calculating station 中文意思是什麼

calculating station 解釋
計算站
  • calculating : adj. 1. 計算(用)的;有打算的,不落空的。2. 精打細算的,慎重的,為自己打算的。
  • station : n 1 站,臺,車站;航空站,機場。2 派出所;署,局,所。3 【無線電】電臺,電視臺。 4 駐地,部戍地,...
  1. In the study of the lumber carrier, one of the very important problem is the in spot and ultimate station due to flooding which will bring tremendous threat to the ship because of the few holds in order to study the lumber carrier buoyancy, stability and longitudinal strength under the condition of flooding, the paper adopt fundamental ship principle and iterative and accumulative concept on the basis of insumersibility theory to detailedly calculate the flooding speed flooding amount front draft after draft stability and longitudinal strength considering the ship " s sinking and inclination which will change the center of gravity and the loading station both in hold and on deck and the effect of flooding and lumber amount in holdo in the last, the paper introduces an example of the actual ship named " fei yun ling " and makes a contrast between not taking measure and taking measure which draws a reasonable conclusion and comes up to some advice the method avoids the cockamamie calculating while insures enough precision the paper draws a conclusion that not all the lumber carrier will submerge when suffering the damaged flooding if the loading or measure is suitable

    為了研究運木船舶在破艙狀態下的浮性、穩性和強度,本文在抗沉性理論的基礎上,運用船舶基本原理,採用了迭代和累計的思想,將船舶的進水過程劃分為很多次進水的積累,詳細計算了運木船在破艙進水的過程中,考慮到各種破艙參數、船舶本身的下沉、艙室內木材、甲板貨的裝載情況和在進水過程中船舶本身的傾斜對進水重心的影響,以及艙室內的進水量和木材對破口處進水速度的影響,船舶總的進水速度、進水量、首尾吃水、穩性的實時狀態和最終船舶的總縱強度,給出了計算實例,並進行了在採取用泵抽水前後浮態參數的對比,得出了該船舶在艙室內的貨物積載量達到某個數值時可以保證船舶在破艙進水時不會沉沒,或者在當開口小於某數值時,採取適當的措施后,可以使船舶避免沉沒。
  2. In the brief introduction to geographical information system ( gis ), this dissertation proves that by combining reliable management with gis technology, presents a method which built the power structure model and math calculation model by using spatial data in a good interface between computer and user. this dissertation makes a number of target for calculating the distribution system, mainly aimed at circumstances which have an effect on power station repair, switch breaker, type of t connection, and double lines supply via the usage of system reliability calculation. at the same time, it provides the projected estimatio n when power station or transmission line will be added into the power system, and furnishes the theoretical information that the professional needs for power structure programming, design and equipment management

    通過建立輸變電設施管理信息系統( mis ) ,真實地反映出油田電網輸變電設施的運行管理現狀,為網路可靠性計算提供可靠的計算依據;在簡述地理信息系統( gis )技術的基礎上,論證了可靠性管理與電力gis技術結合的可能性,創立了在簡潔的人機圖形界面下利用空間數據建立網路結構模型及可靠性計算模型的方法;通過建立網路可靠性計算系統,進行了計及變電所檢修影響、切換開關、 t接點及雙回線供電情況下的可靠性指標計算分析,對油田電網及變電所(線路)的改(擴)建方案、增強性措施及接入系統的可靠性給予了工程評估,為電網規劃、設計及日常的設備管理提供分析決策依據。
  3. For getting the runner characteristics more correctly, researching the representation of runner characteristics of the kaplan turbine in this paper, and using this method of modifying runner characteristics to calculate the transient of hydraulic power station. improving the calculating model of the axial thrust in the kaplan turbine ' s transient. base on the theory of screw propeller without any boundary, using the theory of screw propeller with pipe, and the formula to calculate the dynamic axial thrust during transient is developed

    本文對轉槳機組在過渡過程中的槳葉劃水產生水推力的數學模型進行了改進,在原來使用無邊界螺旋槳進行等效的基礎上,使用了導管螺旋槳對轉槳機組中的槳葉劃水進行等效,並且比較詳細的分析了影響轉槳機組軸向水推力的各個因素,以及給出了動態計算軸向水推力的公式,通過計算表明,使用改進后的動態水推力計算模型得到的結果能較好的反應實測的動態軸向水推力。
  4. The formula of calculating flood peak at downstream stations according to upstream flood peak at hydrometer station was proposed in this research. in the formula river boundary and flood type factors etc. were main factors and the formula can reflect the impacting factors of flood deformation

