cable ship 中文意思是什麼

cable ship 解釋
布纜船
  • cable : n 凱布爾〈姓氏〉。n 1 【造船】錨鏈,錨索,(周長10英寸以上的)左捻三根三股索;粗索,巨纜;鋼絲繩...
  • ship : n 1 船;大船;海船;艦〈作陰性看,代名詞用 she her〉。2 三桅船;全裝帆船。3 船形物。4 〈俚語〉賽...
  1. I can see her quite distinctly. you said the other day that she was fine in figure ; roundly built ; had deep red lips like cupid s bow ; dark eyelashes and brows, an immense rope of hair like a ship s cable ; and large eyes violety - bluey - blackish

    有一天你說她的身材很苗條長得也很豐滿像丘比特的弓一樣彎彎的嘴唇紅紅的眼睫毛和眉毛是黑色的,一頭烏發就像一堆錨繩一樣一雙大眼睛既有點兒紫,又有點兒藍,還帶點兒黑。 」
  2. The new ship cut her cable and slipped into the water.

    新船砍纜下水。
  3. Captain hiller quickly backed the ship, and the cable was paid out to reduce towline tension.

    希勒船長急忙使船退行,放鬆纜繩以減少作用在它上面的張力。
  4. Another based mathematics model about the anchor cable is used for ship - anchor system. the numerical calculation have been worked by programmed in the matlab language. at the same time the influence that the dragging speed of antisubmarine helicopter and the height over the surface of ocean acts on the shape and the tension of underwater cable, and that the current velocity and the diameter of anchor cable acts on the shape and the tension of anchor cable, has been calculated

    把建立的水下拖索數學模型和錨索數學模型分別應用於航空吊放聲納探頭?纜繩動力學系統和船?錨系統,採用matlab語言編程進行了數值計算,同時分別計算和分析了反潛直升機拖速、距海面高度對拖索形狀和張力的影響以及海流速度、錨索直徑對錨索形狀和張力的影響。
  5. In the past 21 years dalian office finished more than 120 projects all over north - east in the field of microelectronic, optical fiber and cable, lcd, biological and pharmaceutical, mechanic, assembly, steel, ship manufacturing and domestic buildings. some of the projects got the prize from national or provincial construction department. below are the reference projects dalian office finished these years : dalian dongfu lcd co., ltd, dalian haire industry park, guangyang bearings dalian co., ltd, konica dalian co., ltd, canon dalian office appliance co., ltd, pacifica electronics co., ltd, photoelectron dalian co., ltd, hyundai electronics dalian, rhi dalian co., ltd, yuanda pharmaceutical co., ltd, siemens vdo auto electronics changchun, toyota tianjin precise products co., ltd 6000, toyota zhangjiagang technology co., ltd, shenyang sico semiconductor co., ltd, dalian dongxian and dalian orient precise products co., ltd. dalian office will carry the principle make best design, provide satisfying service to provide our best service to the clients

    Edri大連分院成立至今完成120多項工程設計監理及工程總承包項目,其中多個項目工程設計獲得國家和部省級科技進步獎,先後完成了大連東福彩色液晶顯示器工程大連海爾工業園光洋軸承大連有限公司柯尼卡大連有限公司佳能辦公設備大連有限公司太平洋電子有限公司光電子大連有限公司現代電子大連有限公司奧鎂大連有限公司,大連高新生物制藥有限公司大連保稅區國際車城遠大制藥有限公司西門子威迪歐汽車電子長春有限公司豐田合成天津精密製品有限公司豐田合成張家港科技有限公司,沈陽科希-硅技半導體技術第一有限公司大連東顯電子有限公司大連東方精工有限公司等一大批高科技產業園區設計項目,並且進行全程質量跟蹤服務,在業內樹立起edri大連分院良好口碑,贏得了客戶廣泛好評,為我院在東北地區的發展做出了自己的貢獻。
  6. From this thesis, it can be stated that the use of observation implement and active cable can produce timely active control to ship in the wave. because active cable can enhance ship ' s ability of anti - siamming but do n ' t affect ship ' s inward capability, it should be given some attention in the application research of active control method in ship structure vibration by slamming

