cascade cascade method 中文意思是什麼

cascade cascade method 解釋
級聯法
  • cascade : n 1 (陡巖落下的)瀑布;【園藝】人工瀑布。2 瀑布狀物;波形花邊。3 【物理學】級;級聯,串聯;【無...
  • method : n 1 方法,方式;順序。2 (思想、言談上的)條理,規律,秩序。3 【生物學】分類法。4 〈M 〉【戲劇】...
  1. Built up the optimal compensation regulation model of cascade hydropower stations for water resources system in the main stream of the yellow river, adopted poa method to solve optimal model in order to analysis water supply and generation electricity compensation benefits, discussed its distribution project and implementation countermeasures

    本論文主要針對黃河幹流水資源系統建立幹流梯級水庫、電站補償調節優化模型,採用逐步優化演算法( poa )求解模型,定量分析計算了黃河幹流水量以及電量補償效益,探討了黃河幹流補償效益的分配方案和實施對策。
  2. In this thesis, adopting compressible navier - stokes equations and compressible k - - e turbulence double model, studied 2d viscous flow field in wet turbine ' s separate - stage. coordinate transformation is made for the navier - stokes equations by using body fitted coordinate system, moreover, the flow field in 2d cascade is calculated by using the well - established simple method

    本文採用可壓縮氣體的n - s方程,並採用可壓縮的-湍流雙方程模型,研究了飽和汽輪機分離級內二維粘性葉柵流場,採用貼體坐標系對n - s方程進行了坐標變化,並利用成熟的simple演算法對二維葉柵內的流場進行了計算。
  3. Combined with the significant project - gongboxia hydro - power station construction, emphasized on construction during flood period of power station construction period, the climate character of the upstream of yellow river basin and the practice operation state of cascade reservoirs are analyzed, some problems in construction during flood period such as flood propagation time, interval flood discharge forecast, construction risk, flood period pre - alarm and longyangxia reservoir ' s function on construction of gongboxia are also studied, with an aim at presenting real interval flood forecast scheme and dispatching method, so as to provide technological support for gongboxia hydro - power station construction period

    本論文結合國家重點工程項目?公伯峽水電站的建設,以電站建設期施工渡汛為研究重點,從實施出發,分析黃河上游氣候特性和梯級水庫群的實際運行狀況,對施工渡汛中的主要問題?洪水流達時間、區間洪水預報、渡汛風險、汛期預警、龍羊峽水庫在渡汛中的作用等進行了比較全面深入的研究,目的在於提出可用於實際的區間洪水預報方案和調度方法,為公伯峽水電站施工期建設提供技術支撐。
  4. So a new method, the cascade matched filtering processing technique characterized by pre - stack multi points, is proposed, which uses iteration before stack and utilizes stack to improve the stability of the matching operator to realize the consistency of the two kinds of source record

    該技術在疊前通過逐步逼近法,並利用疊加手段提高匹配運算元的穩定性,實現提高2種震源記錄一致性的目的。
  5. The multistage constant modulus ( cm ) array is a cascade adaptive beamforming system that can recover several narrowband co - channel signals without training. the main idea of the smi - cma is to use smi to determine the initial weight for cma operation. the method can come up with the desire signal in despite of the interfering signal is stronger than the desire signal

    基於以上考慮,我們提出了基於smi - cma聯合自適應方法,該演算法可以分離多個同通道信源,由smi演算法決定cma演算法的初始權向量,在干擾信號較強時,仍有穩定的sinr輸出,具有較快的收斂速度。
  6. In order to calculate the high external water pressure, the rock seepage field and external water pressure coefficient should be treated in detail. concentrated on the questions of high external water pressure and flow of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied, the high external water pressure of jinping cascade 2 hydropower station is analyzed and studied in detail

    本文在總結前人研究成果的基礎上,圍繞深埋隧洞的突涌水和高外水壓力問題,系統地研究了深埋隧洞襯砌水荷載和外水壓力的作用機理及計算方法等理論,並對錦屏二級水電站深埋引水隧洞的外水壓力問題進行了詳細的分析和研究。
  7. A method of cascade control spatiotemporal chaos in coupled map lattice

    一種耦合映象格子中時空混沌的級聯控製法
  8. ( 2 ) the method of finite element discrete and optimal parameter back analysis is adopted. ( 3 ) concentrated on the question of high external water pressure of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied. ( 4 ) based on jinping cascade 2 hydropower station, numerical simulation rain infiltration of seepage field under different drainage pattern and grouting pattern are studied, also, the high external water pressure is analyzed and studied and some seepage control measures are put forward

    ( 2 )採用有限元離散?優化法進行參數的反演分析; ( 3 )針對深埋隧洞的高外水壓力問題,進一步分析和研究了襯砌水荷載及外水壓力的作用機理和計算方法; ( 4 )以錦屏二級水電站深埋長引水隧洞作為本文的主要研究對象,採用考慮降雨入滲滲流場分析的方法對排水方案和灌漿封堵方案不同情況下的滲流場的水頭分佈進行了數值模擬,並對其外水壓力進行了分析和研究,提出了滲流控制的具體措施。
  9. Enterprise product information ( epi ) metadata models of description and retrieval are designed, which are based on representation method of knowledge frame and cascade description method of product information character, so that describe the epi with a form based on keywords muster ( km ) and retrieve epi with a form based on km

