cast in place 中文意思是什麼

cast in place 解釋
就地澆鑄
  • cast : vt (cast; cast)1 投,扔,擲,拋。 ★此義動詞通常用 throw cast 只用於若干特殊句子。2 丟棄,拋棄;...
  • in : adv 1 朝里,向內,在內。 A coat with a furry side in有皮裡子的外衣。 Come in please 請進來。 The ...
  • place : n 1 地方,場所,處;所在,位置;〈抽象名詞〉空間 (opp time)。2 (書中的)處所,頁。3 市區;市,...
  1. Applied of erecting by floating in pun down cast - in - place cantilever bridge

    浮船渡運法在拆除懸澆結構橋中的應用
  2. The stress status of concrete at face of sluice pier in the case of cold wave, pipe cooling and cast - in - place partial sluice pier and so on

    研究了寒潮、水管冷卻、整澆部分墻體等情況下閘墩表面混凝土應力分佈狀況。
  3. Directed against the problem on confirming vertical bearing capacity of large diameter cast - in - place pile in the west of coteau area of yunnan province, the paper, analyses the influence degree of the variety of soil physics and mechanics property in area geology condition on bearing capacity of pile foundation, through 5 piles " loading test ; the influence degree of construction technics on bearing capacity of pile foundation under the influence of every exterior factors ; the influence degree of grouting injection around the pile shaft on bearing capacity of pile foundation

    本文針對滇西山區大直徑灌注樁豎向承載力確定存在的問題,進行了5根試樁的靜載荷試驗,分析了區域地質條件下土的物理、力學性質的變化對橋梁樁基承載力的影響程度;地下水對樁承載力的影響程度;各種外部因素影響下,樁的施工工藝對樁承載力的影響程度;通過在樁體周圍土中注漿對樁承載力的影響程度。
  4. Discussion on the deformation analysis of the cracks in cast - in - place floor slab

    談現澆樓板裂縫的變形分析
  5. Construction technique of cast in place pile - foundation used in grade separation bridge on beijing - chengde expressway

    京承高速公路立交橋旋挖樁基礎施工技術
  6. Rotatory boring cast - in - place pile

    深基礎回轉鉆孔灌注樁
  7. The successful alternative was the cast-in-place segmental prestressed concrete box girder.

    最後採用的方案是分段現澆的預應力混凝土箱形梁。
  8. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  9. Secondly, we recommend the practical experiment of cast - in - place piles, including field solid and liquid qualification, experiment purpose, experiment project, experiment equipment, experiment process and the notice of experiment. thirdly, we processed and analyzed experimental daters, studied the rule of strength transferring, and studied the rule of strength transferring of check resistance and side of peg rub resistance, contrasting with common re - draw peg. at last, we advance some unfathomed problem and prospect foreground of cast - in - place piles

    本文首先對支盤樁的基本原理進行了闡述,對其施工過程以及成型過程進行了描述;然後對本次抗拔支盤樁現場試驗進行了介紹,包括試驗現場地質水文條件,試驗目的、試驗方案、試驗設備以及試驗過程,並對試驗注意事項進行了歸納總結;分析了支盤裝原位抗拔,研究了樁身軸力傳遞規律以及支盤阻力和樁側摩阻力的荷載傳遞規律,並與普通抗拔樁進行了相關對比;最後,本文提出了本次試驗尚未解決的一些問題,並對支盤樁的前景進行了展望。
  10. Construction of cast - in - place box beam of dongshengbei interchange bridge

    東勝北互通立交匝道橋現澆箱梁施工
  11. The superstructure of the bridge is a three - span ( 80m + 130m + 80m ) continuous rigid frame. the main piers are single - column flexible solid piers, whose foundation are 2. 0m dug piles. the abutments are light - type box abutments, whose foundation are 1. 2m bored cast - in - place piles

    該橋上部為80m + 130m + 80m三跨連續剛構;主墩為單柱柔性實體墩,其基礎為2 . 0m挖孔樁;橋臺為輕型箱式橋臺,其基礎為1 . 2m鉆孔樁。
  12. Monitoring control for cast - in - place cantilever construction

    懸臂澆築中的施工監測控制
  13. Standard test method for compressive strength of concrete cylinders cast in place in cylindrical molds

    在圓柱模型中現場澆注混凝土圓柱體的抗壓強度標準試驗方法
  14. At last, the load transmission property of cast - in - place piles, the developing cause of friction resistance and base resistance, and some factors which influence pile ' s bearing capacity and settlement are analyzed. then, we introduced two parameters, e and c to represent the disturbing effect in pile construction on parameters of modulus es and cohesive c, which determined by the pressed piles

    在這個基礎上進一步分析了打入樁的沉樁擠土效應對樁荷載傳遞的影響及其與靜壓樁的差異,在靜壓樁修正系數k _ c和k _ e保持不變的情況下,再引進打入擾動系數_ e和_ c ,以其和原來靜壓樁的k _ c和k _ e的乘積作為打入樁時的修正系數。
  15. Cast - in - place piles with expanded branches or plates based on common concrete bored piles are a new type of piles foundation which have the specialty of high vertically bearing capacity and have been marked both economic and social benefits. especially in the resist draw load, it indicates a broader application scope. however, because of the poor application of cast - in - place piles in the practices, almost all the experiments are based on modeling experiments

    擠擴支盤混凝土灌注樁是近年來工程界有較強生命力的新樁型,該樁型是採用仿生學的方法在原有等截面混凝土灌注樁的基礎上研發成功的,其顯著的特點就是具有較高的單方混凝土承載能力,具有良好的社會與經濟效益。
  16. Accidents treatment of cast - in - place bored pile in pile foundation construction

    鉆孔灌注樁基事故的處理
  17. 4. the side girders, the deck and the lateral beams of the cable - stayed structure are cast - in - place at one time

    4 、金馬大橋在施工過程中採用邊主梁、橫隔梁和橋面板三部分分階段一次現澆。
  18. Cast - in - place concrete

    現場澆注混凝土
  19. Road safety barriers. cast in place concrete separators and walls. special steel accessories

    道路安全隔欄.現場澆注混凝土隔離墩.專用鋼制附件
  20. The quantity direct control and trouble treatment of drill hole and cast - in - place pile

    鉆孔灌注樁的質量監督控制及事故處理
分享友人