calculated risk 中文意思是什麼

calculated risk 解釋
預測風險
  • calculated : adj. 1. 有計劃的,有意的,故意的。2. (預備)供…之用的,合於…之用的。3. 算清了的;被預測出的。
  • risk : n 1 風險,危險;冒險。2 【保險】(損失的)風險(率);保險金額;被保險人,被保險物。vt 冒…的危險...
  1. Security program was based on calculated risk.

    保安工作準備冒一定的風險。
  2. The security program was based on calculated risk.

    保安工作準備冒一定的風險。
  3. Submersed land area including different utilizing type by sea water are calculated and the potential economic loss and population affected by the submerged disaster are assessed for no defence , different sea - level rise and high water level. furthermore, special topic maps of fatalness of sea level rise, vulnerability of land system, socio - economic and ecological vulnerability, and defending ability are produced. the following results are combined with the basic study cell based on area source model following mathematical models of risk evaluation, considered of defence or no defence

    運用海平面上升災害危險性、土地系統易損性、社會生態經濟易損性和抗災能力的數學模型,在mapinfo軟體下運行,得到該區上述四種評估因子的專題圖;並分別按照考慮抗災能力以及不考慮抗災能力兩種情況,用海平面上升災害風險評估模型融合各因子,得到遼河三角洲(盤錦市)海平面上升災害綜合風險評估圖。
  4. That left the plant in a dangerously unprotected condition, a calculated risk.

    這使電廠處于危險的無防衛的境地,這是一次有意的冒險。
  5. Based on the theory of risk analysis and fuzzy mathematics, three calculation models of fuzzy risk are established and solution is presented. this solution transforms fuzzy variables into random variables by level cut set so that fuzzy risk can be calculated with traditional risk calculation methods

    從而運用風險分析理論與相關的模糊數學知識建立了模糊風險的三種計算模型,並提出採用水平截集將模糊變量模糊化處理為非模糊量計算模糊風險的求解方法。
  6. What was the last calculated risk you took at work

    你上一次在工作中進行的一個權衡利弊后冒的風險是什麼?
  7. Using the ahp and fuzzy assessment, the weighted value of risk guide line is calculated and assessed ; 4

    採用層次模糊綜合分析法分析了各混批混料風險指標的權重及綜合評價; 4
  8. Example : investing in real estate can be a calculated risk that often favors careful research

    投資房地產的風險是可以估算的,詳盡的研究通常很有效。
  9. With regard to a fair value hedging of interest rate risk portfolio, the relevant items separately presented in the balance sheet shall, during the period from the adjustment date to the relevant date on which the re - pricing period ends, be amortized based on the effective interest rate re - calculated on the adjustment date

    對利率風險組合的公允價值套期,在資產負債表中單列的相關項目,也應當按照調整日重新計算的實際利率在調整日至相關的重新定價期間結束日的期間內攤銷。
  10. Allowing for the effects of the adjustment of tax factor, the change of the capital structure, the liquidity risk and the dynamic variation of fund, the discount rate is calculated on the basis of the wacc model and is finally fixed

    受短期債務長期化、流動負債成本顯現化趨勢影響,在計算折現率時以wacc模型為基礎,考慮稅收因素調整、資本結構變化、流動性風險和資金動態變化帶來的影響,進行量化后確定整體折現率。
  11. On the basis of a full investigation and study and an integrated analysis of the geological setting and rock - mass mechanical environment of the bank slopes of the hydroelectric project area on the mainstream of the jinsha river and by combining the qualitative analysis with the quantitative evaluation, the authors calculated the instability of the sliding masses according to 1 / 8 and 1 / 11 of the total cubic capacity of the materials falling into the river and the surge wave heights at the falling sites as well as at the xiangjiaba and xiluodu dam sites and in adjacent townships according to the calculation method of the surge wave diagram given by the american society of civil engineers, made the risk evaluation of the bank slope instability with respect to the operation safety at the dam, safety of the cities and townships around the reservoir and safety of the reservoir operation, and put forward precautionary measures for bank slope instability