    報告給出了由上游水文站洪峰流量計算下游站洪峰流量的計算公式,公式包含有河道條件和洪峰峰型因子,較全面地反映了影響洪水變形的因素。
  5. In the first step. 2861 surface wave recordings with seismic magnitude over 5. 0 are selected under the criteria of good - wave and " intact recording ", calculating the big - circle paths, and then about 284 two - station pairs of which two stations are along the same big - circle are chosen, among them there are about 260 pairs with difference of forward azimuth angle less than 5 ?. after further optimizing, 223 pairs which perfectly cover the china area are used in the final calculation

    本文首先從所收集的震級在5級以上2861條面波記錄中挑選波形好、記錄完整的資料進行預處理,計算其大園路徑,從中挑選出位於同一地震大園路徑上的雙臺地震記錄約284對,然後計算出前向方位角差,其差在5范圍以內的雙臺地震記錄約260餘對,量后對這些記錄進一步優化,選出223對對中國大陸地區覆蓋比較好的面波記錄。
  6. At last, through analysis on calculating results and comparison among operational schemes, it is concluded that if pull - in steady operation of pump unit can be successfully realized, then it provides the reasonable suggestions for design and operation of pump station

    最後,通過對計算結果的分析及運行方案對比,判斷機組能否順利牽入同步和揚水,最終進入穩定工況運行,從而為泵站的設汁及運行提出科學合理的建議。
  7. 4. combined with the design of the three gorges prestressed concrete penstock with steel liner in the three gorges power. station, the consistence among the results of theory calculating, the analysis of plane finite element and three dimensional finite element is proved, the concrete stress distributions of the prestressed concrete penstock are analyzed with different steel liner thicknesses, different crack resistances, different concrete thicknesses and different initial radial gaps between steel liner and concrete. the feasibility of the design method of prestressed concrete penstock with steel liner is proved

    結合三峽電站鋼襯預應力混凝土聯合受力壓力管道的設計方案選擇及論證分析,對比分析了鋼襯預應力混凝土壓力管道理論計算、平面有限元和管壩整體三維有限元分析結果的一致性,確定了管道結構在不同鋼襯厚度、不同抗裂度要求、不同外包混凝土厚度及不同鋼襯與管壁混凝土間初始徑向間隙等因素影響下的內力分佈規律,驗證了鋼襯預應力混凝土壓力管道的設計方法。
  8. Displacement function means for calculating geostress in fem analysis of underground houses is used, based on crustal stress data of underground cavern of pump water station of tong guanshan yixing to store energy, applying the displacement function theory and 3d nonlinear fem, the thesis simulates a displacement field applied the boundary in engineering area and obtain the initial crust stress field through load function in ansys. the result shows that the error between regressed ones and actual ones is controlled in allowed limit and supply the important data for building and design

    根據宜興銅官山抽水蓄能電站地下廠房區的地應力實測資料,運用位移函數法理論,採用三維非線性有限元計算方法,反演出施加在廠房區邊界上的位移場,藉助州sys有限元分析軟體,獲取模型邊界節點的坐標信息,然後通過ansys軟體的載荷函數將邊界位移程序化施加到模型邊界上,最後得到整個區域的初始地應力場,結果表明回歸后的地應力值與實測值接近,為地下工程的施工設計提供了重要的資料。
  9. In order to calculate the high external water pressure, the rock seepage field and external water pressure coefficient should be treated in detail. concentrated on the questions of high external water pressure and flow of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied, the high external water pressure of jinping cascade 2 hydropower station is analyzed and studied in detail

    本文在總結前人研究成果的基礎上,圍繞深埋隧洞的突涌水和高外水壓力問題,系統地研究了深埋隧洞襯砌水荷載和外水壓力的作用機理及計算方法等理論,並對錦屏二級水電站深埋引水隧洞的外水壓力問題進行了詳細的分析和研究。
  10. ( 2 ) the method of finite element discrete and optimal parameter back analysis is adopted. ( 3 ) concentrated on the question of high external water pressure of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied. ( 4 ) based on jinping cascade 2 hydropower station, numerical simulation rain infiltration of seepage field under different drainage pattern and grouting pattern are studied, also, the high external water pressure is analyzed and studied and some seepage control measures are put forward

