carrying capacity of crane 中文意思是什麼

carrying capacity of crane 解釋
吊車起重能力
  • carrying : adj. 1. 裝載的。2. 運送的,運輸的。n. 1. 運送,運輸。2. 【紡織;印染】墊紗,給線。
  • capacity : n 1 包容力,吸收力,收容力。2 容積,容量;【電學】電容,負載量。3 能力,才幹,本領;性能,機能。4...
  • of : OF =Old French 古法語。
  • crane : n 克蘭〈姓氏〉。n 1 鶴;〈口語〉蒼鷺,鷺鷥,鸛;〈C 〉【天文學】天鶴座。2 起重機,吊車,攝影升降...
  1. It is inevitable that some crane ' s parameter such as working temperature, actual span and so on will change because of the affection of install precision, the change of working condition and actual needs. as a result, it will affect the tension force of carrying cable and carrying capacity. and the tension force and carrying capacity have close relation to the performance of cable crane and operational security

    由於纜索起重機工作環境和性質的特殊性,安裝精度的影響、工作環境的變化以及實際工作的需要,不可避免的會引起的各項參數的變化,如工作溫度,實際的跨度等,造成與設計參數之間的差異,從而影響承載索的張力和承載能力,因而直接關繫到起重機的性能和生產的安全性,因此論文研究這些因素變化對張力和承載能力產生的影響,分析張力及承載能力對各因素變化的靈敏度,從而對生產實踐和安全生產作出有意義的指導。
  2. Dynamic test has been performed on three strengthened girders after they were being put into service. according to the measured data from the dynamic test and the calculated results of the proportion of the load distribution on steel diagonal braces and steel crane girders as well as the increased carrying capacity after strengthening in consideration of the principle of cooperative work between braces and crane girders, the feasibility, rationality, and economy of this strengthening scheme have been verified. this scheme can be applied extensively to strengthen crane girders system including concrete crane girders system hereafter

    最後結合對已經加固施工並投產使用的3榀鋼吊車梁的現場實際動測結果,按考慮下部鋼斜撐與鋼吊車梁二者協同工作的原理對鋼吊車梁與下部斜撐之間的荷載分配比例以及加固后鋼吊車梁的承載能力進行了進一步的計算驗證和對比分析,論證了採用鋼斜撐方案加固已有鋼吊車梁的合理與有效性。
  3. And it investigates the appearance condition ( including joint, crack, eroding, corrosion, braking pole device rupture, crane - girder ' s gnawing railway and so on ) of the whole crane - girder system on the spot, at the same time, it also actually examines the stress of the beam, chemical ingredient, distortion and railway excursion, etc. through sampling, and based on the actually examined results, it checks and calculates the carrying capacity of crane - girder system. then, based on the investigating on the spot and the calculated result, it discusses the mechanism of fatigue failure of the upper part of welded steel crane - girder, analyses the reason of steel crane - girder in the high - frequency emerging the fatigue crack, institutes the strengthened method of damaged steel crane - girder of accurate packing up workshop of the primary mill plant. finally, it presents some advice and suggestions for the repairing and strengthening method of fatigue crack of upper part of steel crane - girder in the high - frequency

    針對包鋼初軋廠精整車間鋼吊車樑上部區域出現裂縫這一問題,本文首先綜述了國內外關于焊接鋼吊車樑上部區域疲勞裂縫的研究現狀;其次對整個吊車梁系統的外觀情況(包括連接、裂縫、腐蝕、銹蝕、制動桿件斷裂、吊車啃軌等)進行了現場調查,抽樣實測了梁的應力、化學成分、變形及軌道偏移等,根據實測結果,對吊車梁系統的承載能力進行了驗算;然後,根據現場調查及計算結果,探討了焊接鋼吊車樑上部區域疲勞破壞的機理,分析了重級工作制鋼吊車梁出現疲勞裂縫的原因,制定了初軋廠精整車間破損鋼吊車梁的加固方案;最後就重級工作制鋼吊車樑上部區域出現疲勞裂縫的修復與加固方案提出了一些意見和建議。
分享友人