capital construction project 中文意思是什麼

capital construction project 解釋
基本建設工程
  • capital : adj 1 首位的,最重要的,主要的,基本的,根本的。2 〈口語〉優秀的,上好的,第一流的。3 大寫(字母...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. To examine and ratify some workable reports, including the annual plan ' s management 、 investment 、 transforming 、 capital construction project and circulating capital ' s loan 、 use and credit - guarantees

    健全財務管理,嚴格財經紀律,搞好增收節支和開源節流工作,保證現有資產的保值和增值。
  2. Controlling approach to the project cost in the prophase of capital construction

    工程造價在基本建設前期的控制途徑
  3. This essay focuses its study and comparison on the tendering system of international financial organization, raises the necessity of foreign loan tendering system, considering the existing tendering situation in fields of capital construction, mechanical equipment, imported electrical and mechanical equipment, government purchasing and foreign loan purchasing, and gives constructive views in tendering and bidding procedure of project construction agencies and construction supply enterprises, so as to improve the construction level of the foreign loan projects in our country, increase the bidding ability of our enterprises for participating international projects, and promote the establishment and improvement of the tendering and bidding management system in our country after learning from tendering purchasing system abroad

    本文主要研究和對比國際金融組織的招標制度,結合我國在基本建設項目、機械成套設備、進口機電設備、政府采購、國外貸款采購等領域的招標投標現狀,提出研究國外貸款招投標制度的必要性並結合實際工作經歷,為我國項目建設單位和貨物與工程供應企業在招標投標環節提出建設性意見。以期提高我國利用國外貸款項目的建設水平,提高我國的企業參與國際工程投標能力,並借鑒國外招標采購制度,加快我國招投標管理體制的建立和完善。
  4. The article discussed deeply about the problems presenting in the fluorine monitoring on environmental protection in aluminum plant capital construction project, which including nomenclature, flue gas, dust, fugitive emission, soil and plant monitoring for fluorine

    摘要文章針對鋁業驗收監測工作中氟監測存在的概念不清、標準使用以及煙氣和煙塵中、無組織排放監測、土壤和植物的氟監測等方面進行了詳細的闡述。
  5. Basis " urban commodity house opens to booking administrative measure " ( 2004 edit ) regulation, commodity house opens to booking ought to accord with the following condition : 1, already pay is full gold of land access sell one ' s own things, obtain land access letter ; 2, licence of program of hold construction project and construction permit ; 3, by offer the commodity house calculation that open to booking, the capital that devoted development builds achieves the 25 % above that project always invests, had fixed construction schedule and complete due date

    根據《城市商品房預售治理辦法》 ( 2004修訂)的規定,商品房預售應當符合以下條件: 1 、已交付全部土地使用權出讓金,並取得土地使用權證書; 2 、持有建設工程規劃許可證和施工許可證; 3 、按提供預售的商品房計算,投入開發建設的資金達到工程建設總投資的25 %以上,並已經確定了施工進度和竣工交付日期。
  6. Our corporation adopts the idea of serving overall. in order to improve the environment for invest, our corporation allocates funds in capital construction, construction of water control project facilities

    本公司樹立服務于全局的觀念,為改善洞涇鎮的投資環境,公司主動出資用於鎮的市政、水利設施建設,同時建立了洞涇鎮外來人口服務中心等一系列造福於人民,造福于社會的工程及設施。
  7. Investment in capital construction : : capital construction refers to the new construction projects or extension projects and the related work of the enterprises, institutions or administrative units mainly for the purpose of expanding production capacity or improving project efficiency

    更新改造投資:更新改造是指企業、事業單位對原有設施進行固定資產更新和技術改造,以及相應配套的工程和有關工作(不包括在修理和維護工程) 。
  8. The artide, the process contrd in construction project, analyzed the inner aned outer environment of the construction enterprise, considered the advanced managing experience of some construction enterprises in and out of china, researched the managing theories and summarized the practice experience from project cost contrd, progress contrd, quality contrd and capital contrd, and tried to find an efficacious way to superintend the process of the construction, the article indude five parts : 1. the necessity and strategic significance of carrying out the contructinn project process contrd. 2. the current situations and main problems of the project process contrd in china. 3. the experience of the project process contrd in and out of china, and the revelation for us. 4. the methods and contents of enhancing the project contrd in enterprise, include the methods and contents of the project cost contrd, highlighting quality contrd and improving quality standard, highlighting quality contrd and improving quality standard, the contrd of project planning progress and resource management, strengthening financial management and increasing the profits. 5. speeding up the reform of the project control institution, improving the scientific and efficacious managing institution, improving the scientific and efficacious managing institution, and some key respects in the project management process

    所有者缺位,企業沒有真正地建立起現代企業制度,決策缺乏科學性,人本管理、企業文化建設、制度建設沒有真正地的落到實處,企業的經營權力過分集中,經營者負盈不負虧,拼資源的現象普遍存在,管理水平不高,盈利能力較弱,競爭能力不強,人員素質較差,是大部分國有企業內部的通病。 《施工項目過程式控制制》這篇文章,通過對施工企業所處內外環境的客觀分析,結合國際國內的一些施工企業的先進管理經驗,從項目成本控制,進度控制,質量控制,資金控制等方面進行理論探索及實踐總結,力爭找出一條有效監控施工企業施工過程的成熟的管理之路,全文共分五個部分:一、實施施工項目過程式控制制的必要性及其戰略意義。二、當前我國項目控制的現狀及其存在的主要問題。
  9. Article 13 : if the donor is to donate assets to build a public welfare project, the donor is required to reach a donation agreement with the recipient on the capital, construction, management, and use of the project

