cable frame 中文意思是什麼

cable frame 解釋
電纜托架
  • cable : n 凱布爾〈姓氏〉。n 1 【造船】錨鏈,錨索,(周長10英寸以上的)左捻三根三股索;粗索,巨纜;鋼絲繩...
  • frame : n 1 機構;組織;系統。2 結構,框架,構架,骨架,骨骼。3 體格,身軀。 4 精神狀態,心情。5 【園藝】...
  1. ; 1. the trend of the development of burden and light hanging basket in the cantalever construction of continuous rigid frame bridge has been prospected, the roof truss and cable - state composite hanging basket also has been designed by analyzing and comparing with other ones. 2

    對大跨度橋梁懸臂澆築施工的各種形式掛籃施工工藝進行了比較和總結,對連續剛構橋懸臂澆築掛籃施工中重載輕型的發展趨勢進行了展望,提出了一種用於解決重載輕型懸臂澆築施工的新型桁架斜拉式組合掛籃,並進行了可行性分析計算和設計。
  2. Consisting of a small camera head, detachable cable and custom frame grabber board, the lightning rdt

    高速攝像儀擁有一個小型的攝像頭,可分離的數據線和幀捕獲
  3. Abstract : according to the characteristics of cable and the varing of the top dislacement of the fixed tower frame, the paper puts forward the method of design and construction control of tower frame ? s wind cable, which regards the permitted top displacement of the tower as the control aim

    文摘:根據索的特性及底端固支塔架的塔頂位移的變化,提出以塔頂允許位移為控制目標,對塔架纜風的設計及施工控制方法的探討
  4. Odf ddf distribution box cable distribution frame series

    配線箱配線架系列
  5. According to the special stratum condition 、 soil parameter 、 pile frame system in the protecting landslide of hongtian jianfeng in yongan city in fujian province, compile a fem program of plane strain and analyze the interaction by nonlinear fem on intensity discount. in the program, duncan - chang model is applied to earth, elasticity model is applied to pile and rock ; goodman element is set between pile and rock - earth and applied to simulate sliding plane and flexible floor ; sequential pole elements with original stress are applied to anchor cable

    在程序中土體採用了duncan - chang雙曲線本構模型,樁和錨固層以下的巖體採用了線彈性本構模型,並且在樁和巖土體間設置了無厚度的古德曼( goodman )單元,對于軟弱夾層和已知的滑裂面也採用古德曼單元模擬,錨索採用的是具有初始應力的連續桿單元模擬。
  6. A new bridge structure cooperated by the single - towered cable - stayed structure and the rigid frame structure was presented. many aspects of jinma bridge are researched and analyzed, such as the design method, configuration of the superstructure, section choice of the tower, design and construction methods of the deep - water bases, the stiffness of the cooperated rigid frames, strengthening way in the tower. it is concluded that this new structure is the economical, aesthetic and suitable project for the large - span situation

    主要內容和結論如下: 1 、提出了獨塔斜拉橋與兩側剛構相連接的新型協作體系斜拉橋結構形式,並對該橋的方案比選、設計思路、橋面系結構形式、塔柱截面設計、深水基礎的設計及施工方法、協作剛構的剛度選取、塔柱的直束加固等方面作了詳細地計算分析和比較。
  7. The paper, in the light of my bureau ' s construction experience and project practice in constructing large span prestressed continuous beam bridge ( continuous rigid frame ) in recent dozens of years, introduces a new thinking about the standardized design of cable - stayed hanging basket and the standardized construction technology of the continuous beam bridge ( continuous rigid frame ), gives the detailed account of a series of construction technique and achievements such as : the development and construction ways of large span continuous beam bridge, the standardized design thinking and operation of cable - stayed hanging basket, the standardized construction technology of the continuous beam bridge ( continuous rigid frame ) etc., meanwhile, it is attached with a whole set of detailed standardized design sample drawings of cable - stayed hanging basket

