calculated capacity 中文意思是什麼

calculated capacity 解釋
計劃容量
  • calculated : adj. 1. 有計劃的,有意的,故意的。2. (預備)供…之用的,合於…之用的。3. 算清了的;被預測出的。
  • capacity : n 1 包容力,吸收力,收容力。2 容積,容量;【電學】電容,負載量。3 能力,才幹,本領;性能,機能。4...
  1. The best optimum mathematical model is constituted. scalar factor of structural parameter on loop rectangular negative pressure and adsorption slide is calculated. structural parameter, air gas source pressure carrying capacity and thickness of air cell are made sure by hydrodynamics and the theory of gas lubrication

    詳細論述了導軌副的設計過程,運用數學上的拉格朗日條件極值求解法,建立最優化數學模型,求出環矩形負壓吸附導軌的結構參數的比例情況,並運用流體力學和氣體潤滑理論確定了環矩形負壓吸附導軌的結構參數、氣源氣壓、承載能力和氣膜厚度的確定性結論。
  2. The stability bearing capacity of purlin was calculated by formulas of two criterion and some design manual. some comments on the design of purlin are proposed after comparing the results, including the investigation result of this paper

    把試驗和理論計算結果與門式剛架規程、澳洲冷彎型鋼結構規范及設計手冊的計算結果進行了比較。
  3. The representative failure models of arch rib are searched and the rib section resistances are calculated by incremental method and disadvantage loading in the control sections. the structure reliability assessment index on bearing capacity of the arch - bridge is calculated by the function of bearing capacity reliability, structure resistance probability model, load action effect probability model and jc method

    對每種荷載布置型式,採用荷載增量法進行拱橋結構失效模式的尋找和截面抗力的計算,給出其承載力可靠度功能函數,推導功能函數中結構抗力和作用效應概率模型,並利用改進的一次二階矩法計算在用拱橋承載力可靠度指標評估值。
  4. In this paper, the following work has been done : 1 the load - bearing capacity of l, t and + - shaped columns under axial compression and biaxial bending is calculated by a numerical integral program

    本文主要進行了如下工作: 1對l 、 t 、十形柱雙偏壓作用下正截面承載力進行計算,編制了數值積分程序,並對l 、 t 、十形柱偏心矩增大系數進行計算分析。
  5. In this paper at last. the localized anti - collapsing effect of the cave depot of single aircraft under the explosive load is calculated and analyzed. the explosive result shows that 3d ripped steel plate and ribbed shell structure are effective to raise the capacity of anti - collapsing of the protective structures

    對飛機單機掩蔽庫工程在爆炸荷載作用下,抗局部震塌效應進行了計算分析,模擬直接命中的爆炸試驗結果表明:鋼筋混凝土內襯三維波紋鋼板組成拱型復合結構,是提高防護結構抗震塌破壞的一種十分有效的措施。
  6. In this paper, the sensibility analysis of the factors affecting the temperature in well bore is relatively systematically made by using a large number of the data calculated with the borehole flow and heat transfer 3 ? d numerical model proposed by the author. the study shows that the thermophysical parameters of the drilling fluid and formation, etc. and the entrance temperature and circulating capacity, etc. of drilling fluid have a greater influence on the temperature in well bore. therefore, accurately mastering the thermophysical parameter values of penetrated formation and drilling fluid in well bore, considering the influence of the temperature and pressure on thermophysical parameters and accurately measuring such parameters as entrance temperature and discharge capacity of drilling fluid, etc. are of utmost importance for accurately simulating the temperature in well bore

    利用由作者提出的井內流動和傳熱的三維數值模型計算所得的大量數據,文章對影響井內溫度的諸多因素進行了較系統的敏感性分析,研究表明:鉆井液和地層等的熱物理參數以及鉆井液的入口溫度、循環排量等對井內溫度有較大影響,因此,準確掌握所鉆地區地層和井內鉆井液的熱物理參數值,考慮溫度壓力對熱物理參數的影響,準確測量鉆井液的入口溫度、排量等參數值,對于井內溫度的準確模擬至關重要。
  7. At same time, a simulation platform was established for computing the capacity of wireless mimo channel, and on the platform it was calculated out the cumulative distribution functions ( cdf ) of the channel capacity of the integrated mimo channel model on the basis of specific parameters provided by the 3gpp standard rl - 02 - 0181 specifications

