作簽到準備休息乃至雞尾酒會之用。所有會議室及宴會廳均設有先進備的影音裝置,包括多功能會議音響系統投影幻燈系統多制式錄像機舞臺燈光系統活動舞臺時裝表演臺及舞池文字處理設施文件復印設備演講臺活動支架,特別提供同聲翻譯及聲像投影系統。
  7. The factory has possessed advanced production equipments and wire cable check equipment at domestic. first class technology will provide you wire cable with fluorin polymer used in in aviation spaceflight, electric cables, control cables, computer cables, compensatory wire cables, fire - proof cables with high temperature, general plastic cables that classified into sixteen species and over one thousand specifications. cables for " hongyuan " brand are widely used in the fields of spaceflight, national defence, electric petroleum chemistry, steel, public establishments, environmental perfection and architecture. temperature - proof cables with " hongyuan " brand were awarded with famous products in 2001 which are widely sold all through the world and have been won customers trust

    一流科技力量為您提供航天用含氟電線電纜電力電纜耐熱防腐硅橡膠電纜耐高溫電纜控制電纜計算機網路電纜補償用電線電纜船用電纜橡套電纜阻燃防火電纜等十六大類,一千多種規格產品,並可根據擁護特殊要求,自行設計生產,以滿足顧客要求,多年來「宏源」牌電線電纜廣泛用於航空航天國防軍工電子原件電力石化鋼鐵冶金公共設施環保建築等領域,深受廣大用戶高度評價和信賴。
  8. It is very important for maintaining, monitoring and designing the great bridge to analyze and check the cable - stayed bridge

    斜拉橋檢測分析研究對于這類大型橋梁的養管、維修、監測及結構設計有著十分重要的作用。
  9. After electric heating system is installed, check electrical insulation of all circuits. the insulation resistance between generatrix and shielding layer, core wires of series cable before connection at end not be less than 20 m. and then check if dc resistance of circuit is normal and phase resistance is banlance

    電伴熱系統安裝完工後,應逐路檢查系統的絕緣電阻:各種電熱帶母線與屏蔽層之間、串聯帶芯線尾端末短接前的各芯線間絕緣電阻均應不小於20m ;然後再檢查電熱帶直流電阻是否正常,三相電阻是否平衡。
  10. Q what to do if lcd is not working after connecting to the power a please check the power saving mode by pressing any key or move the mouse to deactivate the power saving mode. also, please check the signal cable connector pins

    請檢查省電模式,按任何鍵或移動滑鼠,離開省電模式或檢查訊號線連接頭針腳,如果針腳彎曲或遺失請洽經銷商。
  11. Because of the uncertainty of the geological factor, the complexity of high slope project and the particularity of anchor cable project, after the slope is excavated, according to slope ' s stratum rock, weather degree, broken degree, split surface, slope body structure and moisture state, etc, check, analyse and judge reality synthetically, protect and strengthen and design dynamically the high slope, guarantee the stability of slope body and security structure

    摘要由於地質因素的不確定性,高邊坡工程復雜性和錨固工程的特殊性,待邊坡開挖揭示后,根據邊坡的實際地層巖性,風化程度、破碎程度、構造裂面、坡體結構和含水狀態等因素,綜合校核和分析判斷是否實際,對高邊坡防護加固進行動態設計,確保坡體穩定結構安全。
  12. If the label still does not print, check your cable connections

    若標簽仍然無法列印,請檢查您的線路連線系統。
  13. Check whether the lines to the touch screen is properly linked. if it is a control card for exterior hardware box, the box is directly linked with the cable extending from the touch screen through u - slot

    檢查觸摸屏的連線是否接對,如果是外接盒控制卡,則控制盒部分,通過回形槽,直接與觸摸屏伸出的電纜線連接
  14. Before the cable stripping firstly check whether there is cable injury, working pit is suitable or not

    光纜開剝前首先檢查光纜是否有損傷,工作坑是否合適。
  15. According to calculating and analysis, educes the distributing laws and their correlations of horizontal displacement and stress of stabilizing pile, anchor pull and earth press in two sides of pile, including the distributing of point repel force and internal force of pile at the terminal state, providing full theoretical basis for anchor cable and stabilizing pile structure design, strength check, stability check and determination of anti - slide force for a single stabilizing pile

    通過計算分析,得出了抗滑樁的水平位移、樁身應力、錨索拉力和樁側土壓力的分佈規律和它們之間的相互關系以及極限狀態時的樁的結點抗力和樁的內力分佈規律,為錨索樁的結構設計、強度校核、穩定性校核和單樁抗滑力的確定提供了充分的理論依據,同時也提出了錨索抗滑樁計算分析的一種新方法。
  16. Next came the first huge pay check, $ 20 million for " the cable guy "

    下次來首次巨額薪酬檢查, 20000000美元為"有線帥哥" 。
  17. Apart from the above - mentioned relief efforts, the supreme master ching hai international association also contributed a total of us 170, 000 to the american red cross, salvation army and firefighter memorial fund in new york by cable remittance and check

    除了上述的救援行動外,清海無上師世界會也捐贈十七萬元美金的匯款及支票給紐約的紅十字會救世軍及紐約的消防撫恤基金。
  18. If discrepancies are noted in documents presented, a usd75. 00 fee will be deducted from the proceeds in addition to any connected cable expenses incurred, a usd30. 00 wire fee will be deducted if payment is requested to be made by wire transfer or casher ' s check

    如單據中有不符之處,除由此產生的電傳費用外,還將扣除75美元.如要求以電匯或現金支票付款,將扣除30美元的電匯費
分享友人