cast in place concrete pile 中文意思是什麼

cast in place concrete pile 解釋
就地澆搗的
  • cast : vt (cast; cast)1 投,扔,擲,拋。 ★此義動詞通常用 throw cast 只用於若干特殊句子。2 丟棄,拋棄;...
  • in : adv 1 朝里,向內,在內。 A coat with a furry side in有皮裡子的外衣。 Come in please 請進來。 The ...
  • place : n 1 地方,場所,處;所在,位置;〈抽象名詞〉空間 (opp time)。2 (書中的)處所,頁。3 市區;市,...
  • concrete : adj 1 具體的,有形的;實在的,實際的。2 固結成的,混凝土製的。3 圖案詩歌的(參閱concrete poetry)...
  • pile : n 1 軟毛,絨毛;毛茸。2 (布、絨的)軟面。vt 使起絨。adj d 有絨毛的。n 痔瘡;〈pl 〉痔。 blind pi...
  1. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  2. Foundation optimization of a highrise building in beijing - analysis and first application of composite foundation with cast - in - place plain concrete pile driven by auger rig

    鉆孔壓灌素砼樁復合地基在北京地區高層建築中首次應用
  3. This differ with computation modal that design the foundation pier very big, bearing power too than design increment ; usage mechanics numerical analysis device with limited a logarithm of timw fitting method logt, noted the rock strength in stake tip of the borehole cast - in - place concrete pile to proceed with the structure steadiness the simulation compute to study with the fixed amount, designing for the engineering to start construction to provide for science with the spot

    本研究結合現場試驗、力學數值分析和有限單元分析,對巖溶地段鉆孔灌注樁的施工工藝、荷載傳遞機理、持力層頂板厚度及嵌巖深度等方面作一些探討性研究,為該工程的設計和施工積累經驗,並為該類課題的進一步研究奠定了基礎。
  4. This article aims at the characteristics of a baibie harbor great bridge, by the spot construction test and mechanicses, limited an analysis, dissolve to the construction technics and loading capacity, stake deliver mechanism, bearing stratum and glazing rock depth area curve etc. s of the borehole cast - in - place concrete pile in the karst terrain do the some study research

    國內外對于巖溶地區鉆孔灌注樁的研究,主要是針對具體工程的施工方案描述和施工故障及處理措施,對巖溶地段基樁的承載機理及承載力的綜合研究則未見報道。本文針對白墅港大橋的特點,通過現場施工試驗及力學、有限元分析,對巖溶地區鉆孔灌注樁的施工工藝、荷載傳遞機理、持力層厚度及嵌巖深度等方面做一些探討性研究。
  5. Abstract : the paper puts forward a strengthening plan of defective cast in - place short pile through quality accident analysis. the properties of no shrinkage and high mobility concrete, and its aplication for short pile strength are discussed. result for strengthening is ascertained by measuring. an effective method is given for this case

    文摘:本文就缺陷性鉆孔灌注短樁基礎進行了質量事故分析,提出了加固方案,評述了無收縮高流態混凝土的性能及其在加固中的應用,並對加固的效果進行了檢測,為特定條件下的類似短樁的加固處理提供了實例。
  6. Main characteristics of bearing capacity of cast - in - place pile under vertical load have been expounded by introduction to engineering course and analysis of experiment result. and application of test pile in concrete design has been probed

    摘要通過對工程試樁過程介紹及對結果的分析,總結了豎向荷載作用下嵌巖灌注樁承載力的主要特點,並對試樁在具體設計中的應用進行了探討。
分享友人