    同時創建了一個無線mimo通道容量的模擬平臺。並以3gpp標準r1 - 02 - 0181所規定的具體參數為依據,在該模擬平臺上計算出了模擬通道的通道容量的累計分佈,並和相應條件下的理論容量進行了分析比較,得到了有關結論。
  8. Dynamic test has been performed on three strengthened girders after they were being put into service. according to the measured data from the dynamic test and the calculated results of the proportion of the load distribution on steel diagonal braces and steel crane girders as well as the increased carrying capacity after strengthening in consideration of the principle of cooperative work between braces and crane girders, the feasibility, rationality, and economy of this strengthening scheme have been verified. this scheme can be applied extensively to strengthen crane girders system including concrete crane girders system hereafter

    最後結合對已經加固施工並投產使用的3榀鋼吊車梁的現場實際動測結果,按考慮下部鋼斜撐與鋼吊車梁二者協同工作的原理對鋼吊車梁與下部斜撐之間的荷載分配比例以及加固后鋼吊車梁的承載能力進行了進一步的計算驗證和對比分析,論證了採用鋼斜撐方案加固已有鋼吊車梁的合理與有效性。
  9. And it investigates the appearance condition ( including joint, crack, eroding, corrosion, braking pole device rupture, crane - girder ' s gnawing railway and so on ) of the whole crane - girder system on the spot, at the same time, it also actually examines the stress of the beam, chemical ingredient, distortion and railway excursion, etc. through sampling, and based on the actually examined results, it checks and calculates the carrying capacity of crane - girder system. then, based on the investigating on the spot and the calculated result, it discusses the mechanism of fatigue failure of the upper part of welded steel crane - girder, analyses the reason of steel crane - girder in the high - frequency emerging the fatigue crack, institutes the strengthened method of damaged steel crane - girder of accurate packing up workshop of the primary mill plant. finally, it presents some advice and suggestions for the repairing and strengthening method of fatigue crack of upper part of steel crane - girder in the high - frequency

    針對包鋼初軋廠精整車間鋼吊車樑上部區域出現裂縫這一問題,本文首先綜述了國內外關于焊接鋼吊車樑上部區域疲勞裂縫的研究現狀;其次對整個吊車梁系統的外觀情況(包括連接、裂縫、腐蝕、銹蝕、制動桿件斷裂、吊車啃軌等)進行了現場調查,抽樣實測了梁的應力、化學成分、變形及軌道偏移等,根據實測結果,對吊車梁系統的承載能力進行了驗算;然後,根據現場調查及計算結果,探討了焊接鋼吊車樑上部區域疲勞破壞的機理,分析了重級工作制鋼吊車梁出現疲勞裂縫的原因,制定了初軋廠精整車間破損鋼吊車梁的加固方案;最後就重級工作制鋼吊車樑上部區域出現疲勞裂縫的修復與加固方案提出了一些意見和建議。
  10. Base on the theory of bearing capacity of single pile, we calculated the bearing capacity of single precast pile in zhoushan. the target reliability and partial factors were provided at the same time. according to the theory of settlement of single pile, mindlin solution and layerwise summation method, we also calculated the settlement and provided a settlement prediction method

    結合舟山實際試樁資料,本文對單樁承載力進行了估算,在此基礎上進行了可靠度指標的計算和荷載分項系數、抗力分項系數的計算;根據沉降理論對單樁沉降應用mindlin解和分層總和法進行計算並與資料進行了對比。
  11. In recent years, many barrages have been founded in dagu river, which greatly change the conditions of the exploitation and supply of groundwater. on the basis of calibration of mathematical model of hydrogeology, the effect of diversified factors on the variation of groundwater is analyzed using visual modflow software, the recharge capacity of rubber dam to the groundwater storage is studied and the allowable withdrawl of groundwater with the influence of manpower is calculated again

    近年來大沽河幹流及支流已增加多處攔河壩工程致使地下水采補條件發生了較大變化,本文利用visualmodflow軟體分析了各種影響因素對地下水動態的影響,研究了橡膠壩對地下水庫的補給能力並重新核算了人工影響條件下大沽河地下水庫的允許開采量。
  12. At last, taking the example of maotiao river the amount of low water resources carrying capacity was calculated

    最後,本文以貓跳河流域為例分別從年徑流量和枯季徑流量的角度計算水資源承載力的大小。
  13. The maximal load - carrying capability of the arch support is calculated by adopting mechanical model of curved beam based on its force analysis, and relationship between bearing capacity coefficient of small curvature arch support and radius and span of curved beam is gained based on supporting capacity comparison of curved beam and straight beam

    採用曲梁模型進行了支架系統的受力分析,得到其最大承載能力;通過與直梁支架承載能力相比較,得到了小曲率拱型支架承載能力系數與曲梁跨度和半徑的影響關系。
  14. That the connotations, forming mechanisms, and the calculation methods on each element involved in water price are studied systematically and deeply. the water prices of luanhe basin, tianjin city and yinluanrujin iwt system in the typical year 2000 are calculated as the cases. the problems including the relationships between water price and water demand, as well as the bearing capacity of the consumer to water price are discussed