    第十三條捐贈人捐贈財產興建公益事業工程項目,應當與受贈人訂立捐贈協議,對工程項目的資金、建設、管理和使用作出約定。
  10. Reason and countremeasure on capital construction project investment out of control at institutes of higher learning

    來自長樂市的調研與思考
  11. Finally, the thesis establishes post evaluation index system, analyzes its index connotation and hierarchy structure and studies its index sequence and weight with ahp method by studying the characteristics, functions and bases of post evaluation of the investment project of the capital construction in universities and colleges, therefore providing a quantitative analyzing method for implementing post evaluation of the project in universities and colleges

    第三,通過研究高校基本建設投資項目后評估的要求和作用,建立了后評估指標體系,分析了指標內涵及其層次結構,運用層次分析法研究了指標排序及權重,為高校進行項目后評估提供了一種量化分析方法。
  12. Compilation rules of final account for completion of water capital construction project

    水利基本建設項目竣工.財務決算編制規程
  13. In the paper, the author analyzes the present situation of engineering project management for capital construction in our country ' s scientific research institute, compares different kinds of consulting companies and points out their advantages and disadvantages, discusses why it is immature to commit the engineering management to the turnkey service provided by consulting companies from the aspects of building trades, law, institution, rules and so on

    本文以gd研究所工程項目管理為代表,分析科研院所工程項目管理的現狀,比較現行各種類型工程項目管理公司的優劣,從建築行業以及法律、制度、規范等諸多方面,對為什麼不具備委託工程項目管理公司進行管理承包服務的問題進行了分析。
  14. At present stage, it is limited by the objective conditions to introduce consulting company to provide turnkey services for engineering management. improving investment benefits and seeking a rational balance among the construction period, quality and cost of project are the primary problems which the capital construction management department is facing with in scientific research institute

    現階段通過工程項目管理公司實行管理承包服務還受到一定的客觀條件的限制,如何發揮投資的效益,在工期、質量、成本上達到一個合理的平衡點,成為現階段科研院所基建管理部門面對的主要問題。
  15. Where such enterprises as whose projects are listed by the municipal committee and government as the key newly - started projects of the year, and with capital for actual foreign investment more than 5 million us dollars, the enterprises in question shall be granted as a support the same sum as such fees for urban infrastructure support, noise and sewerage, construction of the relocation of the people ' s air defense facilities, land and water facilities compensation, by - product price adjustment fund, bulk cement special fund as are collected within the authorities of the city government ; enjoy half reduction on the engineering quality supervision charge ; and the charges on land evaluation, construction project transaction service, planning techniques service, house - measuring and drawing shall be collected per 50 % of the lower limit of charge collection standards

    第四條:凡被市委、市政府列為年度新上重點項目且外資實際投入資金500萬美元以上的企業,給予本市權限內收取的城市基礎設施配套費、噪聲排污費、人防設施易地建設費、水土設施補償費、副食品價格調節基金、散裝水泥專項基金等額資金扶持;減半收取工程質量監督費;對土地評估費、建設工程交易服務費、規劃技術服務費、房屋測繪費按收費標準下限的50 %收取。
  16. As highway construction project, in fund operation, it is a new program that is worth for us to study that how to position, how to select financing channel, how to reduce investment efficiently and realize profit and loss goal etc based on above - mentioned knowledge, the author goes on thorough analysis taking highway project capital construction as background

    作為公路建設項目,在資金經營中如何定位,如何選擇融資渠道,如何有效降低投資額,實現盈虧目標等,是值得我們研究的新課題。
  17. The paper introduces the fundamental of tot - bot first, and then does the feasibility of the model to a nalyze wnether it could be used in shaanxi road project ; furthermore, the primary study on the risk management of the model is done. finally, the paper draws the following conclusions : 1 ) the combined model has the advantages of both tot and bot, it can not only activate the fixed assets but also promote the finance of intent projects ; 2 ) faced with the problems of capital shortage and simplified finance model, shaanxi province has a increasing invest demand in the road construction area. it is confirmed that the application of the model tot - bot is feasible to the road construction project of shaanxi by analysis ; 3 ) in the market risk evaluation of the road project, to introduce bayesian theory is both scientific and feasible, which is applied to the risk evaluation of the traffic prediction

    論文首先論述了tot - bot融資模式的基本理論,並對陜西省公項路項目採用tot - bot方式建設的可行性進行了分析,初步探討了採用tot - bot方式建設的融資模式設計與風險研究,並得出以下結論: ( 1 ) tot與bot結合而以bot為主的融資模式tot - bot ,兼備了兩種融資方式的優點,既盤活了固定資產又促進了政府待建項目的融資; ( 2 )當前陜西省公路建設項目投資需求大,同時又面臨資金不足而融資渠道單一等問題,通過分析認為嘗試將tot - bot項目融資方式應用於陜西省公路建設項目是可行的; ( 3 )在公路項目採用tot - bot方式建設的市場風險評價中,採用貝葉斯推斷理論來對交通量預測的風險進行評價是科學的、可行的。
  18. When submitted for approval according to the procedures set by the state for capital construction, the feasibility study report of the construction project should include the flood impact assessment report having been examined and approved by the relevant water conservancy administrative department

    建設項目可行性研究報告按照國家規定的基本建設程序報請批準時,應當附具有關水行政主管部門審查批準的洪水影響評價報告。
  19. Inner audit of capital construction project item of group company

    集團公司基建工程項目內部審計
  20. For industrial enterprise investment, the fee of capital construction project planning consultant shall be exempted and a 50 % reduction of auxiliary cost of construction of small towns should be granted

    投資工業企業的,基本建設項目免收規劃咨詢費,小城鎮建設配套費減半徵收。
分享友人