    本文根據我局十幾年來修建大跨度預應力連續梁(連續剛構)橋的施工經驗和工程實例,介紹了一種斜拉式掛籃標準化設計的新思路及連續梁(連續剛構)橋標準化施工工藝。詳細敘述了大跨度連續梁橋的發展、施工方法、斜拉式掛籃標準化設計思路及做法、連續梁(連續剛構)橋標準化施工工藝等一系列施工技術及成果,並附有全套詳細的斜拉式掛藍標準化設計定型圖。對同類型橋梁的施工及掛籃設計具有參考價值。
  8. Odf ddf distribution box cable distribution frame series distribution box series

    Odf ddf數字配線箱配線架系列
  9. Then the paper designed for cable modem frame by using a kind of top grade special cpu and an asic, when analyzing the hardware architecture, and finally formed the entire hardware system by integrating flash, dram, eprom, and e2prom memories, ethernet, rs232 interfaces, and high frequency circuit

    然後分析了硬體環境,論文中給出了利用一種高檔專用cpu和一塊超大規模asic為基礎設計出cablemodem的框圖。然後加上flash 、 dram 、 eprom 、 e2prom存儲器,以太網、 rs232介面,以及高頻頭電路,最後形成cablemodem的完整硬體系統。
  10. Optical fiber cable distribution frame

    光纖配線架
  11. - ii - 5. with the consideration that the cross section of the cable - stayed structure and the rigid frame structure ' s are not uniform, a new joint solution was presented for these different sections

    5 、針對金馬大橋斜拉橋側主梁截面與t構側主梁截面形式不統一的問題,提出了一種不同結構斷面的新型連接方法。
  12. In this thesis, three factors resulting in geometric nonlinearity are taken into account, then using plane frame method and based on plane bar finite element, nonlinear analysis to the construction of cable - stayed bridge is achieved

    考慮幾何非線性的三個影響因素,然後利用平面框架模型,以平面桿系有限元法為基礎對斜拉橋施工進行非線性分析。
  13. Its advantage is simple frame, few cable, saving materials and fees, decrease of maintenance. this paper proposals the research in distributed control system ( dcs ) and fieldbus control system ( fcs ) and describes the progresses from dcs to pcs

    本論文通過對集散控制系統( dcs )與現場總線控制系統( fcs )的研究,闡述了集散控制系統發展到現場總線控制系統的進步性。
  14. 16 - port frame optical fiber cable

    16槽機架光纖收發器
  15. The form of earthing board and cable fixed frame can be changed as actual conditions

    接地排與電纜固定架的形式和尺寸可根據實際情況作適當改動
  16. Being calculated, the frame beam - on - foundation may be disconnected to two single beams. on the pulling anchor - cable step, the internal force of single beam - on - foundation can be calculated by winkler hypothesis in the case of weak rock mass and infinite half elastic foundation hypothesis in the case of stratums that are of some elastic characteristics. the internal force of frame beam - on - foundat

    在張拉階段,對于單片型地梁,可以採用溫克爾假定計算破碎軟弱巖體上的地梁內力;有較好彈性性質的地層,可按彈性半無限體地基計算地梁內力;對于框架型地梁,可按溫克爾地基模型計算其各單片梁的內力。
  17. Above cable data for standard motors only, with cable length of 25 '. data applicable through lengths of 100 '. 140 frame motors with # 16 awg cord utilize single cable, ( 8 ) conductor, with power and control leads

    上列電纜參數僅適用於標準電機,長度為25英尺。可提供的電纜長度最大為100英尺。符合# 16awg標準的140機架電機採用實用的單芯電纜, ( 8 )導線,配置電源和控制引線。
  18. Anti - sliding pile especially the pile with prestressed anchor cable and the foundation beam with prestressed anchor cable including the single beam and the frame, are the new pattern structures of the pile - anchor system that have been widely used in the slide - resistant engineering. studies on designing theory of these structures are delayed greatly than their applications. there are no specifications to consult and there are many problems when designing and computing these structures

    抗滑樁尤其是預應力錨索抗滑樁和預應力錨索地梁(包括單梁和框架梁)是近年來較多地應用於抗滑工程的新型樁錨結構,這些結構的設計理論研究大大滯後於工程應用,其設計計算缺乏相應的規范作指導,存在的問題較多。
分享友人