capacity bridge 中文意思是什麼

capacity bridge 解釋
電容電橋
  • capacity : n 1 包容力,吸收力,收容力。2 容積,容量;【電學】電容,負載量。3 能力,才幹,本領;性能,機能。4...
  • bridge : n 1 橋,橋梁;【造船】艦橋,船橋。2 鼻樑;(假牙上的)齒橋;【音樂】弦柱,弦馬;【電學】電橋;【...
  1. Under the background of a long - span rigid - framed flexible cfst arch bridge, the catholicity method to compute the ultimate capacity is brought forward

    以某大跨度剛性梁柔性鋼管硅拱橋為例,總結了具有較普遍意義的大跨度橋梁極限承載力計算方法。
  2. Capacity analysis of rc bridge phase discriminator

    橋式相位鑒頻器的性能分析
  3. From roundwood reservoir in county wicklow of a cubic capacity of 2, 400 million gallons, percolating through a subterranean aqueduct of filter mains of single and double pipeage constructed at an initial plant cost of 5 per linear yard by way of the dargle, rathdown, glen of the downs and callowhill to the 26 acre reservoir at stillorgan, a distance of 22 statute miles, and thence, through a system of relieving tanks, by a gradient of 250 feet to the city boundary at eustace bridge, upper leeson street, though from prolonged summer drouth and daily supply of 12 1 2 million gallons the water had fallen below the sill of the overflow weir for which reason the borough surveyor and waterworks engineer, mr spencer harty, c. e., on the instructions of the waterworks committee, had prohibited the use of municipal water for purposes other than those of consumption envisaging the possibility of recourse being had to the importable water of the grand and royal canals as in 1893 particularly as the south dublin guardians, notwithstanding their ration of 15 gallons per day per pauper supplied through a 6 inch meter, had been convicted of a wastage of 20, 000 gallons per night by a reading of their meter on the affirmation of the law agent of the corporation, mr ignatius rice, solicitor, thereby acting to the detriment of another section of the public, selfsupporting taxpayers, solvent, sound

    但是由於夏季久旱,再加上每天供水一千二百五十萬加侖,水位已降到低於排水口。都市監察官兼水道局技官土木工程師斯潘塞哈蒂奉水道局的指示鑒于有可能會像一八九三年那樣被迫利用大運河和皇家運河那不宜飲用的水,除了飲用外,下令一律禁止使用市裡供應的自來水。尤其是南都柏林濟貧院,盡管限定用六英寸的計量器,每個貧民每日配給十五加侖水,然而在市政府法律顧問辯護律師伊格內修斯賴斯的監督下,經查表證實,每夜要浪費兩萬加侖水,從而使院外的社會各階層也就是自費並有支付能力的納稅者們蒙受損害。
  4. The research information of the slab that has been used for forepassed decades is extremely few. there is a lack of the method of calculating load bearing capacity of slab with slightly curved bottom in our bridge criterion

    在過去的幾十年中,微彎板的研究資料極少,我國橋梁規范中尚無微彎板的承載力的確定方法。
  5. As the commonly used foundations in the bridge engineering, large - diameter bored piles have many advantages, such as high bearing capacity, good stability, little and homogeneous vertical settlement, facility for mechanician construction and good applicability

    樁基礎是一種常用的橋梁基礎型式,具有承載力高、穩定性好、沉降量小而均勻、便於機械化施工及適用性強等特點。
  6. This paper discusses the typical method of the research of the scathe of the bridge, conclude and analyze the evaluation of the carrying capacity after the bridge scathe, and indicate the study way of the scathe of bridge in the future

    摘要探討目前對橋梁損傷研究的幾種典型方法及其適用性,並對橋梁損傷后的承載能力的評估方法進行了歸納和分析,並指出橋梁損傷研究所遇到的問題和未來的研究方向。
  7. Based on the destructive test of certain old pre - stressed concrete hollow slab after structural strengthening by cfs, the destructive mechanism and ultimate bearing capacity of old pre - stressed hollow slab after structural strengthening is being researched, which is useful for the strengthening design of old bridge and solvating of single slab problem