    從本文中可以看出,將觀測器和作動器相結合可以對航行於波浪中的船舶結構振動實施適時的主動控制,並且裝上作動器不但不會影響船體本來的性能,而且可以增加其抗波浪砰擊能力,因此主動控制方法在船舶結構砰擊響應控制方面的應用和研究應該給予一定的重視。
  7. There is nearly no research on using active control method to reduce ship structural vibration stirred by slamming. this thesis studied theoretically on active cable and active tuned mass damper which were designed on the base of lqr theory. then the thesis studied concretely on the validity of active cable by an example

    本論文對船舶結構波浪砰擊響應的主動控制方法進行了研究,主要對基於線性二次型最優控制原理設計出來的主動纜作動器和主動式調諧阻尼器兩種控制器做了理論原理和作動器構成上的探討,並進一步研究了主動纜作動器運用於船舶因波浪砰擊引起的結構振動控制的有效性。
  8. Currents often cause feathering of the cable away from the ship's path.

    潮流的影響,常常會使拖纜偏離船隻的航線。
  9. In the full of research, the thesis constructed the dynamic equations of the simplified model, then programmed and computed the feedback gains using lqr method. moreover, the thesis plotted pictures of displacement, velocity, acceleration, bend and shearing force of ship ' s head and middle part in the condition of using cable and not using cable

    在研究工作中,首先對船舶的簡化模型建立了動力學方程,然後採用線性二次型最優控制方法,編寫程序並計算出船體垂向振動固有頻率和最優反饋矩陣,得到控制前後船艏以及船舯部的位移、速度、加速度、彎矩和剪力歷程圖。
  10. It is important to maintain the ship chamber horizontal and keep cable tensions in equilibrium during the running of the hoisting fully balancing type ship lifter. the distributions of displacements and cable tensions are unbalanced because of construction errors. a hydraulic balance system which has 48 oil cylinders is designed to eliminate the unsafe factor

    為了消除該不安全因素,使升船機工作時,承船廂能在水平、受力均衡的狀態下升降,設計中的升船機有一個由48個液壓油缸組成的液壓均衡系統,靠它維持船廂的水平狀態和提升索拉力均衡。
  11. There must be a marine casualty happened every 4 days before 1984, the amount of marine casualty happened at this area corresponds to 1 / 7 amount of the whole changjiang " marine casualty, so mariners gave it a name as " mouth of tiger ". due to the specific geographical condition and the extremely representative vessel traffic management of changjiang yingongzhou channel section, many intelligent people began researching and practicing the vessel traffic management of this changjiang " s down - stream complicated channel section from 1980s, at dec 15th 1984 the authority at that time - changjiang yingongzhou channel section previously ; up to the last years of 1980s ministry management administration applied traffic control on changjiang yingongzhou channel section previously, up to the last years of 1980s ministry of communications assigned shanghai marine college, shanghai ship & shipping research institute and changjiang harbor superintendence administration to make feasibility demonstrate about modern vts of zhenjiang traffic control section ; in 1990 dasha radar station which is the first radar vts station with inner river was finished, groped a new way for applying modern radar traffic control of vessel traffic management ; in 1997 the vtms of changjiang " s down - stream from nanjing to liuhekou was completed with connecting net and came into operation formally, meanwhile the signals of dasha radar station were conveyed to vts center by light cable, and then united applying vessel traffic management upon the whole authorized area ; in jun 2001 jiangsu msa made changjiang yingongzhou channel section as the first experimental group of creating " civilized, safe, passable channel activity, updating dasha radar antenna and receive - transmitter building closed - circuit television monitor system, setting uo safety warning board, starting navigational route reformation, carrying out united construction