    摘要採用基於知識的框架表示法和產品信息特徵的層次描述方法,設計企業中不同類型產品信息的描述元數據模型和檢索元數據模型,實現了產品生產者按照基於關鍵詞集合的方式來描述企業產品信息和客戶按照基於關鍵詞集合的方式來描述要檢索的企業產品信息。
  10. The classifier with ability of feature selection is studied to prepare for face cascade representation and to make it possible to detect and recognize face fast and accurately. finally, construction of an array of classifiers is researched, and an effective method to design classifiers of fast face detection and recognition with complex background is presented, which is able to radically discard redundant areas and realize a robust real - time face detection designed for complex background and recognition system with large face database. finally, a fast face detection and recognition system for images with complex background is proposed and implemented by combining face cascade representation and classifier design

    首先研究了在人臉檢測和識別中常用的分類器,比如符號函數、最近鄰、神經網路、 svm 、 adaboost等,選擇了適合於人臉檢測和識別的分類器,並提出了結合pca特徵和rbf進行人臉姿態的判別方法:其次研究了具有特徵選擇功能的分類器發計,這為人臉的級聯表示提供了條什,也為快速準確的人臉檢測和識別提供了可能;最後,對組合分類器設計進行了研究,提出了適于復雜背景下快速人臉檢測和識別的有效分類器設計方案,這使得人臉檢測和識別能夠快速剔除不感興趣區域,為復雜背景下實時人臉檢測和大型人臉庫的快速識別提供了可能。
  11. In the end, an evaluation system has been developed according to the cascade analytical method in order to make a scientific evaluation to the construction scheme, the project scheduling and the layout system of the drawings

    最後,本文利用層次分析法,開發了施工組織設計評價系統功能模塊,從而對施工方案、施工進度計劃和施工平面布置圖的確定做一個科學的、量化的評價。
  12. The hydropower cascade development is a complex work. it will involve many aspects of a compound ecosystem. but the quantitative study for basin environment effect is scarce and its theory and method system is still not integrated

    流域水電梯級開發是一項復雜而系統的工作,涉及到復合生態系統的多個方面,對流域開發的環境影響研究也一直都是理論界的一個研究熱點。
  13. The method for third harmonic generation of large - aperture high - power solid laser is described which is the second nonlinear effect of two cascade crystals in this paper

    摘要敘述了大口徑高功率固體激光器,利用兩塊級聯晶體的二階非線性效應,對激光輸出進行諧波轉換,實現三次諧波輸出的方法。
  14. Mixing - signal stimulation method can enhance dissipation of bipolar transistor evidently, especially first cascade amplifying circuits

    理論分析和實踐結果都表明,本文所提出的方法能有效地改善有源低熱器件的紅外熱圖像。
  15. With this program, the blade suit for flow parameters that was obtained from the meridional - flow program is designed. finally, the flow field of the cascade of the counter - turbine is simulated using the cfd program. the cfd program is based on the jameson cell - centered finite volume method

    最後對所設計出的對轉渦輪平面葉柵內部流場進行了初步數值計算,採用的計算格式為jamescn的具有二階精度的runge ? kutta四步顯式有限體積法,結合時間推進求解euler方程。
  16. A improved method of measuring dielectric loss angle of cascade voltage transformer

    串級式電壓互感器介損現場測試方法的改進
  17. High - resolution nnd scheme and fully implicit dual - time stepping method were adopted in the three - dimensional vibrating cascade flow calculation. thus, the correct simulation of the shock in transonic flow and the efficiency of calculation were both taken into consideration

    在三維振動葉柵流動數值模擬中,採用高解析度tvd類型的格式和全隱式雙時間方法,保證了對流動的正確模擬,準確地捕捉了跨音流動中的激波,其計算效率非常高。
  18. Several axial turbine and compressor geometry profile designs are presented. also some turbine and compressor sample cascade design cases and their calculated performance for different prescribed conditions are given and discussed. in the design procedure, the presented method in the paper shows its applicability and effectiveness, especially for modification of the proscribed velocity distribution

    本文對多個渦輪、壓氣機算例進行了優化設計和流場計算檢驗,結果表明,本文所提出的方法能對葉片表面速度分佈進行有效調節,減少了很多人工調控因素,使葉型設計技術得到了進一步的完善和提高。
  19. Then a laplace equation can be deduced and through computation, the blade profile coordinates and geometry of the cascade result from an analytical solution. next, an optimization method, taking the geometry parameters of the unclosed profile as its objective functions, is used to obtain an optimized blade profile. and last, the optimized profile is refined with round arcs added in the leading and trailing edges

    本文採用的勢、流函數解析法法中,將無旋方程用新的類無旋方程替代,這樣在計算域上得出速度場的解析關系式,計算得出初始葉型;然後以此初始葉型的幾何參數,例如前尾緣的封閉程度和葉型彎角等為目標函數,通過優化程序對初始速度進行自動調節直到目標函數值最小為止。
  20. Thirdly, concerning the rotation and the shear of portrait images, the face area can be detected accurately and rapidly by an effective algorithm of the cascade classifier based on adaboost learning method. so the adjustment of zoom is realized. and then, the normal shear is achieved ground on the projection method

    第三,針對實現圖像的縮放和裁切,採用基於adaboost學習的層疊分類器的人臉檢測方法快速準確地檢測出人臉區域,利用人臉區域的大小縮放圖像;並基於投影的方法實現圖像的標準裁切。
分享友人