    摘要通過某已使用10年的舊橋預應力混凝土空心板受拉區碳纖維布加固后的破壞荷載試驗研究,對受拉區加固后的舊橋預應力混凝土空心板的破壞機理、變形性能及極限承載能力等進行了研究,為舊橋預應力混凝土空心板的加固設計及單板受力問題的分析解決提供了試驗依據。
  8. With the improvement of loading grade and extension of service year, the structural disease in bridge increases continuously. as a result, the loading capacity of bridge degrades gradually and the function of service deteriorates year by year

    隨著交通荷載等級的不斷提高,橋梁服役年限的不斷延長,橋梁結構的病害不斷增多,橋梁結構的承載力不斷降低,使用性能逐年惡化。
  9. On the basis of practice and checkout of stylebook, the feasibility of evaluating the highway bridge ' s carrying capacity based on bp neural network is proved

    通過樣本的訓練和檢驗,驗證了利用bp神經元網路理論進行橋梁承載力評估的可行性。
  10. It also has important reference value for the similar construction. by the safety and seismic evaluation of this aqueduct bridge, it has shown that ( 1 ) besides the structure of this aqueduct bridge was basically unharmed without some flake of concrete cover and revealing stirrup, its intensity basically reached the need of primary design. ( 2 ) from the side of carrying capacity, rib arch could satisfy the needs under the action of wind and earthquake, but some individual frame crossbeams and most rib arch tie beams could n ' t satisfy the need

    通過對東滑峪渡槽進行安全性能和抗震性能評估后表明: ( 1 )渡槽除肋拱頂面有保護層剝落、箍筋外露,結構基本完好,其強度基本達到西安理工大學工程碩士專業學位論文原設計的強度要求; ( 2 )從承載力方面看,在風荷載、地震作用下,肋拱基本滿足要求,個別排架橫梁不滿足要求,肋拱連系梁普遍不滿足要求;計入水平橫槽向地震作用的工況為設計控制工況。
  11. The paper recites the development, current situation of the ship maneuvering simulator and advantage of the ship maneuvering simulator to demonstrate the designs of harbor and fairway, mainly analyzes the application prospect of the ship maneuvering simulator for the demonstration of the designs of harbor and fairway, which points out a direction for the application of our country " s ship maneuvering simulator. on top of it, author combining a material application example " simulation for assessing the navigation capacity of sutong changjiang road bridge " that author took part in to simulate personally, depicts the whole steps about applying the ship maneuvering simulator to demonstrate the designs of harbor and fairway, which proves the great advantage of the ship maneuvering simulator for the demonstration of the designs of harbor and fairway, then discusses the steps and ways about applying the ship maneuvering simulator to demonstrate the designs of harbor and fairway

    本文從船舶操縱模擬器的發展、應用現狀著手,依託船舶操縱模擬器在港航設計論證上的應用優勢,重點論述了船舶操縱模擬器在我國港航設計論證上的應用前景,為我國的船舶操縱模擬器的應用研究指明了方向;緊接著結合作者參加的具體的港航論證項目「蘇通長江公路大橋船舶通航論證模擬」 ,敘述了運用船舶操縱模擬器進行港航設計論證的整個具體流程,用實例證明了運用船舶操縱模擬器進行港航設計論證的巨大優勢;在此基礎上,探討了運用船舶操縱模擬器進行港航設計論證的具體步驟與方法。
  12. In this dissertation, the structure bearing capacity reliability of the ecardinal arch - bridge is researched by structure reliability theory and its reliability assessment model on bearing capacity is established

    本文依據結構可靠度理論,對在用拱橋(本文主要針對無鉸拱橋)的承載力可靠度進行研究,給出其結構承載力可靠度評估模型。
  13. The system reliability analysis method of arch - bridge is presented based on the failure model of arch rib, which is the most important failure model of arch - bridge. the control sections of arch rib in the analysis of bearing capacity reliability are determined according to the " five - spot coincidence method ", which is often used in arch - bridge design with chinese code