    ( 2 )採用有限元離散?優化法進行參數的反演分析; ( 3 )針對深埋隧洞的高外水壓力問題,進一步分析和研究了襯砌水荷載及外水壓力的作用機理和計算方法; ( 4 )以錦屏二級水電站深埋長引水隧洞作為本文的主要研究對象,採用考慮降雨入滲滲流場分析的方法對排水方案和灌漿封堵方案不同情況下的滲流場的水頭分佈進行了數值模擬,並對其外水壓力進行了分析和研究,提出了滲流控制的具體措施。
  11. It can report the exerting degree of the automobile ’ s performance between the real working station and the ideal working station of the engine, furthermore, it evinces the potence and the way to improve the power performance and the economy performance. then summarizes the calculating methods of the power performance and the economy performance, which can be realized by the computer easily. introduces the mathematic model of the automobile power train

    本文首先對現有汽車動力性與燃油經濟性評價指標進行論述和分析,並提出了一套綜合評價汽車動力性燃油經濟性的指標體系,這些評價指標的確定,解決了以往評價指標的不適宜性,更好地反映了汽車動力性、燃油經濟性的發揮程度。
  12. He has published such thesis as application of monte carlo method for calculating lock base filtration , numerical simulation of three - dimensional turbulent flow in forebay of pumping station , the classification of braided reach by fuzzy clustering, etc

    發表了《用蒙特卡羅方法求解船閘地基滲流》 、 《泵站前池流態的數值模擬》 、 《天然河流分汊河段河型模糊聚類分析》等研究型論文。
  13. The fortran 90 calculating program of the waterhammer pressure in intricate pipe systems of water power station has also been gived on the visual fortran background compiler

    在visualfortran編譯平臺上,利用fortran90語言編制了水電站復雜壓力管道水力瞬變水擊的數值計算程序。
  14. This paper first analyzes the characteristics on train working diagram of urban rail transit, on the basis of describing property on rail line of urban rail transit, this paper puts forward theory of two stations drawing and three stations drawing which taking the setting of vehicle depots as the core of the subject designs sequence and contrary advance calculating methods to calculate the train arrival and departure time at mediate station, and builds mathematic model on the train working diagram of urban rail transit taking same interval time of train traveling as the target function

    摘要在對城市軌道交通線路屬性進行數學描述的基礎上,以車輛段設置地點為核心,提出兩站圖及三站圖理論,設計分層順序和反序推點演算法計算列車在中間站的到發時刻,並以分時段列車等間隔運行為目標函數,構建城市軌道交通列車運行圖通用數學模型。
  15. Fuzzy mathematics treatment method is introduced for the large amount of fuzzy information mathematics treatment method is introduced for the large amount of fuzzy information involved in the performance state evaluation of pumping station electromechanical equipment with the experiences of the experts and operators, thus the evaluation indications are quantified, measured and evaluated through reasoning model and satisfaction calculating model, with which, the comprehensive satisfaction of pump unit is determined and provides a basis for the rational decision - making of unit commitment

    針對泵站機電設備性能狀態評價中涉及到大量的模糊信息,引入模糊數學的處理方法,利用專家和運行人員的經驗,對評判指標進行量化、度量和評判,通過推理模型和滿意度計算模型,得出機組的綜合滿意度,在此基礎上,對機組的啟停進行合理決策。
  16. According to the fact of the oil field, the paper studies the feasibility of applying heat pump during the process of production in the oil field, offers the material designing and calculating methods and the example of the heat pump ' s technology applying in the southern tenth united station of oil recovery plan no. 2, daqing oil field corp. ltd.

    本文根據油田生產實際,研究了油田生產中應用熱泵的可行性,給出了具體的設計計算方法及熱泵技術在大慶採油二廠南十聯合站的應用實例。本文還對用熱泵技術回收電廠循環水低溫余熱進行了研究,給出了方案圖,並對電廠用熱泵裝置進行了詳細的設計計算。
分享友人