    1984以前這里平均每四天就發生一起海損事故,事故數占整個長江的1 7 ,被行船人稱為「老虎口」 。長江尹公洲航段緣其極為特殊的地理區位條件和極具代表性的船舶交通管理,從上個世紀八十年代初就有識之士開始了這個長江下游最復雜航段的船舶交通管理探索和實踐。 1984年11月15日當時的長江航政管理局在長江尹公洲水域率先施行交通管制;到八十年代末交通部委託上海海運學院、上海船舶研究所和長江港監局聯合開展鎮江交通管制段建立現代化交管系統的可行性論證; 1990年大沙雷達站? ?內河第一座雷達交管站建成,摸索實施現代化雷達交管的船舶交通管理新途徑; 1997年長江下游南京至瀏河口船舶交通管理系統建成聯網投入正式運行,同時將大沙交管雷達信號通過光纜傳輸至交管中心,統一實施全轄區船舶交通管理; 2001年6月江蘇海事局將長江尹公洲航段作為第一批創建「文明平安暢通航段」活動試點航段,更新大沙雷達天線和收發機,著手閉路工業電視監控系統建設,設立安全警示牌,啟動航路改革,開展聯合「共建」 。
  12. I t owns international - advanced cross - linked cable production lines at rated voltage up to 500kv in the 1990 s, rubber cable line of 35kv, ship and mineral cable line, optical fiber cable for communication use and data cable line, extra - high voltage cable testing device, with which bare wires, electric power cable for electric equipment, power cable and distribution air reinforced insulated generatrix slot, 5, 6, and 7 data and digital cable with 6 classes, hundreds of series and tens of thousands of specifications

    集團擁有國際90年代先進水平的500kv及以下8條交聯電纜生產線, 35kv橡纜生產線、船用、礦用電纜生產線、光纜、數據纜生產線以及光纜、超高壓電纜檢測裝置,能生產裸電線、電氣裝備電線電纜、電力電纜、配電類空氣加強絕緣型母線槽, 5 、 6 、 7類數據纜、光纜共六大類、百余個系列、萬余種規格的產品。
  13. Half - way across the atlantic the cable broke, and the ship that was laying it had to return

    回答:鋪設越洋電纜的船在(鋪設到)大西洋過半位置(半道上)時,電纜斷了, (所以)它不得不返航。
  14. The results of the analysis proved that the displacement, velocity, acceleration, bend and shearing force of ship ' s head and middle part were controlled effectively with active cable

    通過對模擬結果的分析和研究,發現加上主動纜作動器后,可以有效地對船艏和船腫的位移、速度、加速度、彎矩和剪力實施控制。
  15. Then i took the pieces of cable which i had cut in the ship, and i laid them in rows one upon another, within the circle, between these two rows of stakes, up to the top, placing other stakes in the in - side, leaning against them, about two foot and a half high, like a spurr to a post, and this fence was so strong, that neither man or beast could get into it or over it : this cost me a great deal of time and labour, especially to cut the piles in the woods, bring them to the place, and drive them into the earth

    然後,我用從船上截下來的那些纜索,沿著半圓形,一層一層地堆放在兩排木樁之間,一直堆到頂上,再用一些兩英尺半高的木樁插進去支撐住纜索,彷彿柱子上的橫茶。這個籬笆十分結實牢固,不管是人還是野獸,都無法沖進來或攀越籬笆爬進來。這項工程,花了我不少時間和勞力,尤其是我得從樹林里砍下粗枝做木樁,再運到草地上,又一一把它們打入泥土,這工作尤其費力費時。
  16. Ship class - 3 cable chain

    船用三級錨鏈
  17. Cable for power system of ship

    船用電力電纜
  18. Cable sealing technology of naval ship

    艦船電纜密封工藝
  19. Converted cable ship

    改裝電纜架設船
  20. Cs cable ship

    電纜敷設船
分享友人