    摘要筆者通過調查研究和綜合分析金沙江幹流水電工程區岸坡地質背景和巖體力學環境條件,定性分析與定量評價相結合,採用與三峽工程庫區岸坡失穩危險性評價相類比的方法,針對崩滑體失穩按總體積的1 / 8和1 / 11入江方量進行了計算和按美國土木工程學會涌浪圖解計演算法計算了入水點及在向家壩壩址、溪洛渡壩址和鄰近城鎮的涌浪高度,並圍繞大壩施工安全、庫區周邊城鎮安全,水庫運營安全等方面對岸坡失穩的危險性進行了評價預測,提出了岸坡失穩的防治對策。
  12. After the lag procedure introduced, the precedence network is transferred into generalized pert network, and then the risk of construction schedule could be calculated with the mc method or the modified pert method

    引入時距工序后,將搭接網路轉化為廣義pert網路,然後用mc方法或用當量概率修正pert方法計算搭接施工網路進度風險。
  13. The model combines simulation method and optimization method to regional water supply and utility system, analyzing long series water supply and demand system with the object of the annual maximum water supply, counting water shortage capacity and its distributing probability, describing water shortage risk with risk character indexes. 4. when the water shortage risk is calculated, the input and output macro - economic model of water resource is employed to evaluate economic losses due to water shortage

    該模型綜合模擬方法和優化方法的優點,在對區域供用水系統進行模擬的同時,採用年最大供水量為目標函數對水資源系統進行長系列的供需分析,然後統計區域水資源系統的缺水量及其概率分佈,同時用水資源系統的風險性能指標對水資源短缺風險進行描述。
  14. Because the standard of the risk type decision is the expectation of the increase and decrease, and increase and decrease expectation was calculated according to state probability and increase and decrease value

    3 、由於風險型決策的標準是損益期望值,而損益期望值是根據狀態概率和損益值計算的。
  15. On the basis of the feature that the calculated parameter of predicting subsidence in dewatered cohesive soil is adapt to interval analysis theory, the risk assessment model and two risk assessment indexes of satisfying different needs were established by using interval theory

    本文基於粘性土降水沉降量計算參數符合區間分析的特點,採用區間理論建立風險評價模型和滿足不同需要的兩個風險評價指標。
  16. The conclusions drawn from two methods are same : vcis is good and can produce significant final result, but the risk calculated from the latter method is larger than that of the former. this is one of source of divergence between lsv ( 1994 ) and fama ( 1995 ) on the reason why vcis can bring in anomalous return

    但在以組合月均收益率為標準時,價值組合的風險大於魅力組合風險,這樣風險溢價對價值投資策略的超額利潤有一定的解釋作用,這正是lsv ( 1994 )和fama ( 1995 )對價值投資策略超額利潤來源的分歧根源之一。
  17. Stock market risk - depending on the closing price of the underlying stock on the stock valuation date, you may receive the interest return calculated at eld interest rate plus the pre - determined number of shares instead of the principal

    股市風險-除以股票掛?存款利息計算之利率收益外,您可能會獲得既定股數的股票,而非本金,這將視乎掛?股票在結算日的收市價而定。
  18. The significance about this paper was expressed. chapter 2 is the main body of the paper, we estimated and calculated the survival probability of a two - insurance risk model ; we acquired the expectation of maximal aggregate loss and the distribution of the supreme surplus before ruin ; at the same time, we discussed multi - insurance risk model in brief. in chapter 3 we briefly reviewed the whole paper and put forward the further tasks

    第一章緒論部分對風險理論及其發展作了回顧,說明將經典風險模型推廣到多險種風險模型的意義所在,並介紹了兩種典型的處理方法和獲得的主要結果;第二章是主體部分,詳細探討了兩險種風險模型生存概率的估計及計算,並得到了保險公司最大損失的一階、二階矩和破產前最大余額分佈,同時也簡略討論了多險種風險模型;第三章對全文作了回顧,提出下一步要做的工作。
  19. By monte - carlo method the flood discharge risk is calculated with consideration of the uncertainty of flood hydrograph, and the result is compared with that without consideration of the uncertainty of flood hydrograph. it is clear that the flood discharge risk is lower when the uncertainty of flood hydrograph is considered

    文章最後用蒙特卡洛法分別計算了此工程在考慮洪水過程不確定性和不考慮時泄洪風險值,比較二者的計算結果,後者的風險值明顯大於前者,這說明,洪水過程不確定性對泄洪風險的影響不可忽略不計。
  20. I took a calculated risk when i bought those shares

    我買這些股票時冒著計算過的風險。