    提出了水價構成的理論公式;對水價構成中各基本要素的內涵、形成機理及其計算確定方法進行了較系統深入地分析研究,並對2000典型年灤河流域、天津市和引灤入津調水系統的水價問題進行了實證研究;對水價與需水量的關系以及用戶對水價的承受能力等問題進行了一定的分析探討。
  15. System capacity is calculated by the accurate current detection

    系統電量通過電流測量獲得,高精確度
  16. In this paper, the researching and developing situating at home and abroad on aseismic properties of the masonry structures are reviewed. aiming to the defects of the calculated formulas of the aseismatic shear strength of brick walls in the code for seismic design of building ( gb50011 - 2001 ) and the code for design of masonry structures ( gb50003 - 2001 ), through test on brick wall models between the single wall and the wall with flanges, restoring force characteristics, the behavior at failure of the brick masonry wall and the effect of longitudinal wall under cyclic horizontal loading were analyzed the aseismic capacity has increased by 31 % for wall with flanges, the rigidity and deformation of the wall has gone up greatly too. the conclusion that the effect of longitudinal wall should be comprised in the aseismatic formulas was proposed

    本文回顧了國內外關于砌體結構抗震性能的研究與發展現狀,針對建築抗震設計規范( gb50011 - 2001 )和砌體結構設計規范( gb50003 - 2001 )中墻體抗震驗算公式中的不足之處,通過單片墻和帶翼緣墻在垂直荷載和水平反復荷載作用下的對比試驗,研究了帶翼緣墻在水平反復荷載作用下的恢復力特性曲線、磚墻破壞特徵以及縱墻的影響等,翼緣墻的存在,主墻抗剪能力可以提高31 ,剛度及變形能力也均有較大提高的結論,墻體驗算公式中應當考慮縱橫墻共同作用的影響。
  17. According to elasto - plasticity theory, with the help of finite - method program ansys, the paper undertakes the computer analogue tests about the bearing capacity of pile tip arranged by orthogonal principle, and attains the relations of pile - tip bearing capacity to embedment depth, pile diameter, cohesion, internal friction angle and modulus of deformation. by the means of mathematical statistic, regression equation of the ultimate bearing capacity calculated by finite element method is gained through the regression analysis of 81 group data from the computer analogue tests. by comparison and analysis of the values calculated by finite - element regression equation and the values of in situ loading test, the regression equation is gained which calculates the size effect for base resistance of large diameter pile

    根據彈塑性理論,運用大型有限元軟體ansys按正交設計理論對樁端承載力進行模擬計算,獲得樁端承載力與樁長(埋置深度) 、樁徑、粘聚力、內摩擦角及變形模量等主要影響因素的關系,並採用數理統計方法,對81組ansys模擬試驗結果數據進行回歸分析,得到有限元法確定樁端極限承載力的回歸公式,並將有限元法回歸公式計算值與現場小壓板載荷試驗值進行比較分析,得到大直徑樁端阻的尺寸效應系數計算公式。
  18. The aim of study is getting through the engineering project successfully. at first, the integral bearing capacity of slts is calculated and analyzed. using precise finite element analysis, operation state of latticed truss structure during the elastic phase can be mastered, and key inspect regions, namely weak enduring region, can be seek through results analysis

    研究工作以工程項目的順利完工為最終目的,所採取的研究路線為先就整個網架結構的整體承載性能出發,通過精確的有限元分析方法掌握結構在彈性工作階段的工作狀態,並通過分析計算結果尋求關鍵監測區域,即網架結構承載的薄弱環節。
  19. And then in detail the paper explains the main technique in sliding construction, which includes jacking scheme, plan layout, assembly, transport and stacking of component, setting of sliding system, setting of track, conformation of falsework, traction facility etc. third, the paper researches on se veral key points which are sum - up about technics flow of sliding construction, the select of falsework by bearing capacity which was calculated through three methods, the theoretic discuss on auto - control, dynamic or static inspect and adjust

    然後對其中的重點問題作進一步的討論,包括滑移法工藝流程的總結;對胎架的選型參考腳手架的計算,運用規范、軟體程序等三種方法進行受力特徵分析,與已有腳手架試驗結果進行比較分析,得出較為符合實際的胎架承載力值;對滑移過程中的自動控制及動、靜態控制監測等做出了應用分析和理論上的探討。
  20. Equivalent calculated capacity

    當量計算排量
分享友人