    針對拱式橋結構體系中的主要受力構件?拱肋進行分析,借鑒拱橋設計中的「五點重合法」確定研究截面,進而根據該截面的不利情況確定荷載布置型式。
  14. The representative failure models of arch rib are searched and the rib section resistances are calculated by incremental method and disadvantage loading in the control sections. the structure reliability assessment index on bearing capacity of the arch - bridge is calculated by the function of bearing capacity reliability, structure resistance probability model, load action effect probability model and jc method

    對每種荷載布置型式,採用荷載增量法進行拱橋結構失效模式的尋找和截面抗力的計算,給出其承載力可靠度功能函數,推導功能函數中結構抗力和作用效應概率模型,並利用改進的一次二階矩法計算在用拱橋承載力可靠度指標評估值。
  15. Pile - net composite foundation has some merit in building up the reinforcement of composite foundation simultaneous in vertical and horizontal directions, in enhancing the bearing capacity of foundation soil, and minishing the non - uniform settlement, especially controlling the phenomenon of vehicle dumpping on bridge head in the foundation treatment of transitional segments which is proved by practice

    摘要實踐證明,樁網復合地基同時具備豎向增強體復合地基與水平向增強體復合地基的加固優點,能很好地提高地基土體承載力,減小不均勻沉降,特別是橋頭過渡段地基處理中能有效控制「橋頭跳車」現象的產生。
  16. By maintaining and strengthening, the existing fault bridge strengthened the total intensity and rigidity of the main girder, to large extend. the strengthened bridge could lengthen its service life and made deck line state, ultimate bearing capacity and durability, and so on, attain to design standard

    對既有病橋進行加固維護,能大大地增強主梁的整體強度、剛度,延長橋梁的使用壽命,使其橋面線形、極限承載能力和耐久性等達到設計要求。
  17. According to the load behavior and defection degrees of existed reinforced concrete bridge, the calculating modeles for normal section strength and bearing capacity for reinforced concrete bridge are established by the elasticity analysis and nonlinear analysis of grade stiffness degeneration

    根據既有鋼筋混凝土橋梁的受力特點和損傷程度,採用兩種方法:即《規范》法分析理論和分級剛度退化非線性分析理論,分別建立了既有鋼筋混凝土橋梁正截面強度計算和承載能力評定的計算分析模型。
  18. However, along with the increasing of construction quantity of the infrastructure of irrigation works, traffic, communication etc., newer and higher requirement of geotechnical anchoring are made in slope, major dam, bridge, tunnel, deep foundation ditch engineering and the construction engineering such as anti - capsize, anti - float, anti - slippage engineering of the buildings. for example, self - intension of rock and soil is required to exploit better ; carrying capacity of anchor increase according to anchoring length ; anchor should be sufficiently lasting and should not influence the exploitation of adjoining stratum

    但另一方面,隨著我國水利、交通、通訊等基礎設施建設力度的加大,邊坡、大壩、橋梁、隧洞、深基坑以及建築結構物的抗傾倒、抗浮力、抗滑移等建設工程將對巖土錨固提出一些新的和更高的要求:如要求進一步調用巖土體的自身強度,錨桿應具有足夠的耐久性,錨桿的使用應不影響周邊地層的開發等。
  19. Answer : be familiar with concerned regulations system and line bridge business, have the capacity that handles trouble alone, temporarily relay personnel should be secured, pass labour wu paragraph approval

    答:熟悉有關規章制度及線橋業務,有單獨處理故障的能力,臨時替班人員應固定,並經過工務段批準。
  20. The paper ' s objective is to quest a proper approach to detect bridge load capacity bridge damage

    本文研究的目的就是探索一種恰當的確定橋梁承載能力和破損情況的方法。
分享友人