cast in place joint 中文意思是什麼
cast in place joint
解釋
現澆接頭 30-
1 summarization at present, super - length tall buildings are ever - increasing by popular. expansion and contraction joint is not supposed to be located or at least frequently located in average buildings for the requirements of their functions. the longest space between two expansion and contraction joint, which is set in code for structural design is frequently exceeded in cast - in - place frame structure
目前超長高層建築日見增多,由於功能以及使用上的需要,要求不設或少設伸縮縫,結構設計規范對現澆框架結構不設伸縮縫的最大間距的規定常常被突破,這就需要考慮溫度對結構的影響。
分享友人