cap beam 中文意思是什麼

cap beam 解釋
帽梁
  • cap : n 1 無邊帽,便帽;制服帽;軍帽;頭巾。2 鞘,(筆)套,蓋,罩子;(鞋)尖。3 【建築】柱頭;【礦物...
  • beam : n 1 梁,棟梁,桁條;(船的)橫梁。2 船幅;(動物、人的)體幅。3 (秤)桿,杠桿,(織機的)卷軸,...
  1. In addition, the computer method is proposed to get the stochastic pile capacity and the random optimum analysis is done in virtue of the genetic algorithm which can easily think over the influence of the randomness of pile capacity on the internal force of capping beam based on the thorough analysis about the primary factors influencing the randomness of pile capacity. an optimization program is worked out for the analysis which can consider the pile - soil - cap interaction and the non - linear character of the foundation soil

    此外,本文對影響基樁承載力差異性的主要因素進行了深入分析,提出了基樁承載力隨機生成的計算機方法,並採用遺傳演算法對承臺梁內力進行隨機優化分析,可方便地考慮基樁承載力隨機性對承臺梁內力的影響,並開發出能考慮樁?土?承臺共同工作及地基土非線性特性的樁基承臺梁內力優化分析程序。
  2. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪錨筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用鋼筋砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  3. H beam cap

    工字鋼頂梁
  4. It was shown that the measured active soil pressures were smaller than the theoretical values and diminished with time, the measured pore water pressure decreased with the time and increased with the depth of soil, the combinative effects of cap girder and supporting structure were obvious which diminished the displacement of foundation pits, and the measured axial force of the anchor and interior steel beam were far less than the design force, indicating that the design safety factor of the foundation pit was too large to be economical

    基坑工程實行信息化施工並獲得了豐富的監測數據,通過對數據分析結果表明:實測主動土壓力小於計算主動土壓力,實測主動土壓力隨時間延長變小:土體中孔隙水壓力隨時間增長而減小,孔隙水壓力隨深度增加而呈非線性增加;基坑冠梁協同作用明顯,冠梁減小了基坑變形;錨索軸力比較穩定,鋼撐軸力變化相對較大,且二者軸力仍富餘較大,該設計比較安全。
分享友人